EP3276524 - ACCESS CONTROL SYSTEM AND ACCESS CONTROL METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.07.2021 Database last updated on 29.07.2024 | |
Former | The patent has been granted Status updated on 24.07.2020 | ||
Former | Grant of patent is intended Status updated on 05.05.2020 | ||
Former | Request for examination was made Status updated on 29.12.2017 | ||
Former | The international publication has been made Status updated on 27.02.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Hitachi Solutions, Ltd. 12-7, Higashishinagawa 4-chome Shinagawa-ku Tokyo 140-0002 / JP | [2018/05] | Inventor(s) | 01 /
KIYOKAWA, Yuuichi c/o Hitachi Solutions, Ltd. 12-7 Higashishinagawa 4-chome Shinagawa-ku Tokyo 140-0002 / JP | 02 /
INOUE, Kouji c/o Hitachi Solutions, Ltd. 12-7 Higashishinagawa 4-chome Shinagawa-ku Tokyo 140-0002 / JP | 03 /
NAKAYAMA, Ryuuji c/o Hitachi Solutions, Ltd. 12-7 Higashishinagawa 4-chome Shinagawa-ku Tokyo 140-0002 / JP | 04 /
OTA, Hiroyuki c/o Hitachi Solutions, Ltd. 12-7 Higashishinagawa 4-chome Shinagawa-ku Tokyo 140-0002 / JP | [2018/05] | Representative(s) | Mewburn Ellis LLP Aurora Building Counterslip Bristol BS1 6BX / GB | [2020/35] |
Former [2018/05] | Moore, Graeme Patrick, et al Mewburn Ellis LLP City Tower 40 Basinghall Street London EC2V 5DE / GB | Application number, filing date | 16768084.2 | 06.01.2016 | [2018/05] | WO2016JP50210 | Priority number, date | JP20150062999 | 25.03.2015 Original published format: JP 2015062999 | [2018/05] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016152181 | Date: | 29.09.2016 | Language: | JA | [2016/39] | Type: | A1 Application with search report | No.: | EP3276524 | Date: | 31.01.2018 | Language: | EN | [2018/05] | Type: | B1 Patent specification | No.: | EP3276524 | Date: | 26.08.2020 | Language: | EN | [2020/35] | Search report(s) | International search report - published on: | JP | 29.09.2016 | (Supplementary) European search report - dispatched on: | EP | 27.11.2018 | Classification | IPC: | G06F21/62, G06F21/60, H04L29/06 | [2020/17] | CPC: |
G06F21/62 (EP,US);
G06F11/3485 (US);
G06F21/604 (EP,US);
G06F21/6218 (EP,US);
G06F21/6281 (EP,US);
H04L63/0236 (EP,US);
|
Former IPC [2018/52] | G06F21/62, H04L29/06 | ||
Former IPC [2018/05] | G06F21/62 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ZUGANGSSTEUERUNGSSYSTEM UND ZUGANGSSTEUERUNGSVERFAHREN | [2018/05] | English: | ACCESS CONTROL SYSTEM AND ACCESS CONTROL METHOD | [2018/05] | French: | SYSTÈME DE CONTRÔLE D'ACCÈS ET PROCÉDÉ DE CONTRÔLE D'ACCÈS | [2018/05] | Entry into regional phase | 27.02.2017 | Translation filed | 27.02.2017 | National basic fee paid | 27.02.2017 | Search fee paid | 27.02.2017 | Designation fee(s) paid | 27.02.2017 | Examination fee paid | Examination procedure | 27.02.2017 | Examination requested [2018/05] | 27.02.2017 | Date on which the examining division has become responsible | 14.01.2019 | Amendment by applicant (claims and/or description) | 06.05.2020 | Communication of intention to grant the patent | 14.07.2020 | Fee for grant paid | 14.07.2020 | Fee for publishing/printing paid | 14.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 27.05.2021 | No opposition filed within time limit [2021/31] | Fees paid | Renewal fee | 25.01.2018 | Renewal fee patent year 03 | 16.01.2019 | Renewal fee patent year 04 | 13.01.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.01.2016 | AL | 26.08.2020 | AT | 26.08.2020 | CY | 26.08.2020 | CZ | 26.08.2020 | DK | 26.08.2020 | EE | 26.08.2020 | ES | 26.08.2020 | FI | 26.08.2020 | HR | 26.08.2020 | IT | 26.08.2020 | LT | 26.08.2020 | LV | 26.08.2020 | MC | 26.08.2020 | MK | 26.08.2020 | NL | 26.08.2020 | PL | 26.08.2020 | RO | 26.08.2020 | RS | 26.08.2020 | SE | 26.08.2020 | SI | 26.08.2020 | SK | 26.08.2020 | SM | 26.08.2020 | TR | 26.08.2020 | BG | 26.11.2020 | NO | 26.11.2020 | GR | 27.11.2020 | IS | 26.12.2020 | PT | 28.12.2020 | GB | 06.01.2021 | IE | 06.01.2021 | LU | 06.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | FR | 31.01.2021 | LI | 31.01.2021 | [2024/29] |
Former [2024/22] | HU | 06.01.2016 | |
AL | 26.08.2020 | ||
AT | 26.08.2020 | ||
CY | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
MK | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
GB | 06.01.2021 | ||
IE | 06.01.2021 | ||
LU | 06.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2023/33] | HU | 06.01.2016 | |
AL | 26.08.2020 | ||
AT | 26.08.2020 | ||
CY | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
GB | 06.01.2021 | ||
IE | 06.01.2021 | ||
LU | 06.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2023/30] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CY | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
GB | 06.01.2021 | ||
IE | 06.01.2021 | ||
LU | 06.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/34] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
GB | 06.01.2021 | ||
IE | 06.01.2021 | ||
LU | 06.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/23] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
GB | 06.01.2021 | ||
IE | 06.01.2021 | ||
LU | 06.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/10] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
PT | 28.12.2020 | ||
GB | 06.01.2021 | ||
IE | 06.01.2021 | ||
LU | 06.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/07] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
GB | 06.01.2021 | ||
IE | 06.01.2021 | ||
LU | 06.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2021/52] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
GB | 06.01.2021 | ||
LU | 06.01.2021 | ||
CH | 31.01.2021 | ||
FR | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2021/49] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
GB | 06.01.2021 | ||
LU | 06.01.2021 | ||
FR | 31.01.2021 | ||
Former [2021/48] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
LU | 06.01.2021 | ||
FR | 31.01.2021 | ||
Former [2021/43] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
LU | 06.01.2021 | ||
Former [2021/40] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/36] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/34] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
IT | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/28] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/25] | AL | 26.08.2020 | |
AT | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
ES | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/23] | AT | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/22] | CZ | 26.08.2020 | |
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/21] | DK | 26.08.2020 | |
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/12] | FI | 26.08.2020 | |
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
NL | 26.08.2020 | ||
PL | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/10] | FI | 26.08.2020 | |
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
PL | 26.08.2020 | ||
RS | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/09] | FI | 26.08.2020 | |
LT | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
PT | 28.12.2020 | ||
Former [2021/08] | FI | 26.08.2020 | |
LT | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
PT | 28.12.2020 | ||
Former [2021/07] | FI | 26.08.2020 | |
LT | 26.08.2020 | ||
NO | 26.11.2020 | Documents cited: | Search | [XI]US2004078568 (PHAM DUC [US], et al) [X] 1,2,4,5 * abstract * * paragraphs [0002] , [0 12] - [0015] * * paragraph [0032] - paragraph [0035]; figure 1 * * paragraph [0036] - paragraph [0044]; figure 2 * * paragraph [0045] - paragraph [0046]; figure 3 * * paragraphs [0047] - [0048] - [0 58] - [0059]; figure 4 * * paragraph [0049] - paragraph [0054]; figures 5A-5B * [I] 3,6; | [I]EP1443729 (STONESOFT CORP [FI]) [I] 1-6 * abstract * * paragraphs [0001] , [00 9] - [0011] * * paragraph [0017] - paragraph [0019]; figure 1 ** paragraph [0021]; figure 2B *; | [I]WO2013126615 (PULSELOCKER INC [US]) [I] 1-6 * abstract * * claims 1, 4, 5 * * paragraph [0009] - paragraph [0018] * * paragraphs [0031] , [0 35] - [0039]; figure 1 * | International search | [Y]JP2007041631 (FUJITSU LTD) [Y] 1-6* , paragraphs [0036] to [0037] & US 2007/0061867 A1 paragraphs [0040] to [0041] *; | [Y]WO2009110275 (NEC CORP [JP], et al) [Y] 1-6 * , paragraphs [0057] to [0069], [0082] to [0084]; fig. 3, 4 & JP 5429157 B2 & US 2011/0035783 A1 paragraphs [0091] to [0093], [0096], [0109] to [0111]; fig. 3, 4 & CN 101960465 A * |