blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3350458

EP3350458 - ASSEMBLY OF SHEET-METAL ELEMENTS COMPRISING A RABBET [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.06.2022
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  09.07.2021
FormerGrant of patent is intended
Status updated on  29.03.2021
FormerExamination is in progress
Status updated on  06.05.2020
FormerRequest for examination was made
Status updated on  22.06.2018
FormerThe international publication has been made
Status updated on  25.03.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
PSA Automobiles SA
2-10 boulevard de l'Europe
78300 Poissy / FR
[2020/46]
Former [2018/30]For all designated states
PSA AUTOMOBILES S.A.
2-10 boulevard de l'Europe
78300 Poissy / FR
Inventor(s)01 / FERRAND, Stéphane
731 rue de Coignières
78760 Jouars Pontchartrain / FR
02 / LACOUR, Mathieu
54 rue de Villacoublay
Résidence les Bois
78140 Velizy Villacoublay / FR
 [2018/30]
Representative(s)Fernandez, Francis Lionel, et al
PSA Automobiles S.A.
VEIP - YT800
2-10 boulevard de l'Europe
78300 Poissy / FR
[N/P]
Former [2021/32]Fernandez, Francis Lionel, et al
PSA Automobiles SA
VEIP - VV1400
Route de Gisy
78140 Vélizy Villacoublay / FR
Former [2018/30]Fosse, Danièle
PSA Automobiles SA
VPIB - LG081
18 rue des Fauvelles
92250 La Garenne Colombes / FR
Application number, filing date16775298.909.09.2016
[2018/30]
WO2016FR52282
Priority number, dateFR2015005884118.09.2015         Original published format: FR 1558841
[2018/30]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2017046493
Date:23.03.2017
Language:FR
[2017/12]
Type: A1 Application with search report 
No.:EP3350458
Date:25.07.2018
Language:FR
The application published by WIPO in one of the EPO official languages on 23.03.2017 takes the place of the publication of the European patent application.
[2018/30]
Type: B1 Patent specification 
No.:EP3350458
Date:11.08.2021
Language:FR
[2021/32]
Search report(s)International search report - published on:EP23.03.2017
ClassificationIPC:F16B5/08, B23K11/11, B62D27/02, F16B11/00
[2018/30]
CPC:
F16B5/08 (EP); B23K11/11 (EP); B62D27/026 (EP);
F16B11/006 (EP); B23K2101/006 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/30]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ANORDNUNG AUS BLECHELEMENTEN MIT EINER FALZ[2018/30]
English:ASSEMBLY OF SHEET-METAL ELEMENTS COMPRISING A RABBET[2018/30]
French:ASSEMBLAGE D'ELEMENTS EN TÔLE METALLIQUE COMPRENANT UNE FEUILLURE[2018/30]
Entry into regional phase15.02.2018National basic fee paid 
15.02.2018Designation fee(s) paid 
15.02.2018Examination fee paid 
Examination procedure15.02.2018Examination requested  [2018/30]
15.02.2018Date on which the examining division has become responsible
24.08.2018Amendment by applicant (claims and/or description)
11.05.2020Despatch of a communication from the examining division (Time limit: M06)
06.11.2020Reply to a communication from the examining division
30.03.2021Communication of intention to grant the patent
05.07.2021Fee for grant paid
05.07.2021Fee for publishing/printing paid
05.07.2021Receipt of the translation of the claim(s)
Opposition(s)12.05.2022No opposition filed within time limit [2022/29]
Fees paidRenewal fee
21.09.2018Renewal fee patent year 03
19.09.2019Renewal fee patent year 04
17.09.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.09.2016
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
IE09.09.2021
LU09.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
[2024/22]
Former [2023/30]HU09.09.2016
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
IE09.09.2021
LU09.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2023/27]HU09.09.2016
AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
IE09.09.2021
LU09.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/37]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
IE09.09.2021
LU09.09.2021
BE30.09.2021
CH30.09.2021
LI30.09.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/36]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
IE09.09.2021
LU09.09.2021
BE30.09.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/35]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
IE09.09.2021
LU09.09.2021
BE30.09.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/34]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
LU09.09.2021
BE30.09.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/27]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/25]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/24]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/21]AT11.08.2021
DK11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/16]AT11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/10]AT11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/09]AT11.08.2021
FI11.08.2021
LT11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
PT13.12.2021
Former [2022/08]AT11.08.2021
FI11.08.2021
LT11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
Former [2022/07]AT11.08.2021
LT11.08.2021
NO11.11.2021
Cited inInternational search[A]GB2182996  (NISSAN MOTOR, et al) [A] 1* abstract *;
 [A]JP2000094141  (FUJI ELECTRIC CO LTD) [A] 1 * abstract *;
 [XI]JP2006213262  (MAZDA MOTOR) [X] 1,3,4,6,8-10 * figures 1-4 * [I] 5,7;
 [XI]FR2976544  (PEUGEOT CITROEN AUTOMOBILES SA [FR]) [X] 1,3,6,8-10 * page 1, line 11 * * page 3, line 5 - line 6 * * page 5, line 10 - line 11; figures 3-7 * [I] 2,5,7;
 [XI]WO2013126478  (PREMARK FEG LLC [US], et al) [X] 1,3,8,9 * abstract * * page 1; figure 4 * [I] 2,5,7
ExaminationGB2182996
 JP2000094141
 JP2006213262
 FR2976544
 WO2013126478
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.