EP3353927 - WIRELESS DEVICE ARCHITECTURE TO SUPPORT VERY-HIGH-RELIABILITY (VHR) COMMUNICATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.04.2021 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 01.05.2020 | ||
Former | Grant of patent is intended Status updated on 12.12.2019 | ||
Former | Examination is in progress Status updated on 13.04.2019 | ||
Former | Request for examination was made Status updated on 29.06.2018 | ||
Former | The international publication has been made Status updated on 01.04.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2018/31] | Inventor(s) | 01 /
LIN, Jamie Menjay c/o Qualcomm Incorporated 5775 Morehouse Drive San Diego, California 92121-1714 / US | 02 /
JIANG, Jing c/o Qualcomm Incorporated 5775 Morehouse Drive San Diego, California 92121-1714 / US | 03 /
JI, Tingfang c/o Qualcomm Incorporated 5775 Morehouse Drive San Diego, California 92121-1714 / US | 04 /
AZARIAN YAZDI, Kambiz c/o Qualcomm Incorporated 5775 Morehouse Drive San Diego, California 92121-1714 / US | 05 /
SORIAGA, Joseph Binamira c/o Qualcomm Incorporated 5775 Morehouse Drive San Diego, California 92121-1714 / US | [2018/31] | Representative(s) | Dunlop, Hugh Christopher, et al Maucher Jenkins Seventh Floor Offices Artillery House 11-19 Artillery Row London SW1P 1RT / GB | [N/P] |
Former [2018/31] | Dunlop, Hugh Christopher, et al Maucher Jenkins 26 Caxton Street London SW1H 0RJ / GB | Application number, filing date | 16775398.7 | 16.09.2016 | [2018/31] | WO2016US52218 | Priority number, date | US201562221534P | 21.09.2015 Original published format: US 201562221534 P | US201615081773 | 25.03.2016 Original published format: US201615081773 | [2018/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017053199 | Date: | 30.03.2017 | Language: | EN | [2017/13] | Type: | A1 Application with search report | No.: | EP3353927 | Date: | 01.08.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.03.2017 takes the place of the publication of the European patent application. | [2018/31] | Type: | B1 Patent specification | No.: | EP3353927 | Date: | 03.06.2020 | Language: | EN | [2020/23] | Search report(s) | International search report - published on: | EP | 30.03.2017 | Classification | IPC: | H04L1/04 | [2018/31] | CPC: |
H04L1/00 (EP,US);
H04L5/023 (CN,KR,US);
H04L1/0041 (CN,KR,US);
H04L1/04 (EP,CN,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/31] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ARCHITEKTUR EINER DRAHTLOSEN VORRICHTUNG ZUR UNTERSTÜTZUNG VON KOMMUNIKATION MIT SEHR HOHER ZUVERLÄSSIGKEIT (VHR) | [2018/31] | English: | WIRELESS DEVICE ARCHITECTURE TO SUPPORT VERY-HIGH-RELIABILITY (VHR) COMMUNICATION | [2018/31] | French: | ARCHITECTURE DE DISPOSITIF SANS FIL POUR PRENDRE EN CHARGE LA COMMUNICATION À TRÈS HAUTE FIABILITÉ (VHR) | [2018/31] | Entry into regional phase | 05.04.2018 | National basic fee paid | 05.04.2018 | Designation fee(s) paid | 05.04.2018 | Examination fee paid | Examination procedure | 31.07.2017 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 05.04.2018 | Examination requested [2018/31] | 05.04.2018 | Date on which the examining division has become responsible | 23.10.2018 | Amendment by applicant (claims and/or description) | 17.04.2019 | Despatch of a communication from the examining division (Time limit: M04) | 24.06.2019 | Reply to a communication from the examining division | 17.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 23.10.2019 | Reply to a communication from the examining division | 13.12.2019 | Communication of intention to grant the patent | 22.04.2020 | Fee for grant paid | 22.04.2020 | Fee for publishing/printing paid | 22.04.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20177172.2 / EP3726762 | Opposition(s) | 04.03.2021 | No opposition filed within time limit [2021/19] | Fees paid | Renewal fee | 05.07.2018 | Renewal fee patent year 03 | 11.09.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.09.2016 | AL | 03.06.2020 | AT | 03.06.2020 | CY | 03.06.2020 | CZ | 03.06.2020 | DK | 03.06.2020 | EE | 03.06.2020 | FI | 03.06.2020 | HR | 03.06.2020 | LT | 03.06.2020 | LV | 03.06.2020 | MC | 03.06.2020 | MK | 03.06.2020 | MT | 03.06.2020 | PL | 03.06.2020 | RO | 03.06.2020 | RS | 03.06.2020 | SI | 03.06.2020 | SK | 03.06.2020 | SM | 03.06.2020 | TR | 03.06.2020 | BG | 03.09.2020 | NO | 03.09.2020 | GR | 04.09.2020 | IE | 16.09.2020 | LU | 16.09.2020 | BE | 30.09.2020 | IS | 03.10.2020 | PT | 06.10.2020 | [2022/32] |
Former [2022/28] | HU | 16.09.2016 | |
AL | 03.06.2020 | ||
AT | 03.06.2020 | ||
CY | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MC | 03.06.2020 | ||
MT | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
TR | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IE | 16.09.2020 | ||
LU | 16.09.2020 | ||
BE | 30.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2022/27] | HU | 16.09.2016 | |
AL | 03.06.2020 | ||
AT | 03.06.2020 | ||
CY | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
MT | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
TR | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IE | 16.09.2020 | ||
LU | 16.09.2020 | ||
BE | 30.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/37] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IE | 16.09.2020 | ||
LU | 16.09.2020 | ||
BE | 30.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/36] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
LU | 16.09.2020 | ||
BE | 30.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/27] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
LU | 16.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/24] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SI | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/21] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
DK | 03.06.2020 | ||
EE | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/10] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
PL | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SK | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
IS | 03.10.2020 | ||
PT | 06.10.2020 | ||
Former [2021/09] | AL | 03.06.2020 | |
AT | 03.06.2020 | ||
CZ | 03.06.2020 | ||
EE | 03.06.2020 | ||
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RO | 03.06.2020 | ||
RS | 03.06.2020 | ||
SM | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
PT | 06.10.2020 | ||
Former [2021/04] | AL | 03.06.2020 | |
FI | 03.06.2020 | ||
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2021/01] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
BG | 03.09.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/51] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
RS | 03.06.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/50] | FI | 03.06.2020 | |
HR | 03.06.2020 | ||
LT | 03.06.2020 | ||
LV | 03.06.2020 | ||
NO | 03.09.2020 | ||
GR | 04.09.2020 | ||
Former [2020/48] | FI | 03.06.2020 | |
LT | 03.06.2020 | ||
NO | 03.09.2020 | ||
Former [2020/47] | LT | 03.06.2020 | |
NO | 03.09.2020 | Cited in | International search | [XYI]WO2009082160 (LG ELECTRONICS INC [KR], et al) [X] 1,2,4,16,17,19 * page 12, line 19 - page 22, line 18; figures 1,2,5 * [Y] 6-15,20-23 [I] 3,5,18; | [A]US2011235619 (CHONG CHIA-CHIN [US], et al) [A] 1-23 * paragraph [0007] ** paragraphs [0037] - [0041]; figure 6 *; | [A]WO2013070189 (RESEARCH IN MOTION LTD [CA], et al) [A] 1-23 * page 8, line 17 - page 14, line 14; figure 2 *; | [Y]US2015098412 (YERRAMALLI SRINIVAS [US], et al) [Y] 6-15,20-23 * paragraphs [0098] - [0131]; figures 8-10 * * paragraphs [0214] - [0220]; figure 20 * |