EP3353868 - CABLE GLAND ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.12.2022 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 21.01.2022 | ||
Former | Grant of patent is intended Status updated on 21.10.2021 | ||
Former | Examination is in progress Status updated on 14.09.2021 | ||
Former | Grant of patent is intended Status updated on 31.05.2021 | ||
Former | Examination is in progress Status updated on 22.10.2019 | ||
Former | Request for examination was made Status updated on 29.06.2018 | ||
Former | The international publication has been made Status updated on 01.04.2017 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Hubbell Limited Cannon Place 78 Cannon Street London, Greater London EC4 6AF / GB | [2018/31] | Inventor(s) | 01 /
JACKSON, Carl 9A Lakes Road Dukinfield Tameside Cheshire SK16 4TP / GB | 02 /
CLARK, Jason 149 Lodge Lane Dukinfield Cheshire SK16 5JF / GB | [2018/31] | Representative(s) | Barker Brettell LLP 100 Hagley Road Edgbaston Birmingham B16 8QQ / GB | [2018/31] | Application number, filing date | 16775845.7 | 23.09.2016 | [2018/31] | WO2016GB52980 | Priority number, date | GB20150017031 | 25.09.2015 Original published format: GB 201517031 | [2018/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017051197 | Date: | 30.03.2017 | Language: | EN | [2017/13] | Type: | A1 Application with search report | No.: | EP3353868 | Date: | 01.08.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.03.2017 takes the place of the publication of the European patent application. | [2018/31] | Type: | B1 Patent specification | No.: | EP3353868 | Date: | 23.02.2022 | Language: | EN | [2022/08] | Search report(s) | International search report - published on: | EP | 30.03.2017 | Classification | IPC: | H02G3/06 | [2021/24] | CPC: |
H02G15/013 (EP,GB,US);
H02G15/007 (EP,GB,US);
F16L5/02 (EP,GB,US);
F16L5/06 (GB);
G02B6/4248 (GB);
G02B6/4471 (US);
G02B6/44775 (EP,GB);
H02G3/0666 (US);
H02G3/0675 (EP);
F16L5/10 (EP,US)
(-)
|
Former IPC [2018/31] | H02G3/06, H02G15/013, H02G15/007, F16L5/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/31] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KABELVERSCHRAUBUNGSANORDNUNG | [2018/31] | English: | CABLE GLAND ASSEMBLY | [2018/31] | French: | ENSEMBLE PRESSE-ÉTOUPE | [2018/31] | Entry into regional phase | 15.03.2018 | National basic fee paid | 15.03.2018 | Designation fee(s) paid | 15.03.2018 | Examination fee paid | Examination procedure | 15.03.2018 | Examination requested [2018/31] | 15.03.2018 | Date on which the examining division has become responsible | 12.11.2018 | Amendment by applicant (claims and/or description) | 25.10.2019 | Despatch of a communication from the examining division (Time limit: M06) | 14.04.2020 | Reply to a communication from the examining division | 06.11.2020 | Despatch of a communication from the examining division (Time limit: M04) | 27.01.2021 | Reply to a communication from the examining division | 01.06.2021 | Communication of intention to grant the patent | 14.09.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 21.10.2021 | Communication of intention to grant the patent | 18.01.2022 | Fee for grant paid | 18.01.2022 | Fee for publishing/printing paid | 18.01.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 24.11.2022 | No opposition filed within time limit [2023/05] | Fees paid | Renewal fee | 20.09.2018 | Renewal fee patent year 03 | 25.09.2019 | Renewal fee patent year 04 | 28.09.2020 | Renewal fee patent year 05 | 30.09.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.09.2016 | AL | 23.02.2022 | AT | 23.02.2022 | CY | 23.02.2022 | CZ | 23.02.2022 | DK | 23.02.2022 | EE | 23.02.2022 | ES | 23.02.2022 | FI | 23.02.2022 | HR | 23.02.2022 | IT | 23.02.2022 | LT | 23.02.2022 | LV | 23.02.2022 | MC | 23.02.2022 | MK | 23.02.2022 | NL | 23.02.2022 | PL | 23.02.2022 | RO | 23.02.2022 | RS | 23.02.2022 | SE | 23.02.2022 | SI | 23.02.2022 | SK | 23.02.2022 | SM | 23.02.2022 | BG | 23.05.2022 | GR | 24.05.2022 | IS | 23.06.2022 | PT | 23.06.2022 | IE | 23.09.2022 | LU | 23.09.2022 | BE | 30.09.2022 | CH | 30.09.2022 | LI | 30.09.2022 | [2024/27] |
Former [2024/21] | HU | 23.09.2016 | |
AL | 23.02.2022 | ||
AT | 23.02.2022 | ||
CY | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 23.09.2022 | ||
LU | 23.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2024/18] | HU | 23.09.2016 | |
AL | 23.02.2022 | ||
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 23.09.2022 | ||
LU | 23.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2023/42] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 23.09.2022 | ||
LU | 23.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2023/35] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
IT | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 23.09.2022 | ||
LU | 23.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2023/33] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
IE | 23.09.2022 | ||
LU | 23.09.2022 | ||
Former [2023/30] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
LU | 23.09.2022 | ||
Former [2023/22] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
MC | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/10] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SI | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2023/01] | AL | 23.02.2022 | |
AT | 23.02.2022 | ||
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/49] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SK | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/48] | AT | 23.02.2022 | |
CZ | 23.02.2022 | ||
DK | 23.02.2022 | ||
EE | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/47] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RO | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
SM | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/46] | AT | 23.02.2022 | |
DK | 23.02.2022 | ||
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/42] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
IS | 23.06.2022 | ||
PT | 23.06.2022 | ||
Former [2022/39] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
FI | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/36] | AT | 23.02.2022 | |
ES | 23.02.2022 | ||
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
LV | 23.02.2022 | ||
NL | 23.02.2022 | ||
PL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
GR | 24.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/35] | ES | 23.02.2022 | |
HR | 23.02.2022 | ||
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
RS | 23.02.2022 | ||
SE | 23.02.2022 | ||
BG | 23.05.2022 | ||
PT | 23.06.2022 | ||
Former [2022/34] | ES | 23.02.2022 | |
LT | 23.02.2022 | ||
NL | 23.02.2022 | ||
PT | 23.06.2022 | ||
Former [2022/33] | LT | 23.02.2022 | Cited in | International search | [XI]DE3633208 (SPINNER GMBH ELEKTROTECH [DE]) [X] 1-11,17-26,29,30 * the whole document * [I] 12-16,27,28; | [XI]DE19738517 (HUMMEL ANTON VERWALTUNG [DE]) [X] 1-12,15-26,29,30 * figure 3 * [I] 13,14,27,28; | [XI]US2015048614 (COYLE JR WILLIAM J [US]) [X] 1-12,15-26,29,30 * paragraph [0026] - paragraph [0033] *[I] 13,14,27,28; | [XI]US2015200531 (CHIU TEH-TSUNG [TW]) [X] 1-12,15-30 * the whole document * [I] 13,14 |