blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3282628

EP3282628 - METHOD AND DEVICE FOR TRANSMITTING AND RECEIVING PLURALITY OF D2D SIGNALS IN WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  07.04.2023
Database last updated on 09.07.2024
FormerThe patent has been granted
Status updated on  29.04.2022
FormerGrant of patent is intended
Status updated on  29.11.2021
FormerExamination is in progress
Status updated on  24.04.2019
FormerRequest for examination was made
Status updated on  12.01.2018
FormerThe international publication has been made
Status updated on  07.11.2017
Most recent event   Tooltip19.01.2024Lapse of the patent in a contracting state
New state(s): MC
published on 21.02.2024  [2024/08]
Applicant(s)For all designated states
LG Electronics Inc.
128, Yeoui-daero
Yeongdeungpo-gu
Seoul 07336 / KR
[2018/07]
Inventor(s)01 / CHAE, Hyukjin
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
02 / SEO, Hanbyul
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
03 / LEE, Seungmin
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
 [2018/07]
Representative(s)Frenkel, Matthias Alexander
Wuesthoff & Wuesthoff
Patentanwälte und Rechtsanwalt PartG mbB
Schweigerstraße 2
81541 München / DE
[N/P]
Former [2022/22]Frenkel, Matthias Alexander
Wuesthoff & Wuesthoff
Patentanwälte PartG mbB
Schweigerstraße 2
81541 München / DE
Former [2018/07]Frenkel, Matthias Alexander
Wuesthoff & Wuesthoff
Patentanwälte PartG mbB
Schweigerstrasse 2
81541 München / DE
Application number, filing date16776917.308.04.2016
[2018/07]
WO2016KR03723
Priority number, dateUS201562144916P08.04.2015         Original published format: US 201562144916 P
US201562150234P20.04.2015         Original published format: US 201562150234 P
US201562174539P12.06.2015         Original published format: US 201562174539 P
US201562251088P04.11.2015         Original published format: US 201562251088 P
[2018/07]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016163814
Date:13.10.2016
Language:KO
[2016/41]
Type: A1 Application with search report 
No.:EP3282628
Date:14.02.2018
Language:EN
[2018/07]
Type: B1 Patent specification 
No.:EP3282628
Date:01.06.2022
Language:EN
[2022/22]
Search report(s)International search report - published on:KR13.10.2016
(Supplementary) European search report - dispatched on:EP16.10.2018
ClassificationIPC:H04L5/00
[2018/46]
CPC:
H04L5/14 (EP,US); H04W72/25 (KR); H04W48/16 (US);
H04L27/2614 (KR); H04L5/00 (US); H04L5/0007 (KR);
H04L5/0012 (EP); H04L5/0048 (EP,US); H04L5/0082 (EP,US);
H04W48/08 (US); H04W72/02 (KR); H04W72/0446 (US);
H04W72/53 (KR); H04W8/005 (KR); H04W92/18 (KR) (-)
Former IPC [2018/07]H04L5/00, H04L5/14
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/07]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM SENDEN UND EMPFANGEN EINER VIELZAHL VON D2D-SIGNALEN IN EINEM DRAHTLOSKOMMUNIKATIONSSYSTEM[2018/07]
English:METHOD AND DEVICE FOR TRANSMITTING AND RECEIVING PLURALITY OF D2D SIGNALS IN WIRELESS COMMUNICATION SYSTEM[2018/07]
French:PROCÉDÉ ET DISPOSITIF PERMETTANT D'ÉMETTRE ET DE RECEVOIR UNE PLURALITÉ DE SIGNAUX DE DISPOSITIF À DISPOSITIF (D2D) DANS UN SYSTÈME DE COMMUNICATION SANS FIL[2018/07]
Entry into regional phase07.11.2017Translation filed 
07.11.2017National basic fee paid 
07.11.2017Search fee paid 
07.11.2017Designation fee(s) paid 
07.11.2017Examination fee paid 
Examination procedure07.11.2017Examination requested  [2018/07]
07.11.2017Date on which the examining division has become responsible
05.04.2019Amendment by applicant (claims and/or description)
26.04.2019Despatch of a communication from the examining division (Time limit: M04)
02.09.2019Reply to a communication from the examining division
27.09.2019Despatch of a communication from the examining division (Time limit: M04)
10.01.2020Reply to a communication from the examining division
05.02.2020Despatch of a communication from the examining division (Time limit: M04)
15.06.2020Reply to a communication from the examining division
29.06.2020Despatch of a communication from the examining division (Time limit: M04)
14.10.2020Reply to a communication from the examining division
25.10.2021Cancellation of oral proceeding that was planned for 05.11.2021
05.11.2021Date of oral proceedings (cancelled)
30.11.2021Communication of intention to grant the patent
15.03.2022Fee for grant paid
15.03.2022Fee for publishing/printing paid
15.03.2022Receipt of the translation of the claim(s)
Opposition(s)02.03.2023No opposition filed within time limit [2023/19]
Fees paidRenewal fee
23.04.2018Renewal fee patent year 03
23.04.2019Renewal fee patent year 04
27.04.2020Renewal fee patent year 05
29.04.2021Renewal fee patent year 06
25.04.2022Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL01.06.2022
AT01.06.2022
CZ01.06.2022
DK01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
MC01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SI01.06.2022
SK01.06.2022
SM01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
[2024/08]
Former [2023/25]AL01.06.2022
AT01.06.2022
CZ01.06.2022
DK01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SI01.06.2022
SK01.06.2022
SM01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/21]AL01.06.2022
AT01.06.2022
CZ01.06.2022
DK01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/17]AL01.06.2022
AT01.06.2022
CZ01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/12]AT01.06.2022
CZ01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
IS01.10.2022
PT03.10.2022
Former [2023/09]AT01.06.2022
CZ01.06.2022
EE01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RO01.06.2022
RS01.06.2022
SE01.06.2022
SK01.06.2022
SM01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
PT03.10.2022
Former [2023/08]AT01.06.2022
ES01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RS01.06.2022
SE01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
Former [2023/07]AT01.06.2022
FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RS01.06.2022
SE01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
Former [2023/02]FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
NL01.06.2022
PL01.06.2022
RS01.06.2022
SE01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
Former [2022/50]FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
PL01.06.2022
RS01.06.2022
SE01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
Former [2022/49]FI01.06.2022
HR01.06.2022
LT01.06.2022
LV01.06.2022
SE01.06.2022
BG01.09.2022
NO01.09.2022
GR02.09.2022
Former [2022/47]FI01.06.2022
LT01.06.2022
SE01.06.2022
NO01.09.2022
Documents cited:Search[XI]US2014269558  (SARTORI PHILIPPE [US], et al)
International search[A]US2013109301  (HAKOLA SAMI-JUKKA [FI], et al);
 [Y]US2014056220  (POITAU GWENAEL [CA], et al);
 [A]US2015043448  (CHATTERJEE DEBDEEP [US], et al);
 [YA]KR20150017682  ;
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.