EP3518720 - SUCTION NOZZLE AND HARD-SURFACE SUCTION APPARATUS [Right-click to bookmark this link] | |||
Former [2019/32] | SUCTION NOZZLE AND A HARD-SURFACE SUCTION DEVICE | ||
[2020/08] | Status | Patent maintained as amended Status updated on 03.05.2024 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 29.05.2020 | ||
Former | Grant of patent is intended Status updated on 10.02.2020 | ||
Former | Request for examination was made Status updated on 05.07.2019 | ||
Former | The international publication has been made Status updated on 07.04.2018 | Most recent event Tooltip | 03.05.2024 | Patent maintained (B2 publication) | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Alfred Kärcher SE & Co. KG Alfred-Kärcher-Strasse 28-40 71364 Winnenden / DE | [2019/32] | Inventor(s) | 01 /
BARTEL, Sandra Wildeckerstrasse 4 74199 Untergruppenbach / DE | 02 /
STEWEN, Christian Veilchenweg 38 71672 Marbach / DE | 03 /
FROHMADER, Christoph Am Striegl 12 92286 Rieden / DE | 04 /
DIEGEL, Tony-Dominik Bachstrasse 9/1 71397 Leutenbach / DE | 05 /
ZUGER, Jürgen Hügelweg 4 70839 Gerlingen / DE | [2019/32] | Representative(s) | Hoeger, Stellrecht & Partner Patentanwälte mbB Uhlandstrasse 14c 70182 Stuttgart / DE | [2019/32] | Application number, filing date | 16777638.4 | 28.09.2016 | [2019/32] | WO2016EP73129 | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2018059679 | Date: | 05.04.2018 | Language: | DE | [2018/14] | Type: | A1 Application with search report | No.: | EP3518720 | Date: | 07.08.2019 | Language: | DE | The application published by WIPO in one of the EPO official languages on 05.04.2018 takes the place of the publication of the European patent application. | [2019/32] | Type: | B1 Patent specification | No.: | EP3518720 | Date: | 01.07.2020 | Language: | DE | [2020/27] | Type: | B2 New European patent specification | No.: | EP3518720 | Date: | 05.06.2024 | Language: | DE | [2024/23] | Search report(s) | International search report - published on: | EP | 05.04.2018 | Classification | IPC: | A47L1/05 | [2019/32] | CPC: |
A47L1/05 (EP);
A47L1/16 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/32] | Title | German: | SAUGDÜSE UND HARTFLÄCHENABSAUGGERÄT | [2019/32] | English: | SUCTION NOZZLE AND HARD-SURFACE SUCTION APPARATUS | [2020/08] | French: | BUSE D'ASPIRATION ET APPAREIL D'ASPIRATION DE SURFACES DURES | [2020/08] |
Former [2019/32] | SUCTION NOZZLE AND A HARD-SURFACE SUCTION DEVICE | ||
Former [2019/32] | BUSE D'ASPIRATION ET APPAREIL D'ASPIRATION POUR SURFACES DURES | Entry into regional phase | 20.03.2019 | National basic fee paid | 20.03.2019 | Designation fee(s) paid | 20.03.2019 | Examination fee paid | Examination procedure | 20.03.2019 | Examination requested [2019/32] | 20.03.2019 | Date on which the examining division has become responsible | 06.11.2019 | Amendment by applicant (claims and/or description) | 11.02.2020 | Communication of intention to grant the patent | 26.05.2020 | Fee for grant paid | 26.05.2020 | Fee for publishing/printing paid | 26.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
01.04.2021
Leifheit AG Leifheitstrasse 56377 Nassau / DE Opponent's representative btb IP Bungartz Baltzer Partnerschaft mbB Patentanwälte Im Mediapark 6A 50670 Köln / DE | [2021/18] | 16.04.2021 | Invitation to proprietor to file observations on the notice of opposition | 25.08.2021 | Reply of patent proprietor to notice(s) of opposition | 15.03.2023 | Legal effect of interlocutory decision in opposition | 15.03.2023 | Date of oral proceedings | 18.09.2023 | Despatch of interlocutory decision in opposition | 29.01.2024 | Despatch of communication that the patent will be maintained as amended | Fees paid | Renewal fee | 20.03.2019 | Renewal fee patent year 03 | 25.09.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.09.2016 | AL | 01.07.2020 | CY | 01.07.2020 | CZ | 01.07.2020 | DK | 01.07.2020 | EE | 01.07.2020 | ES | 01.07.2020 | FI | 01.07.2020 | HR | 01.07.2020 | IT | 01.07.2020 | LT | 01.07.2020 | LV | 01.07.2020 | MC | 01.07.2020 | MK | 01.07.2020 | MT | 01.07.2020 | NL | 01.07.2020 | RO | 01.07.2020 | RS | 01.07.2020 | SE | 01.07.2020 | SI | 01.07.2020 | SK | 01.07.2020 | SM | 01.07.2020 | TR | 01.07.2020 | IE | 28.09.2020 | LU | 28.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | BG | 01.10.2020 | NO | 01.10.2020 | GR | 02.10.2020 | IS | 01.11.2020 | PT | 02.11.2020 | AT | 28.09.2021 | [2023/07] |
Former [2022/32] | HU | 28.09.2016 | |
AL | 01.07.2020 | ||
CY | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
MK | 01.07.2020 | ||
MT | 01.07.2020 | ||
NL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
TR | 01.07.2020 | ||
IE | 28.09.2020 | ||
LU | 28.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2022/28] | HU | 28.09.2016 | |
AL | 01.07.2020 | ||
CY | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
MT | 01.07.2020 | ||
NL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
TR | 01.07.2020 | ||
IE | 28.09.2020 | ||
LU | 28.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2022/27] | HU | 28.09.2016 | |
AL | 01.07.2020 | ||
CY | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MT | 01.07.2020 | ||
NL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
TR | 01.07.2020 | ||
IE | 28.09.2020 | ||
LU | 28.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/37] | AL | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
IE | 28.09.2020 | ||
LU | 28.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/36] | AL | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 28.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/28] | AL | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 28.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/27] | AL | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 28.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/25] | AL | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/22] | CZ | 01.07.2020 | |
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/20] | CZ | 01.07.2020 | |
DK | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/17] | CZ | 01.07.2020 | |
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/11] | CZ | 01.07.2020 | |
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/09] | CZ | 01.07.2020 | |
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/08] | ES | 01.07.2020 | |
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/07] | FI | 01.07.2020 | |
LT | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
Former [2021/01] | BG | 01.10.2020 | Cited in | International search | [A]EP2837316 (HOOVER LTD [GB]); | [A]DE102013021277 (NILFISK ADVANCE AS [DK]); | [A]DE202016100286U (LEIFHEIT AG [DE]); | [A]WO2016029967 (KAERCHER GMBH & CO KG ALFRED [DE]) | Opposition | US6112367 | US2003028995 | WO2012119933 | WO2014198559 | EP2837316 | DE102013021277 | EP2929819 | DE202016100286U | WO2016029967 | GB504083 | WO9851203 | US7185388 |