EP3449590 - SYSTEMS, METHODS AND DEVICES FOR UPLINK CONTROL INFORMATION ENHANCEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.08.2022 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 17.09.2021 | ||
Former | Grant of patent is intended Status updated on 06.04.2021 | ||
Former | Request for examination was made Status updated on 23.03.2021 | ||
Former | Grant of patent is intended Status updated on 30.11.2020 | ||
Former | Request for examination was made Status updated on 01.02.2019 | ||
Former | The international publication has been made Status updated on 03.11.2017 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Apple Inc. One Apple Park Way Cupertino, CA 95014 / US | [2020/52] |
Former [2019/10] | For all designated states Intel IP Corporation 2200 Mission College Boulevard Santa Clara, CA 95054 / US | Inventor(s) | 01 /
CHANG, Wenting 8F Raycom Infotech Park A No.2 Kexueyuan South Road Beijing 100190 / CN | 02 /
XIONG, Gang 16682 NW Arizona Drive Beaverton, OR 97006 / US | 03 /
MONDAL, Bishwarup 7130 Rainbow Drive Unit 2 San Jose, CA 95129 / US | 04 /
ZHANG, Yushu 8F Raycom Info Park A No.2 Kexueyuan South Road Haidian District Beijing 100190 / CN | 05 /
ZHU, Yuan Room 605 Building 16 Moliyuan Beiyuan Jiayuan Chaoyang District Beijing 100012 / CN | [2019/10] | Representative(s) | Barnfather, Karl Jon Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [2021/42] |
Former [2019/10] | Goddar, Heinz J., et al Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | Application number, filing date | 16778553.4 | 20.09.2016 | [2019/10] | WO2016US52653 | Priority number, date | US201662329753P | 29.04.2016 Original published format: US 201662329753 P | [2019/10] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017189034 | Date: | 02.11.2017 | Language: | EN | [2017/44] | Type: | A1 Application with search report | No.: | EP3449590 | Date: | 06.03.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.11.2017 takes the place of the publication of the European patent application. | [2019/10] | Type: | B1 Patent specification | No.: | EP3449590 | Date: | 20.10.2021 | Language: | EN | [2021/42] | Search report(s) | International search report - published on: | EP | 02.11.2017 | Classification | IPC: | H04L5/00, // H04L5/14 | [2020/50] | CPC: |
H04L5/0096 (EP);
H04L5/0055 (EP);
H04L5/0057 (EP);
H04L5/1469 (EP)
|
Former IPC [2019/10] | H04L5/00, H04L5/14 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/10] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEME, VERFAHREN UND VORRICHTUNGEN FÜR ERWEITERTE UPLINK-STEUERUNGSINFORMATIONEN | [2019/10] | English: | SYSTEMS, METHODS AND DEVICES FOR UPLINK CONTROL INFORMATION ENHANCEMENT | [2019/10] | French: | SYSTÈMES, PROCÉDÉS ET DISPOSITIFS POUR L'AMÉLIORATION D'INFORMATIONS DE COMMANDE DE LIAISON MONTANTE | [2019/10] | Entry into regional phase | 19.09.2018 | National basic fee paid | 19.09.2018 | Designation fee(s) paid | 19.09.2018 | Examination fee paid | Examination procedure | 19.09.2018 | Examination requested [2019/10] | 19.09.2018 | Date on which the examining division has become responsible | 17.06.2019 | Amendment by applicant (claims and/or description) | 01.12.2020 | Communication of intention to grant the patent | 19.03.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 07.04.2021 | Communication of intention to grant the patent | 11.08.2021 | Fee for grant paid | 11.08.2021 | Fee for publishing/printing paid | 11.08.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 21.07.2022 | No opposition filed within time limit [2022/39] | Fees paid | Renewal fee | 19.09.2018 | Renewal fee patent year 03 | 13.09.2019 | Renewal fee patent year 04 | 14.09.2020 | Renewal fee patent year 05 | 10.09.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.09.2016 | AL | 20.10.2021 | AT | 20.10.2021 | CY | 20.10.2021 | CZ | 20.10.2021 | DK | 20.10.2021 | EE | 20.10.2021 | ES | 20.10.2021 | FI | 20.10.2021 | HR | 20.10.2021 | IT | 20.10.2021 | LT | 20.10.2021 | LV | 20.10.2021 | MC | 20.10.2021 | MK | 20.10.2021 | NL | 20.10.2021 | PL | 20.10.2021 | RO | 20.10.2021 | RS | 20.10.2021 | SE | 20.10.2021 | SI | 20.10.2021 | SK | 20.10.2021 | SM | 20.10.2021 | BG | 20.01.2022 | NO | 20.01.2022 | GR | 21.01.2022 | IS | 20.02.2022 | PT | 21.02.2022 | [2024/27] |
Former [2024/21] | HU | 20.09.2016 | |
AL | 20.10.2021 | ||
AT | 20.10.2021 | ||
CY | 20.10.2021 | ||
CZ | 20.10.2021 | ||
DK | 20.10.2021 | ||
EE | 20.10.2021 | ||
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
IT | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
MC | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RO | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
SI | 20.10.2021 | ||
SK | 20.10.2021 | ||
SM | 20.10.2021 | ||
BG | 20.01.2022 | ||
NO | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2024/18] | HU | 20.09.2016 | |
AL | 20.10.2021 | ||
AT | 20.10.2021 | ||
CZ | 20.10.2021 | ||
DK | 20.10.2021 | ||
EE | 20.10.2021 | ||
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
IT | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
MC | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RO | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
SI | 20.10.2021 | ||
SK | 20.10.2021 | ||
SM | 20.10.2021 | ||
BG | 20.01.2022 | ||
NO | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2023/27] | AL | 20.10.2021 | |
AT | 20.10.2021 | ||
CZ | 20.10.2021 | ||
DK | 20.10.2021 | ||
EE | 20.10.2021 | ||
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
IT | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
MC | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RO | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
SI | 20.10.2021 | ||
SK | 20.10.2021 | ||
SM | 20.10.2021 | ||
BG | 20.01.2022 | ||
NO | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2023/22] | AL | 20.10.2021 | |
AT | 20.10.2021 | ||
CZ | 20.10.2021 | ||
DK | 20.10.2021 | ||
EE | 20.10.2021 | ||
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
MC | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RO | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
SI | 20.10.2021 | ||
SK | 20.10.2021 | ||
SM | 20.10.2021 | ||
BG | 20.01.2022 | ||
NO | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2023/01] | AL | 20.10.2021 | |
AT | 20.10.2021 | ||
CZ | 20.10.2021 | ||
DK | 20.10.2021 | ||
EE | 20.10.2021 | ||
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RO | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
SI | 20.10.2021 | ||
SK | 20.10.2021 | ||
SM | 20.10.2021 | ||
BG | 20.01.2022 | ||
NO | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2022/49] | AL | 20.10.2021 | |
AT | 20.10.2021 | ||
CZ | 20.10.2021 | ||
DK | 20.10.2021 | ||
EE | 20.10.2021 | ||
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RO | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
SK | 20.10.2021 | ||
SM | 20.10.2021 | ||
BG | 20.01.2022 | ||
NO | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2022/35] | AT | 20.10.2021 | |
CZ | 20.10.2021 | ||
DK | 20.10.2021 | ||
EE | 20.10.2021 | ||
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RO | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
SK | 20.10.2021 | ||
SM | 20.10.2021 | ||
BG | 20.01.2022 | ||
NO | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2022/34] | AT | 20.10.2021 | |
EE | 20.10.2021 | ||
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RO | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
SM | 20.10.2021 | ||
BG | 20.01.2022 | ||
NO | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2022/33] | AT | 20.10.2021 | |
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
SM | 20.10.2021 | ||
BG | 20.01.2022 | ||
NO | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2022/25] | AT | 20.10.2021 | |
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
BG | 20.01.2022 | ||
NO | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2022/24] | AT | 20.10.2021 | |
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
NL | 20.10.2021 | ||
PL | 20.10.2021 | ||
RS | 20.10.2021 | ||
SE | 20.10.2021 | ||
BG | 20.01.2022 | ||
GR | 21.01.2022 | ||
IS | 20.02.2022 | ||
PT | 21.02.2022 | ||
Former [2022/23] | AT | 20.10.2021 | |
ES | 20.10.2021 | ||
FI | 20.10.2021 | ||
HR | 20.10.2021 | ||
LT | 20.10.2021 | ||
LV | 20.10.2021 | ||
PL | 20.10.2021 | ||
RS | 20.10.2021 | ||
BG | 20.01.2022 | ||
PT | 21.02.2022 | ||
Former [2022/22] | AT | 20.10.2021 | |
FI | 20.10.2021 | ||
LT | 20.10.2021 | ||
RS | 20.10.2021 | ||
BG | 20.01.2022 | ||
Former [2022/21] | AT | 20.10.2021 | |
RS | 20.10.2021 | ||
BG | 20.01.2022 | ||
Former [2022/19] | BG | 20.01.2022 | Cited in | International search | [A] - NOKIA NETWORKS, "Dynamic PUCCH format adaptation", vol. RAN WG1, no. Anaheim, USA; 20151115 - 20151122, (20151115), 3GPP DRAFT; R1-157126, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20151115), XP051003394 [A] 1-25 * page 2 * | [A] - CATT, "Resource allocation for PUCCH format 4 and 5", vol. RAN WG1, no. Anaheim, USA; 20151115 - 20151122, (20151115), 3GPP DRAFT; R1-156569, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20151115), XP051039882 [A] 1-25 * page 2 * |