EP3352870 - MOTOR-OPERATED MODEL VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.04.2022 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 23.04.2021 | ||
Former | Grant of patent is intended Status updated on 24.01.2021 | ||
Former | Examination is in progress Status updated on 11.03.2020 | ||
Former | Request for examination was made Status updated on 29.06.2018 | ||
Former | The international publication has been made Status updated on 01.04.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Traxxas LP 6250 Traxxas Way McKinney TX 75070 / US | [2018/31] | Inventor(s) | 01 /
ALLMENDINGER, Otto Karl 7706 Coastway Drive Rowlett, Texas 75088 / US | 02 /
CHRISTENSEN, Casey Christen Jens 5104 Ridge Run Drivee McKinney, Texas 75071 / US | 03 /
EWING, Adam Cole 1340 Annalea McKinney, Texas 75071 / US | 04 /
WOOD, Jonathan Scott 8025 Ohio Drive 10209 Plano, Texas 75024 / US | [2018/31] | Representative(s) | Finnegan Europe LLP 1 London Bridge London SE1 9BG / GB | [2021/21] |
Former [2018/31] | Finnegan Europe LLP 16 Old Bailey London EC4M 7EG / GB | Application number, filing date | 16778577.3 | 21.09.2016 | [2018/31] | WO2016US52934 | Priority number, date | US201562222094P | 22.09.2015 Original published format: US 201562222094 P | [2018/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017053465 | Date: | 30.03.2017 | Language: | EN | [2017/13] | Type: | A1 Application with search report | No.: | EP3352870 | Date: | 01.08.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.03.2017 takes the place of the publication of the European patent application. | [2018/31] | Type: | B1 Patent specification | No.: | EP3352870 | Date: | 26.05.2021 | Language: | EN | [2021/21] | Search report(s) | International search report - published on: | EP | 30.03.2017 | (Supplementary) European search report - dispatched on: | EP | 16.03.2020 | Classification | IPC: | A63H30/04, A63H31/08, A63H17/26, A63H29/00, A63H29/24 | [2020/16] | CPC: |
A63H17/26 (EP,CN,US);
A63H31/08 (EP,CN,US);
A63H17/262 (EP,US);
A63H17/00 (CN);
A63H17/264 (US);
A63H17/36 (CN);
A63H23/02 (US);
A63H27/02 (US);
A63H27/12 (US);
A63H29/00 (EP);
A63H29/22 (US);
A63H29/24 (EP);
A63H30/04 (EP,CN,US)
(-)
|
Former IPC [2018/31] | A63H30/04, A63H31/08, A63H17/26 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/31] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | MOTORBETRIEBENES MODELLFAHRZEUG | [2018/31] | English: | MOTOR-OPERATED MODEL VEHICLE | [2018/31] | French: | VÉHICULE À MODÈLE RÉDUIT ACTIONNÉ PAR MOTEUR | [2018/31] | Entry into regional phase | 20.04.2018 | National basic fee paid | 20.04.2018 | Designation fee(s) paid | 20.04.2018 | Examination fee paid | Examination procedure | 20.04.2018 | Examination requested [2018/31] | 20.04.2018 | Date on which the examining division has become responsible | 14.01.2019 | Amendment by applicant (claims and/or description) | 16.03.2020 | Despatch of a communication from the examining division to which search results under Rule 164(2) EPC are annexed (Time limit: M04) [2020/16] | 16.03.2020 | Despatch of a communication from the examining division (Time limit: M04) | 24.07.2020 | Reply to a communication from the examining division | 25.01.2021 | Communication of intention to grant the patent | 16.04.2021 | Fee for grant paid | 16.04.2021 | Fee for publishing/printing paid | 16.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 01.03.2022 | No opposition filed within time limit [2022/18] | Fees paid | Renewal fee | 15.03.2019 | Renewal fee patent year 03 | 13.09.2019 | Renewal fee patent year 04 | 14.09.2020 | Renewal fee patent year 05 | Penalty fee | Additional fee for renewal fee | 30.09.2018 | 03   M06   Fee paid on   15.03.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.09.2016 | AL | 26.05.2021 | AT | 26.05.2021 | CY | 26.05.2021 | CZ | 26.05.2021 | DK | 26.05.2021 | EE | 26.05.2021 | ES | 26.05.2021 | FI | 26.05.2021 | HR | 26.05.2021 | IT | 26.05.2021 | LT | 26.05.2021 | LV | 26.05.2021 | MC | 26.05.2021 | MK | 26.05.2021 | NL | 26.05.2021 | PL | 26.05.2021 | RO | 26.05.2021 | RS | 26.05.2021 | SE | 26.05.2021 | SI | 26.05.2021 | SK | 26.05.2021 | SM | 26.05.2021 | BG | 26.08.2021 | NO | 26.08.2021 | GR | 27.08.2021 | IE | 21.09.2021 | LU | 21.09.2021 | IS | 26.09.2021 | PT | 27.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/22] |
Former [2023/30] | HU | 21.09.2016 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IE | 21.09.2021 | ||
LU | 21.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/27] | HU | 21.09.2016 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IE | 21.09.2021 | ||
LU | 21.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IE | 21.09.2021 | ||
LU | 21.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/36] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IE | 21.09.2021 | ||
LU | 21.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/35] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IE | 21.09.2021 | ||
LU | 21.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
LU | 21.09.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/29] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/25] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/23] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/10] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/08] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/07] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/04] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/52] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/51] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/50] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
Former [2021/49] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
Former [2021/47] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | ||
BG | 26.08.2021 | ||
Former [2021/46] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | Cited in | International search | [X]US2003236121 (BYERS BRENT W [US]) [X] 1-6 * paragraph [0025] - paragraph [0028]; figures 1-5 *; | [X]US2005070390 (IRIKURA KOJI [JP], et al) [X] 1-6 * paragraph [0063] - paragraph [0068]; figure 19 *; | [X]US2009036021 (BYERS BRENT WHITFIELD [US], et al) [X] 1-6 * paragraph [0125] - paragraph [0127]; figures 1,29,30 ** paragraph [0147] - paragraph [0150] *; | [X]CN202242977U (XIANG LI) [X] 1-6 * figures 1,2; claims 1-4 * | Examination | US4764150 | US2002094751 | US2003073377 | US2003236121 | US2005070390 | US2005079792 | US2009036021 | CN202242977U | CN202822774U | US2013309938 | EP2818217 | by applicant | US7534170 | US8317213 | US8549752 |