EP3284263 - MEDIA HUB DEVICE AND CACHE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 28.05.2021 | ||
Former | Grant of patent is intended Status updated on 24.01.2021 | ||
Former | Examination is in progress Status updated on 18.10.2019 | ||
Former | Request for examination was made Status updated on 19.01.2018 | ||
Former | The international publication has been made Status updated on 15.09.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states INTEL Corporation 2200 Mission College Blvd. Santa Clara, CA 95054 / US | [2021/26] |
Former [2018/08] | For all designated states INTEL Corporation 2200 Mission College Blvd. Santa Clara, CA 95054 / US | Inventor(s) | 01 /
SETHURAMAN, Ramanathan Plot No. 430, Phase 1 Jade Garden Layout Sadahalli Bangalore Karnataka 560037 / IN | 02 /
ROYCHOWDHURY, Arojit Magnolia A-13 Tata Sherwood Basavanagar Main Road Bangalore 560038 / IN | 03 /
DURG, Ajaya V. 2328 Gilia Drive Austin, Texas 78733 / US | 04 /
MURALIDHAR, Rajeev D. 305 6th Block 2nd Phase BSK 3RD Stage Bangalore 560085 / IN | [2021/09] |
Former [2018/08] | 01 /
SETHURAMAN, Ramanathan No. 22E Sobha Lotus Brookfield Near Ryan International School Bangalore 560037 / IN | ||
02 /
ROYCHOWDHURY, Arojit Magnolia A-13 Tata Sherwood Basavanagar Main Road Bangalore 560038 / IN | |||
03 /
DURG, Ajaya V. 2328 Gilia Drive Austin, Texas 78733 / US | |||
04 /
MURALIDHAR, Rajeev D. 305 6th Block 2nd Phase BSK 3RD Stage Bangalore 560085 / IN | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2021/26] | HGF 1 City Walk Leeds LS11 9DX / GB | ||
Former [2018/08] | HGF Limited Fountain Precinct Balm Green Sheffield S1 2JA / GB | Application number, filing date | 16780417.8 | 26.02.2016 | [2018/08] | WO2016US19867 | Priority number, date | US201514687001 | 15.04.2015 Original published format: US201514687001 | [2018/08] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016167888 | Date: | 20.10.2016 | Language: | EN | [2016/42] | Type: | A1 Application with search report | No.: | EP3284263 | Date: | 21.02.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.10.2016 takes the place of the publication of the European patent application. | [2018/08] | Type: | B1 Patent specification | No.: | EP3284263 | Date: | 30.06.2021 | Language: | EN | [2021/26] | Search report(s) | International search report - published on: | KR | 20.10.2016 | (Supplementary) European search report - dispatched on: | EP | 19.10.2018 | Classification | IPC: | G06T1/20, G06T1/60 | [2018/47] | CPC: |
G06T1/60 (EP,CN,US);
G06T1/20 (EP,CN,US)
|
Former IPC [2018/08] | H04N21/41, H04N21/426, H04N21/433 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | MEDIENHUBVORRICHTUNG UND CACHESPEICHER | [2018/08] | English: | MEDIA HUB DEVICE AND CACHE | [2018/08] | French: | DISPOSITIF CONCENTRATEUR DE MÉDIA ET ANTÉMÉMOIRE | [2018/08] | Entry into regional phase | 14.09.2017 | National basic fee paid | 14.09.2017 | Search fee paid | 14.09.2017 | Designation fee(s) paid | 14.09.2017 | Examination fee paid | Examination procedure | 14.09.2017 | Examination requested [2018/08] | 14.09.2017 | Date on which the examining division has become responsible | 16.05.2019 | Amendment by applicant (claims and/or description) | 17.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 17.02.2020 | Reply to a communication from the examining division | 03.12.2020 | Cancellation of oral proceeding that was planned for 10.12.2020 | 10.12.2020 | Date of oral proceedings (cancelled) | 25.01.2021 | Communication of intention to grant the patent | 19.05.2021 | Fee for grant paid | 19.05.2021 | Fee for publishing/printing paid | 19.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] | Fees paid | Renewal fee | 14.02.2018 | Renewal fee patent year 03 | 13.02.2019 | Renewal fee patent year 04 | 13.02.2020 | Renewal fee patent year 05 | 12.02.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.02.2016 | AL | 30.06.2021 | AT | 30.06.2021 | CY | 30.06.2021 | CZ | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | HR | 30.06.2021 | IT | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | PL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SE | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | BG | 30.09.2021 | NO | 30.09.2021 | GR | 01.10.2021 | IS | 30.10.2021 | PT | 02.11.2021 | IE | 26.02.2022 | LU | 26.02.2022 | BE | 28.02.2022 | CH | 28.02.2022 | LI | 28.02.2022 | [2024/22] |
Former [2024/20] | HU | 26.02.2016 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CY | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/18] | HU | 26.02.2016 | |
AL | 30.06.2021 | ||
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/19] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/10] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/09] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
CH | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2022/47] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
LU | 26.02.2022 | ||
Former [2022/44] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/36] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
IT | 30.06.2021 | ||
LV | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/29] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/26] | AL | 30.06.2021 | |
AT | 30.06.2021 | ||
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/21] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/10] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
PL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/09] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/08] | AT | 30.06.2021 | |
CZ | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2022/07] | AT | 30.06.2021 | |
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/51] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/49] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
GR | 01.10.2021 | ||
Former [2021/47] | FI | 30.06.2021 | |
BG | 30.09.2021 | ||
Former [2021/46] | FI | 30.06.2021 | Documents cited: | Search | [XY]US2006064546 (ARITA HIROSHI [JP], et al) [X] 1-4,7,8,11,12 * paragraphs [0029] , [0030] , [0035] - [0039]; figure 1 * [Y] 5,6,13,14; | [XYI]US2011261885 (DE RIVAZ PETER FRANCIS CHEVALLEY [GB]) [X] 1-4,7-9,11,12 * paragraphs [0048] - [0052] - [0057] - [0058] - [0065] , [0067] - [0069]; figure 2 * [Y] 5,6,13,14 [I] 10,15; | [Y]US2012166843 (MURALIDHAR RAJEEV D [IN], et al) [Y] 5,6,13,14 * paragraphs [0027] - [0032]; figure 2 *; | [Y]US2014137137 (YAN SHOUMENG [CN], et al) [Y] 5,6,13,14* paragraphs [0013] - [0016] *; | [XYI]US2014189332 (BEN-KIKI OREN [IL], et al) [X] 1-4,7-9,11,12 * paragraphs [0038] - [0043]; figures 2,6 * [Y] 5,6,13,14 [I] 10,15 | International search | [Y]US2003084244 (PAULRAJ DOMINIC [US]) [Y] 8, 18 * See paragraphs [0007]-[0023]; claims 1-5; and figures 1-4 *; | [Y]US2006064546 (ARITA HIROSHI [JP], et al) [Y] 2-5, 12-16, 22-23 * See paragraphs [0033], [0087], [0089], [0111]; claims 1-4; and figures 1, 19. *; | [A]US2008256330 (WANG PERRY [US], et al) [A] 1-25* See paragraphs [0016]-[0021]; claims 1-7; and figures 1-3. *; | [XYA]US2011261885 (DE RIVAZ PETER FRANCIS CHEVALLEY [GB]) [X] 1, 7, 9-11, 19-21, 25 * See paragraphs [0040], [0052], [0064]-[0066], [0087]; claims 1-10; and figures 1B-3. * [Y] 2-5, 8, 12-16, 18 ,22-23 [A] 6, 17, 24; | [A]JP2012181860 (IBM) [A] 1-25 * See paragraphs [0019]-[0025]; claims 1-11; and figures 1-5. * | by applicant | US2006064546 | US2011261885 | US2014189332 |