EP3287870 - MOBILE TERMINAL UNLOCKING METHOD AND DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.02.2023 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 04.03.2022 | ||
Former | Grant of patent is intended Status updated on 21.10.2021 | ||
Former | Examination is in progress Status updated on 05.10.2020 | ||
Former | Grant of patent is intended Status updated on 29.06.2020 | ||
Former | Examination is in progress Status updated on 18.06.2019 | ||
Former | Request for examination was made Status updated on 26.01.2018 | ||
Former | The international publication has been made Status updated on 14.11.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Alibaba Group Holding Limited Fourth Floor, One Capital Place P.O. Box 847 George Town Grand Cayman / KY | [2018/09] | Inventor(s) | 01 /
LI, Kai Alibaba Group Legal Department 5/F Building 3 No. 969 West Wen Yi Road Yu Hang District Hangzhou Zhejiang 311121 / CN | 02 /
ZHU, Hongru Alibaba Group Legal Department 5/F Building 3 No. 969 West Wen Yi Road Yu Hang District Hangzhou Zhejiang 311121 / CN | [2018/09] | Representative(s) | Boult Wade Tennant LLP Salisbury Square House 8 Salisbury Square London EC4Y 8AP / GB | [2022/14] |
Former [2018/09] | Boult Wade Tennant Verulam Gardens 70 Gray's Inn Road London WC1X 8BT / GB | Application number, filing date | 16782566.0 | 12.04.2016 | [2018/09] | WO2016CN79027 | Priority number, date | CN201510188757 | 20.04.2015 Original published format: CN201510188757 | [2018/09] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016169419 | Date: | 27.10.2016 | Language: | ZH | [2016/43] | Type: | A1 Application with search report | No.: | EP3287870 | Date: | 28.02.2018 | Language: | EN | [2018/09] | Type: | B1 Patent specification | No.: | EP3287870 | Date: | 06.04.2022 | Language: | EN | [2022/14] | Search report(s) | International search report - published on: | CN | 27.10.2016 | (Supplementary) European search report - dispatched on: | EP | 29.10.2018 | Classification | IPC: | G06F3/01, G06F3/0346, G06F1/16, H04M1/725, H04M1/67 | [2018/49] | CPC: |
G06F1/163 (EP,US);
G06F21/316 (KR);
G06F3/01 (EP,US);
G06F3/014 (EP,US);
G06F3/017 (EP,US);
G06F3/0346 (EP,KR,US);
H04M1/67 (EP,US);
H04M1/673 (KR);
H04M1/724094 (EP,US);
H04M1/72412 (EP,US);
H04M1/724631 (EP,KR,US);
H04W4/80 (US);
|
Former IPC [2018/09] | G06F3/01 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/09] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ENTSPERRUNGSVERFAHREN UND -VORRICHTUNG FÜR MOBILES ENDGERÄT | [2018/09] | English: | MOBILE TERMINAL UNLOCKING METHOD AND DEVICE | [2018/09] | French: | PROCÉDÉ ET DISPOSITIF DE DÉVERROUILLAGE DE TERMINAL MOBILE | [2018/09] | Entry into regional phase | 14.11.2017 | Translation filed | 14.11.2017 | National basic fee paid | 14.11.2017 | Search fee paid | 14.11.2017 | Designation fee(s) paid | 14.11.2017 | Examination fee paid | Examination procedure | 14.11.2017 | Examination requested [2018/09] | 14.11.2017 | Date on which the examining division has become responsible | 26.04.2019 | Amendment by applicant (claims and/or description) | 24.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 27.09.2019 | Reply to a communication from the examining division | 13.02.2020 | Despatch of a communication from the examining division (Time limit: M01) | 24.02.2020 | Reply to a communication from the examining division | 30.06.2020 | Communication of intention to grant the patent | 05.10.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 02.11.2020 | Despatch of a communication from the examining division (Time limit: M01) | 26.11.2020 | Reply to a communication from the examining division | 21.10.2021 | Communication of intention to grant the patent | 24.02.2022 | Fee for grant paid | 24.02.2022 | Fee for publishing/printing paid | 24.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 10.01.2023 | No opposition filed within time limit [2023/11] | Fees paid | Renewal fee | 12.07.2018 | Renewal fee patent year 03 | 23.04.2019 | Renewal fee patent year 04 | 19.03.2020 | Renewal fee patent year 05 | 16.04.2021 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 30.04.2018 | 03   M06   Fee paid on   12.07.2018 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.04.2016 | AL | 06.04.2022 | AT | 06.04.2022 | CY | 06.04.2022 | CZ | 06.04.2022 | DK | 06.04.2022 | EE | 06.04.2022 | ES | 06.04.2022 | FI | 06.04.2022 | HR | 06.04.2022 | IT | 06.04.2022 | LT | 06.04.2022 | LV | 06.04.2022 | MC | 06.04.2022 | MK | 06.04.2022 | NL | 06.04.2022 | PL | 06.04.2022 | RO | 06.04.2022 | RS | 06.04.2022 | SE | 06.04.2022 | SI | 06.04.2022 | SK | 06.04.2022 | SM | 06.04.2022 | IE | 12.04.2022 | LU | 12.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | BG | 06.07.2022 | NO | 06.07.2022 | GR | 07.07.2022 | IS | 06.08.2022 | PT | 08.08.2022 | [2024/22] |
Former [2024/20] | HU | 12.04.2016 | |
AL | 06.04.2022 | ||
AT | 06.04.2022 | ||
CY | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
IE | 12.04.2022 | ||
LU | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2024/18] | HU | 12.04.2016 | |
AL | 06.04.2022 | ||
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
IE | 12.04.2022 | ||
LU | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2024/11] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
IT | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
IE | 12.04.2022 | ||
LU | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/25] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
IE | 12.04.2022 | ||
LU | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/20] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
IE | 12.04.2022 | ||
LU | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/17] | AL | 06.04.2022 | |
AT | 06.04.2022 | ||
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
LU | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/10] | AT | 06.04.2022 | |
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
LU | 12.04.2022 | ||
BE | 30.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/09] | AT | 06.04.2022 | |
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
LU | 12.04.2022 | ||
CH | 30.04.2022 | ||
LI | 30.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/08] | AT | 06.04.2022 | |
DK | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
LU | 12.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/07] | AT | 06.04.2022 | |
DK | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2022/51] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2022/50] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/49] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/47] | AT | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
LT | 06.04.2022 | ||
NL | 06.04.2022 | ||
SE | 06.04.2022 | ||
NO | 06.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/44] | NL | 06.04.2022 | Documents cited: | Search | [A]US2007188323 (SINCLAIR MICHAEL [US], et al) [A] 4,5,9* paragraphs [0046] - [0048]; figures 1-2 *; | [Y]US2010033422 (MUCIGNAT ANDREA [US], et al) [Y] 1-16 * paragraph [0017] * * paragraph [0021] * * paragraph [0032] * * paragraphs [0039] - [0040] * * figures 1-4 *; | [A]WO2014190534 (DONGGUAN YULONG TELECOMM TECH CO LTD [CN], et al) [A] 1-16; | [Y]US2015031333 (LEE YU-CHENG [TW]) [Y] 1-16 * paragraph [0039] * * paragraph [0048] * * paragraphs [0061] - [0072] * * paragraph [0080] * * figures 1,4,6,7 *; | EP3007496 [ ] (YULONG COMP TELECOMM SCIENT [CN], et al) [ ] * paragraphs [0076] - [0115]; figures 4-7 * | International search | [Y]CN102244699 (HUIZHOU TCL MOBILE COMM CO LTD) [Y] 2-4, 19-21 * , description, pages 2-3, and figure 1 *; | [Y]CN102568184 (SHENZHEN ZTE MOBILE TECH CO) [Y] 1-5, 7, 11-12, 15, 18-22, 24, 28-29, 32 * description pages 2-3 and figure 1 *; | [A]CN103378876 (SHANGHAI BOLU INF TECH CO LTD) [A] 1-34* , the whole document *; | [Y]CN103853328 (SAMSUNG ELECTRONICS CO LTD) [Y] 1-5, 7, 11-12, 15, 18-22, 24, 28-29, 32 * , description, pages 5-6 and 18-19, and figures 7-8 and 14 *; | [A]CN104200143 (GUANGDONG OPPO MOBILE TELECOMM) [A] 1-34 * , the whole document * |