blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3380758

EP3380758 - POWER SPLIT GEARBOX AND METHOD FOR OPERATING A POWER SPLIT GEARBOX [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  25.09.2020
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  18.10.2019
FormerGrant of patent is intended
Status updated on  18.09.2019
FormerRequest for examination was made
Status updated on  21.08.2019
FormerGrant of patent is intended
Status updated on  08.05.2019
FormerRequest for examination was made
Status updated on  31.08.2018
FormerThe international publication has been made
Status updated on  02.06.2017
Formerunknown
Status updated on  04.11.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
ZF Friedrichshafen AG
Löwentaler Strasse 20
88046 Friedrichshafen / DE
[2018/40]
Inventor(s)01 / LEGNER, Jürgen
Schloßhaldenweg 23
88048 Friedrichshafen / DE
 [2018/40]
Representative(s)ZF Friedrichshafen AG
Gewerblicher Rechtsschutz
Löwentalerstraße 20
88046 Friedrichshafen / DE
[N/P]
Application number, filing date16787419.725.10.2016
[2018/40]
WO2016EP75604
Priority number, dateDE20151022325025.11.2015         Original published format: DE102015223250
[2018/40]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2017089054
Date:01.06.2017
Language:DE
[2017/22]
Type: A1 Application with search report 
No.:EP3380758
Date:03.10.2018
Language:DE
The application published by WIPO in one of the EPO official languages on 01.06.2017 takes the place of the publication of the European patent application.
[2018/40]
Type: B1 Patent specification 
No.:EP3380758
Date:20.11.2019
Language:DE
[2019/47]
Search report(s)International search report - published on:EP01.06.2017
ClassificationIPC:F16H61/421, F16H61/431
[2018/40]
CPC:
F16H61/421 (EP,US); F16H39/10 (US); F16H47/04 (EP,US);
F16H61/431 (EP,US); F16H61/439 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/40]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:LEISTUNGSVERZWEIGUNGSGETRIEBE UND VERFAHREN ZUM BETRIEB EINES LEISTUNGSVERZWEIGUNGSGETRIEBES[2018/40]
English:POWER SPLIT GEARBOX AND METHOD FOR OPERATING A POWER SPLIT GEARBOX[2018/40]
French:TRANSMISSION DE DÉRIVATION DE PUISSANCE ET PROCÉDÉ POUR FAIRE FONCTIONNER UNE TRANSMISSION DE DÉRIVATION DE PUISSANCE[2018/40]
Entry into regional phase17.04.2018National basic fee paid 
17.04.2018Designation fee(s) paid 
17.04.2018Examination fee paid 
Examination procedure03.04.2017Request for preliminary examination filed
International Preliminary Examining Authority: EP
17.04.2018Examination requested  [2018/40]
17.04.2018Date on which the examining division has become responsible
09.05.2019Communication of intention to grant the patent
16.08.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
19.09.2019Communication of intention to grant the patent
26.09.2019Fee for grant paid
26.09.2019Fee for publishing/printing paid
26.09.2019Receipt of the translation of the claim(s)
Opposition(s)21.08.2020No opposition filed within time limit [2020/44]
Fees paidRenewal fee
11.10.2018Renewal fee patent year 03
15.10.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.10.2016
AL20.11.2019
CY20.11.2019
CZ20.11.2019
DK20.11.2019
EE20.11.2019
ES20.11.2019
FI20.11.2019
HR20.11.2019
IT20.11.2019
LT20.11.2019
LV20.11.2019
MC20.11.2019
MK20.11.2019
MT20.11.2019
NL20.11.2019
PL20.11.2019
RO20.11.2019
RS20.11.2019
SE20.11.2019
SI20.11.2019
SK20.11.2019
SM20.11.2019
TR20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
PT12.04.2020
[2022/32]
Former [2022/27]HU25.10.2016
AL20.11.2019
CY20.11.2019
CZ20.11.2019
DK20.11.2019
EE20.11.2019
ES20.11.2019
FI20.11.2019
HR20.11.2019
IT20.11.2019
LT20.11.2019
LV20.11.2019
MC20.11.2019
MT20.11.2019
NL20.11.2019
PL20.11.2019
RO20.11.2019
RS20.11.2019
SE20.11.2019
SI20.11.2019
SK20.11.2019
SM20.11.2019
TR20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
PT12.04.2020
Former [2021/31]AL20.11.2019
CZ20.11.2019
DK20.11.2019
EE20.11.2019
ES20.11.2019
FI20.11.2019
HR20.11.2019
IT20.11.2019
LT20.11.2019
LV20.11.2019
MC20.11.2019
NL20.11.2019
PL20.11.2019
RO20.11.2019
RS20.11.2019
SE20.11.2019
SI20.11.2019
SK20.11.2019
SM20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
PT12.04.2020
Former [2021/10]AL20.11.2019
CZ20.11.2019
DK20.11.2019
EE20.11.2019
ES20.11.2019
FI20.11.2019
HR20.11.2019
IT20.11.2019
LT20.11.2019
LV20.11.2019
NL20.11.2019
PL20.11.2019
RO20.11.2019
RS20.11.2019
SE20.11.2019
SI20.11.2019
SK20.11.2019
SM20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
PT12.04.2020
Former [2020/51]AL20.11.2019
CZ20.11.2019
DK20.11.2019
EE20.11.2019
ES20.11.2019
FI20.11.2019
HR20.11.2019
LT20.11.2019
LV20.11.2019
NL20.11.2019
PL20.11.2019
RO20.11.2019
RS20.11.2019
SE20.11.2019
SI20.11.2019
SK20.11.2019
SM20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
PT12.04.2020
Former [2020/37]AL20.11.2019
CZ20.11.2019
DK20.11.2019
EE20.11.2019
ES20.11.2019
FI20.11.2019
HR20.11.2019
LT20.11.2019
LV20.11.2019
NL20.11.2019
RO20.11.2019
RS20.11.2019
SE20.11.2019
SK20.11.2019
SM20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
PT12.04.2020
Former [2020/36]AL20.11.2019
CZ20.11.2019
DK20.11.2019
EE20.11.2019
ES20.11.2019
FI20.11.2019
HR20.11.2019
LT20.11.2019
LV20.11.2019
NL20.11.2019
RO20.11.2019
RS20.11.2019
SE20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
PT12.04.2020
Former [2020/35]AL20.11.2019
CZ20.11.2019
ES20.11.2019
FI20.11.2019
HR20.11.2019
LT20.11.2019
LV20.11.2019
NL20.11.2019
RO20.11.2019
RS20.11.2019
SE20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
Former [2020/34]AL20.11.2019
ES20.11.2019
FI20.11.2019
HR20.11.2019
LT20.11.2019
LV20.11.2019
NL20.11.2019
RS20.11.2019
SE20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
Former [2020/32]AL20.11.2019
FI20.11.2019
HR20.11.2019
LT20.11.2019
LV20.11.2019
NL20.11.2019
RS20.11.2019
SE20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
Former [2020/26]FI20.11.2019
HR20.11.2019
LT20.11.2019
LV20.11.2019
NL20.11.2019
RS20.11.2019
SE20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
Former [2020/24]FI20.11.2019
LT20.11.2019
LV20.11.2019
NL20.11.2019
SE20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
IS20.03.2020
Former [2020/23]FI20.11.2019
LT20.11.2019
LV20.11.2019
NL20.11.2019
SE20.11.2019
BG20.02.2020
NO20.02.2020
GR21.02.2020
Former [2020/22]FI20.11.2019
LT20.11.2019
SE20.11.2019
BG20.02.2020
NO20.02.2020
Former [2020/21]NO20.02.2020
Cited inInternational search[Y]US2985144  (KARL TRIPPEL) [Y] 1-9 * column 7, line 73 - line 74 *;
 [A]GB1206196  (DAIMLER BENZ AG [DE]) [A] 1,3,7,9* figure 1 *;
 [A]WO9924738  (FOLSOM TECHNOLOGIES INC [US], et al) [A] 1,7 * column 9, paragraphs 2-3 *;
 [Y]DE102007047195  (ZAHNRADFABRIK FRIEDRICHSHAFEN [DE]) [Y] 1-9 * figure 1 *;
 [A]DE102012213173  (ZAHNRADFABRIK FRIEDRICHSHAFEN [DE]) [A] 1,2,4-8 * figure 1 *;
 [A]DE102012213170  (ZAHNRADFABRIK FRIEDRICHSHAFEN [DE]) [A] 1,2,4-8 * figure 1 *;
 [AD]DE102013200390  (ZAHNRADFABRIK FRIEDRICHSHAFEN [DE]) [AD] 1,2,4-8 * figure 2 *
by applicantDE102013200390
 DE102013200399
 DE102013204746
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.