EP3527008 - AUTOMATIC POWER SAVING SELECTION BASED ON TARGET USE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.04.2024 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 12.05.2023 | ||
Former | Grant of patent is intended Status updated on 28.11.2022 | ||
Former | Examination is in progress Status updated on 16.10.2020 | ||
Former | Request for examination was made Status updated on 19.07.2019 | ||
Former | The international publication has been made Status updated on 20.04.2018 | ||
Former | unknown Status updated on 15.11.2016 | Most recent event Tooltip | 12.07.2024 | Lapse of the patent in a contracting state New state(s): GB | published on 14.08.2024 [2024/33] | Applicant(s) | For all designated states Sony Group Corporation 1-7-1 Konan Minato-ku 108-0075 Tokyo / JP | [2023/24] |
Former [2019/34] | For all designated states Sony Mobile Communications Inc. 4-12-3 Higashi-Shinagawa Shinagawa-ku Tokyo 140-0002 / JP | Inventor(s) | 01 /
LJUNG, Rickard Tingsgatan 13 256 56 Helsingborg / SE | [2019/34] | Representative(s) | Kraus & Lederer PartGmbB Thomas-Wimmer-Ring 15 80539 München / DE | [N/P] |
Former [2019/34] | Kraus & Weisert Patentanwälte PartGmbB Thomas-Wimmer-Ring 15 80539 München / DE | Application number, filing date | 16791092.6 | 11.10.2016 | [2019/34] | WO2016IB56074 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018069746 | Date: | 19.04.2018 | Language: | EN | [2018/16] | Type: | A1 Application with search report | No.: | EP3527008 | Date: | 21.08.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.04.2018 takes the place of the publication of the European patent application. | [2019/34] | Type: | B1 Patent specification | No.: | EP3527008 | Date: | 14.06.2023 | Language: | EN | [2023/24] | Search report(s) | International search report - published on: | EP | 19.04.2018 | Classification | IPC: | H04W52/02 | [2019/34] | CPC: |
H04W52/0261 (EP,US);
H04W52/0277 (EP,US);
H04W88/02 (US);
Y02D30/70 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/34] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | AUTOMATISCHE ENERGIESPARAUSWAHL BASIEREND AUF DER ZIELNUTZUNG | [2019/34] | English: | AUTOMATIC POWER SAVING SELECTION BASED ON TARGET USE | [2019/34] | French: | SÉLECTION D'ÉCONOMIE D'ÉNERGIE AUTOMATIQUE BASÉE SUR UNE UTILISATION CIBLE | [2019/34] | Entry into regional phase | 10.05.2019 | National basic fee paid | 10.05.2019 | Designation fee(s) paid | 10.05.2019 | Examination fee paid | Examination procedure | 10.05.2019 | Examination requested [2019/34] | 10.05.2019 | Date on which the examining division has become responsible | 30.10.2019 | Amendment by applicant (claims and/or description) | 19.10.2020 | Despatch of a communication from the examining division (Time limit: M04) | 21.01.2021 | Reply to a communication from the examining division | 11.08.2021 | Despatch of a communication from the examining division (Time limit: M04) | 13.12.2021 | Reply to a communication from the examining division | 29.11.2022 | Communication of intention to grant the patent | 06.04.2023 | Fee for grant paid | 06.04.2023 | Fee for publishing/printing paid | 06.04.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 15.03.2024 | No opposition filed within time limit [2024/21] | Fees paid | Renewal fee | 10.05.2019 | Renewal fee patent year 03 | 15.10.2019 | Renewal fee patent year 04 | 14.10.2020 | Renewal fee patent year 05 | 20.10.2021 | Renewal fee patent year 06 | 21.10.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 14.06.2023 | CZ | 14.06.2023 | DK | 14.06.2023 | EE | 14.06.2023 | ES | 14.06.2023 | FI | 14.06.2023 | HR | 14.06.2023 | IT | 14.06.2023 | LT | 14.06.2023 | LV | 14.06.2023 | MC | 14.06.2023 | NL | 14.06.2023 | PL | 14.06.2023 | RO | 14.06.2023 | RS | 14.06.2023 | SE | 14.06.2023 | SI | 14.06.2023 | SK | 14.06.2023 | SM | 14.06.2023 | NO | 14.09.2023 | GR | 15.09.2023 | GB | 11.10.2023 | LU | 11.10.2023 | IS | 14.10.2023 | PT | 16.10.2023 | [2024/33] |
Former [2024/30] | AT | 14.06.2023 | |
CZ | 14.06.2023 | ||
DK | 14.06.2023 | ||
EE | 14.06.2023 | ||
ES | 14.06.2023 | ||
FI | 14.06.2023 | ||
HR | 14.06.2023 | ||
IT | 14.06.2023 | ||
LT | 14.06.2023 | ||
LV | 14.06.2023 | ||
MC | 14.06.2023 | ||
NL | 14.06.2023 | ||
PL | 14.06.2023 | ||
RO | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
SI | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
LU | 11.10.2023 | ||
IS | 14.10.2023 | ||
PT | 16.10.2023 | ||
Former [2024/28] | AT | 14.06.2023 | |
CZ | 14.06.2023 | ||
DK | 14.06.2023 | ||
EE | 14.06.2023 | ||
ES | 14.06.2023 | ||
FI | 14.06.2023 | ||
HR | 14.06.2023 | ||
IT | 14.06.2023 | ||
LT | 14.06.2023 | ||
LV | 14.06.2023 | ||
MC | 14.06.2023 | ||
NL | 14.06.2023 | ||
PL | 14.06.2023 | ||
RO | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
SI | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
IS | 14.10.2023 | ||
PT | 16.10.2023 | ||
Former [2024/26] | AT | 14.06.2023 | |
CZ | 14.06.2023 | ||
DK | 14.06.2023 | ||
EE | 14.06.2023 | ||
ES | 14.06.2023 | ||
FI | 14.06.2023 | ||
HR | 14.06.2023 | ||
IT | 14.06.2023 | ||
LT | 14.06.2023 | ||
LV | 14.06.2023 | ||
NL | 14.06.2023 | ||
PL | 14.06.2023 | ||
RO | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
SI | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
IS | 14.10.2023 | ||
PT | 16.10.2023 | ||
Former [2024/24] | AT | 14.06.2023 | |
CZ | 14.06.2023 | ||
DK | 14.06.2023 | ||
EE | 14.06.2023 | ||
ES | 14.06.2023 | ||
FI | 14.06.2023 | ||
HR | 14.06.2023 | ||
LT | 14.06.2023 | ||
LV | 14.06.2023 | ||
NL | 14.06.2023 | ||
PL | 14.06.2023 | ||
RO | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
SI | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
IS | 14.10.2023 | ||
PT | 16.10.2023 | ||
Former [2024/22] | AT | 14.06.2023 | |
CZ | 14.06.2023 | ||
DK | 14.06.2023 | ||
EE | 14.06.2023 | ||
ES | 14.06.2023 | ||
FI | 14.06.2023 | ||
HR | 14.06.2023 | ||
LT | 14.06.2023 | ||
LV | 14.06.2023 | ||
NL | 14.06.2023 | ||
PL | 14.06.2023 | ||
RO | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
IS | 14.10.2023 | ||
PT | 16.10.2023 | ||
Former [2024/10] | AT | 14.06.2023 | |
CZ | 14.06.2023 | ||
EE | 14.06.2023 | ||
ES | 14.06.2023 | ||
FI | 14.06.2023 | ||
HR | 14.06.2023 | ||
LT | 14.06.2023 | ||
LV | 14.06.2023 | ||
NL | 14.06.2023 | ||
PL | 14.06.2023 | ||
RO | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
IS | 14.10.2023 | ||
PT | 16.10.2023 | ||
Former [2024/09] | AT | 14.06.2023 | |
CZ | 14.06.2023 | ||
ES | 14.06.2023 | ||
FI | 14.06.2023 | ||
HR | 14.06.2023 | ||
LT | 14.06.2023 | ||
LV | 14.06.2023 | ||
NL | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
IS | 14.10.2023 | ||
Former [2024/08] | ES | 14.06.2023 | |
FI | 14.06.2023 | ||
HR | 14.06.2023 | ||
LT | 14.06.2023 | ||
LV | 14.06.2023 | ||
NL | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
SK | 14.06.2023 | ||
SM | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
Former [2024/03] | ES | 14.06.2023 | |
FI | 14.06.2023 | ||
HR | 14.06.2023 | ||
LT | 14.06.2023 | ||
LV | 14.06.2023 | ||
NL | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
Former [2024/01] | ES | 14.06.2023 | |
HR | 14.06.2023 | ||
LT | 14.06.2023 | ||
LV | 14.06.2023 | ||
NL | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
Former [2023/52] | ES | 14.06.2023 | |
HR | 14.06.2023 | ||
NL | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
Former [2023/51] | ES | 14.06.2023 | |
HR | 14.06.2023 | ||
RS | 14.06.2023 | ||
SE | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
Former [2023/50] | ES | 14.06.2023 | |
SE | 14.06.2023 | ||
NO | 14.09.2023 | ||
GR | 15.09.2023 | ||
Former [2023/48] | ES | 14.06.2023 | |
SE | 14.06.2023 | ||
NO | 14.09.2023 | ||
Former [2023/46] | ES | 14.06.2023 | Cited in | International search | [X]US2009249095 (POORNACHANDRAN RAJESH [US], et al) [X] 1-20 * abstract * * paragraph [0008] - paragraph [0030] * * figures 1,2 *; | [A]US2010253289 (AMIR HAIM [IL], et al) [A] 1-20 * abstract * * paragraph [0012] - paragraph [0038] ** figures 1,2 *; | [X]US2014126441 (RAI PARITOSH [US], et al) [X] 1-20 * abstract * * paragraph [0016] - paragraph [0095] * * figures 1-8 *; | [X]GB2529857 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1-20 * abstract * * paragraph [0010] - paragraph [0218] * * figures 1-7 * | Examination | US2009164152 | WO2015102447 | US2016309390 |