blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3398280

EP3398280 - TECHNIQUES FOR ALLOCATING RESOURCES IN LOW LATENCY WIRELESS COMMUNICATIONS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.01.2022
Database last updated on 18.10.2024
FormerThe patent has been granted
Status updated on  12.02.2021
FormerGrant of patent is intended
Status updated on  01.10.2020
FormerRequest for examination was made
Status updated on  05.10.2018
FormerThe international publication has been made
Status updated on  07.07.2017
Formerunknown
Status updated on  18.11.2016
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
[2018/45]
Inventor(s)01 / CHEN, Wanshi
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
02 / PATEL, Shimman Arvind
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
03 / MONTOJO, Juan
Qualcomm Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
 [2018/45]
Representative(s)Dunlop, Hugh Christopher, et al
Maucher Jenkins
Seventh Floor Offices
Artillery House
11-19 Artillery Row
London SW1P 1RT / GB
[N/P]
Former [2018/45]Dunlop, Hugh Christopher, et al
Maucher Jenkins
26 Caxton Street
London SW1H 0RJ / GB
Application number, filing date16794115.224.10.2016
[2018/45]
WO2016US58472
Priority number, dateUS201562271961P28.12.2015         Original published format: US 201562271961 P
US20161526483914.09.2016         Original published format: US201615264839
[2018/45]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017116539
Date:06.07.2017
Language:EN
[2017/27]
Type: A1 Application with search report 
No.:EP3398280
Date:07.11.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 06.07.2017 takes the place of the publication of the European patent application.
[2018/45]
Type: B1 Patent specification 
No.:EP3398280
Date:17.03.2021
Language:EN
[2021/11]
Search report(s)International search report - published on:EP06.07.2017
ClassificationIPC:H04L5/00
[2018/45]
CPC:
H04L5/0058 (EP,KR,US); H04W72/044 (US); H04L5/0048 (KR,US);
H04W72/0446 (KR); H04W72/20 (US); H04W72/232 (KR);
H04W72/512 (KR); H04L5/003 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/45]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:TECHNIKEN ZUR ZUWEISUNG VON RESSOURCEN IN DRAHTLOSKOMMUNIKATIONEN MIT NIEDRIGER LATENZ[2018/45]
English:TECHNIQUES FOR ALLOCATING RESOURCES IN LOW LATENCY WIRELESS COMMUNICATIONS[2018/45]
French:TECHNIQUES POUR ATTRIBUER DES RESSOURCES DANS DES COMMUNICATIONS SANS FIL À FAIBLE LATENCE[2018/45]
Entry into regional phase23.05.2018National basic fee paid 
23.05.2018Designation fee(s) paid 
23.05.2018Examination fee paid 
Examination procedure23.05.2018Examination requested  [2018/45]
23.05.2018Date on which the examining division has become responsible
04.12.2018Amendment by applicant (claims and/or description)
02.10.2020Communication of intention to grant the patent
03.02.2021Fee for grant paid
03.02.2021Fee for publishing/printing paid
03.02.2021Receipt of the translation of the claim(s)
Opposition(s)20.12.2021No opposition filed within time limit [2022/08]
Fees paidRenewal fee
07.08.2018Renewal fee patent year 03
11.10.2019Renewal fee patent year 04
09.10.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.10.2016
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
MT17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
TR17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
IE24.10.2021
LU24.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
[2024/42]
Former [2024/29]HU24.10.2016
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
TR17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
IE24.10.2021
LU24.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2024/22]HU24.10.2016
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
MK17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
IE24.10.2021
LU24.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2023/33]HU24.10.2016
AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
IE24.10.2021
LU24.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2023/30]AL17.03.2021
AT17.03.2021
CY17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
IE24.10.2021
LU24.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/48]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
IE24.10.2021
LU24.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/37]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
LU24.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
Former [2022/35]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
LU24.10.2021
BE31.10.2021
Former [2022/33]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
MC17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
BE31.10.2021
Former [2022/23]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
IT17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/13]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SI17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/10]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2022/08]AL17.03.2021
AT17.03.2021
CZ17.03.2021
DK17.03.2021
EE17.03.2021
ES17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2022/07]AL17.03.2021
AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/52]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
PL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/51]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
IS17.07.2021
PT19.07.2021
Former [2021/50]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RO17.03.2021
RS17.03.2021
SE17.03.2021
SK17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
PT19.07.2021
Former [2021/48]AT17.03.2021
CZ17.03.2021
EE17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/46]AT17.03.2021
FI17.03.2021
HR17.03.2021
LT17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
SM17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/43]FI17.03.2021
HR17.03.2021
LV17.03.2021
NL17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/38]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
SE17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/37]FI17.03.2021
HR17.03.2021
LV17.03.2021
RS17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/36]FI17.03.2021
HR17.03.2021
BG17.06.2021
NO17.06.2021
GR18.06.2021
Former [2021/35]FI17.03.2021
HR17.03.2021
NO17.06.2021
Former [2021/33]FI17.03.2021
NO17.06.2021
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.