EP3368618 - ARTICLES SUBJECT TO ICE FORMATION COMPRISING A REPELLENT SURFACE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.10.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 23.10.2020 | ||
Former | Grant of patent is intended Status updated on 02.06.2020 | ||
Former | Request for examination was made Status updated on 30.03.2020 | ||
Former | Grant of patent is intended Status updated on 15.12.2019 | ||
Former | Request for examination was made Status updated on 03.08.2018 | ||
Former | The international publication has been made Status updated on 05.05.2017 | ||
Former | unknown Status updated on 21.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states 3M Innovative Properties Company 3M Center Post Office Box 33427 St. Paul, MN 55133-3427 / US | [2018/36] | Inventor(s) | 01 /
ELSBERND, Cheryl L.S. 3M Center Post Office Box 33427 Saint Paul, Minnesota 55133-3427 / US | 02 /
MEULER, Adam J. 3M Center Post Office Box 33427 Saint Paul, Minnesota 55133-3427 / US | 03 /
IZZI, Guglielmo Memo 3M Center Post Office Box 33427 Saint Paul, Minnesota 55133-3427 / US | 04 /
MALMBERG, Zachary J. 3M Center Post Office Box 33427 Saint Paul, Minnesota 55133-3427 / US | 05 /
MUEHLE, Thomas E.S. 3M Center Post Office Box 33427 Saint Paul, Minnesota 55133-3427 / US | 06 /
LI, Jian 1840 Oxford Street East London, Ontario N5V 3R6 / CA | [2018/36] | Representative(s) | Mathys & Squire Theatinerstraße 7 80333 München / DE | [N/P] |
Former [2020/48] | Mathys & Squire Mathys & Squire Europe LLP Theatinerstraße 7 80333 München / DE | ||
Former [2018/36] | Herzog, Fiesser & Partner Patentanwälte PartG mbB Isartorplatz 1 80331 München / DE | Application number, filing date | 16794457.8 | 13.10.2016 | [2018/36] | WO2016US56742 | Priority number, date | US201562247238P | 28.10.2015 Original published format: US 201562247238 P | US201662327805P | 26.04.2016 Original published format: US 201662327805 P | [2018/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017074708 | Date: | 04.05.2017 | Language: | EN | [2017/18] | Type: | A1 Application with search report | No.: | EP3368618 | Date: | 05.09.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.05.2017 takes the place of the publication of the European patent application. | [2018/36] | Type: | B1 Patent specification | No.: | EP3368618 | Date: | 25.11.2020 | Language: | EN | [2020/48] | Search report(s) | International search report - published on: | EP | 04.05.2017 | Classification | IPC: | C09D7/00, C09D5/00 | [2018/36] | CPC: |
C09D5/00 (EP,US);
C09D7/00 (EP,US);
C08K5/435 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | FÜR EISBILDUNG ANFÄLLIGE ARTIKEL MIT ABWEISENDER OBERFLÄCHE | [2018/36] | English: | ARTICLES SUBJECT TO ICE FORMATION COMPRISING A REPELLENT SURFACE | [2018/36] | French: | ARTICLES SOUMIS À FORMATION DE GLACE COMPRENANT UNE SURFACE RÉPULSIVE | [2018/36] | Entry into regional phase | 02.05.2018 | National basic fee paid | 02.05.2018 | Designation fee(s) paid | 02.05.2018 | Examination fee paid | Examination procedure | 02.05.2018 | Amendment by applicant (claims and/or description) | 02.05.2018 | Examination requested [2018/36] | 02.05.2018 | Date on which the examining division has become responsible | 16.12.2019 | Communication of intention to grant the patent | 27.03.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 10.06.2020 | Communication of intention to grant the patent | 09.10.2020 | Fee for grant paid | 09.10.2020 | Fee for publishing/printing paid | 09.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 26.08.2021 | No opposition filed within time limit [2021/44] | Fees paid | Renewal fee | 11.10.2018 | Renewal fee patent year 03 | 15.10.2019 | Renewal fee patent year 04 | 14.10.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.10.2016 | AL | 25.11.2020 | AT | 25.11.2020 | CY | 25.11.2020 | CZ | 25.11.2020 | DK | 25.11.2020 | EE | 25.11.2020 | ES | 25.11.2020 | FI | 25.11.2020 | HR | 25.11.2020 | IT | 25.11.2020 | LT | 25.11.2020 | LV | 25.11.2020 | MC | 25.11.2020 | MK | 25.11.2020 | MT | 25.11.2020 | NL | 25.11.2020 | PL | 25.11.2020 | RO | 25.11.2020 | RS | 25.11.2020 | SE | 25.11.2020 | SI | 25.11.2020 | SK | 25.11.2020 | SM | 25.11.2020 | TR | 25.11.2020 | BG | 25.02.2021 | NO | 25.02.2021 | GR | 26.02.2021 | IS | 25.03.2021 | PT | 25.03.2021 | [2024/41] |
Former [2024/29] | HU | 13.10.2016 | |
AL | 25.11.2020 | ||
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
MK | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
TR | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2024/22] | HU | 13.10.2016 | |
AL | 25.11.2020 | ||
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
MK | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2023/30] | HU | 13.10.2016 | |
AL | 25.11.2020 | ||
AT | 25.11.2020 | ||
CY | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2023/29] | HU | 13.10.2016 | |
AL | 25.11.2020 | ||
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/33] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
MC | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/23] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2022/10] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2022/08] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
ES | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/50] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SI | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/48] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
IT | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/46] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
NL | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/45] | AL | 25.11.2020 | |
AT | 25.11.2020 | ||
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/37] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
DK | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/36] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
EE | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/35] | AT | 25.11.2020 | |
CZ | 25.11.2020 | ||
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RO | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SK | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/33] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LT | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/32] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
SM | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/28] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
HR | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/25] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
LV | 25.11.2020 | ||
PL | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
IS | 25.03.2021 | ||
PT | 25.03.2021 | ||
Former [2021/23] | AT | 25.11.2020 | |
FI | 25.11.2020 | ||
LV | 25.11.2020 | ||
RS | 25.11.2020 | ||
SE | 25.11.2020 | ||
BG | 25.02.2021 | ||
NO | 25.02.2021 | ||
GR | 26.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/22] | FI | 25.11.2020 | |
RS | 25.11.2020 | ||
NO | 25.02.2021 | ||
PT | 25.03.2021 | ||
Former [2021/21] | FI | 25.11.2020 | |
PT | 25.03.2021 | ||
Former [2021/20] | FI | 25.11.2020 | Cited in | International search | [X]EP0339583 (KANSAI PAINT CO LTD [JP]) [X] 1-30 * claims 1-12; examples; page 15 lines 15 ff. *; | [X]EP0860490 (UNION CARBIDE CHEM PLASTIC [US]) [X] 1-30 * claims 1-24; examples *; | [X]WO0196654 (3M INNOVATIVE PROPERTIES CO [US]) [X] 1-30* claims 1-19; examples 1-80; page 22 line 8 - page 23 line 7 *; | [X]US2003235696 (BYRD NORMAN R [US]) [X] 1-30 * claims 1-29; example 6 *; | [X]US2009294724 (ATTAR AMIR J [US]) [X] 1-30 * claims 1-22; examples 1-6 *; | [X]WO2010002859 (STC UNM [US], et al) [X] 1-30 * claims 1-21; examples *; | [X]US2010314575 (GAO DI [US], et al) [X] 1-30 * claims 1-7; [0038] ff.; Fig.1 (receding contact angle) *; | [X]WO2014148909 (ESTUARY HOLDING B V [NL]) [X] 1-30 * claims 1-9; examples page 13 ff.; page 9 line 16 ff. * | by applicant | US2803656 | US6171983 | US6586522 | US7396866 |