blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3349941

EP3349941 - APPARATUS FOR MACHINING A COMPONENT AND METHOD OF MACHINING [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  11.11.2022
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  03.12.2021
FormerGrant of patent is intended
Status updated on  27.05.2021
FormerRequest for examination was made
Status updated on  22.06.2018
FormerThe international publication has been made
Status updated on  23.06.2017
Formerunknown
Status updated on  28.11.2016
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Siemens Energy Global GmbH & Co. KG
Otto-Hahn-Ring 6
81739 München / DE
[2021/04]
Former [2018/30]For all designated states
Siemens Aktiengesellschaft
Werner-von-Siemens-Straße 1
80333 München / DE
Inventor(s)01 / GRIESE, Andreas
Kaiser-Friedrich-Str. 22
10585 Berlin / DE
02 / KLEMKE, Thomas
Rapsstr. 25
13625 Berlin / DE
03 / PIASECKI, Pascal
Wandelsweg 105
45894 Gelsenkirchen / DE
04 / GELLENTHIEN, Heiko
Alboinstr. 25
12103 Berlin / DE
 [2018/30]
Application number, filing date16797788.308.11.2016
[2018/30]
WO2016EP76943
Priority number, dateEP2015020052216.12.2015         Original published format: EP 15200522
[2018/30]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017102180
Date:22.06.2017
Language:EN
[2017/25]
Type: A1 Application with search report 
No.:EP3349941
Date:25.07.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 22.06.2017 takes the place of the publication of the European patent application.
[2018/30]
Type: B1 Patent specification 
No.:EP3349941
Date:05.01.2022
Language:EN
[2022/01]
Search report(s)International search report - published on:EP22.06.2017
(Supplementary) European search report - dispatched on:EP28.05.2021
ClassificationIPC:B23Q3/06, B25B1/24, B23Q3/10, B23Q1/01
[2021/22]
CPC:
B23Q3/063 (EP,US); B23Q1/015 (EP); B23Q3/104 (EP,US);
B25B1/2405 (EP,US); B25B5/14 (EP,US); B25B5/163 (EP,US)
Former IPC [2018/30]B23Q3/06, B25B1/24, B23Q3/10
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/30]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VORRICHTUNG ZUR BEARBEITUNG EINER KOMPONENTE UND VERFAHREN ZUR BEARBEITUNG[2018/30]
English:APPARATUS FOR MACHINING A COMPONENT AND METHOD OF MACHINING[2018/30]
French:APPAREIL D'USINAGE D'UN COMPOSANT ET PROCÉDÉ D'USINAGE[2021/22]
Former [2018/30]APPAREIL POUR USINER UN COMPOSANT ET PROCÉDÉ D'USINAGE
Entry into regional phase20.04.2018National basic fee paid 
20.04.2018Designation fee(s) paid 
20.04.2018Examination fee paid 
Examination procedure19.04.2018Date on which the examining division has become responsible
20.04.2018Examination requested  [2018/30]
30.10.2018Amendment by applicant (claims and/or description)
28.05.2021Communication of intention to grant the patent
28.05.2021Communication of intention to grant the patent to which search results under Rule 164(2) EPC are annexed [2021/25]
21.09.2021Receipt of the translation of the claim(s)
22.09.2021Fee for grant paid
22.09.2021Fee for publishing/printing paid
Opposition(s)06.10.2022No opposition filed within time limit [2022/50]
Fees paidRenewal fee
19.11.2018Renewal fee patent year 03
19.11.2019Renewal fee patent year 04
18.11.2020Renewal fee patent year 05
25.11.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.11.2016
AL05.01.2022
AT05.01.2022
CY05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
MK05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
TR05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
[2024/29]
Former [2024/27]HU08.11.2016
AL05.01.2022
AT05.01.2022
CY05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
MK05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2024/21]HU08.11.2016
AL05.01.2022
AT05.01.2022
CY05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2024/18]HU08.11.2016
AL05.01.2022
AT05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2023/30]AL05.01.2022
AT05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
MC05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2023/10]AL05.01.2022
AT05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SI05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2023/01]AL05.01.2022
AT05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/49]AT05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SK05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/48]AT05.01.2022
CZ05.01.2022
DK05.01.2022
EE05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/47]AT05.01.2022
DK05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RO05.01.2022
RS05.01.2022
SE05.01.2022
SM05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/46]AT05.01.2022
DK05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RS05.01.2022
SE05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/42]AT05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RS05.01.2022
SE05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
IS05.05.2022
PT05.05.2022
Former [2022/39]AT05.01.2022
ES05.01.2022
FI05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RS05.01.2022
SE05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
PT05.05.2022
Former [2022/36]AT05.01.2022
ES05.01.2022
HR05.01.2022
LT05.01.2022
LV05.01.2022
NL05.01.2022
PL05.01.2022
RS05.01.2022
SE05.01.2022
BG05.04.2022
NO05.04.2022
GR06.04.2022
PT05.05.2022
Former [2022/35]ES05.01.2022
HR05.01.2022
LT05.01.2022
NL05.01.2022
RS05.01.2022
SE05.01.2022
BG05.04.2022
NO05.04.2022
PT05.05.2022
Former [2022/34]ES05.01.2022
LT05.01.2022
NL05.01.2022
NO05.04.2022
PT05.05.2022
Former [2022/33]LT05.01.2022
NL05.01.2022
NO05.04.2022
Former [2022/30]NL05.01.2022
Cited inInternational search[XYI]US2010170081  (KURODA TAKAYUKI [JP], et al) [X] 1,11,12 * paragraph [0082]; figures 1-3; claim 1 * [Y] 2,3 [I] 10;
 [Y]DE4116979  (JOHANN SPREITZER WERKZEUG NORM [DE]) [Y] 2,3 * figures 2-3 *;
 [I]DE102007049862  (MTU AERO ENGINES GMBH [DE]) [I] 1-3,10-12 * paragraphs [0002] , [0024] , [0025]; figure 1 *;
 [A]US2005091846  (POWERS JOHN M [US], et al) [A] 1-3,10-12 * paragraph [0005]; figures 1,2 *;
 [A]EP1806477  (UNITED TECHNOLOGIES CORP [US]) [A] 1-3,10-12 * figures 1-2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.