EP3305992 - CONSTRUCTION MACHINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.12.2021 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 15.01.2021 | ||
Former | Grant of patent is intended Status updated on 21.09.2020 | ||
Former | Request for examination was made Status updated on 09.03.2018 | ||
Former | The international publication has been made Status updated on 02.12.2016 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Kobelco Construction Machinery Co., Ltd. 2-1 Itsukaichikou 2-chome Saeki-ku Hiroshima-shi, Hiroshima 731-5161 / JP | [2018/15] | Inventor(s) | 01 /
YAMASHITA, Koji c/o Kobelco Construction Machinery Co., Ltd. Hiroshima Head Office 2-1, Itsukaichikou 2-chome Saeki-ku Hiroshima-shi, Hiroshima 731-5161 / JP | [2018/15] | Representative(s) | TBK Bavariaring 4-6 80336 München / DE | [2018/15] | Application number, filing date | 16799701.4 | 13.04.2016 | [2018/15] | WO2016JP61954 | Priority number, date | JP20150108553 | 28.05.2015 Original published format: JP 2015108553 | [2018/15] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016189993 | Date: | 01.12.2016 | Language: | JA | [2016/48] | Type: | A1 Application with search report | No.: | EP3305992 | Date: | 11.04.2018 | Language: | EN | [2018/15] | Type: | B1 Patent specification | No.: | EP3305992 | Date: | 17.02.2021 | Language: | EN | [2021/07] | Search report(s) | International search report - published on: | JP | 01.12.2016 | (Supplementary) European search report - dispatched on: | EP | 08.06.2018 | Classification | IPC: | E02F3/43, E02F3/36, E02F9/24, E02F9/20 | [2018/28] | CPC: |
E02F9/2033 (EP,US);
E02F3/43 (EP,KR,US);
E02F3/435 (US);
E02F3/963 (US);
E02F9/24 (EP,KR,US);
B66C1/04 (US);
E02F3/32 (US)
(-)
|
Former IPC [2018/15] | E02F3/43, E02F3/36, E02F9/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BAUMASCHINE | [2018/15] | English: | CONSTRUCTION MACHINE | [2018/15] | French: | ENGIN DE CHANTIER | [2018/15] | Entry into regional phase | 27.11.2017 | Translation filed | 27.11.2017 | National basic fee paid | 27.11.2017 | Search fee paid | 27.11.2017 | Designation fee(s) paid | 27.11.2017 | Examination fee paid | Examination procedure | 27.11.2017 | Examination requested [2018/15] | 27.11.2017 | Date on which the examining division has become responsible | 03.09.2018 | Amendment by applicant (claims and/or description) | 22.09.2020 | Communication of intention to grant the patent | 23.12.2020 | Fee for grant paid | 23.12.2020 | Fee for publishing/printing paid | 23.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 18.11.2021 | No opposition filed within time limit [2022/04] | Fees paid | Renewal fee | 27.04.2018 | Renewal fee patent year 03 | 29.04.2019 | Renewal fee patent year 04 | 27.03.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.04.2016 | AL | 17.02.2021 | AT | 17.02.2021 | CY | 17.02.2021 | CZ | 17.02.2021 | DK | 17.02.2021 | EE | 17.02.2021 | ES | 17.02.2021 | FI | 17.02.2021 | HR | 17.02.2021 | LT | 17.02.2021 | LV | 17.02.2021 | MC | 17.02.2021 | MK | 17.02.2021 | MT | 17.02.2021 | NL | 17.02.2021 | PL | 17.02.2021 | RO | 17.02.2021 | RS | 17.02.2021 | SE | 17.02.2021 | SI | 17.02.2021 | SK | 17.02.2021 | SM | 17.02.2021 | IE | 13.04.2021 | LU | 13.04.2021 | BE | 30.04.2021 | CH | 30.04.2021 | LI | 30.04.2021 | BG | 17.05.2021 | NO | 17.05.2021 | GR | 18.05.2021 | IS | 17.06.2021 | PT | 17.06.2021 | [2024/42] |
Former [2024/22] | HU | 13.04.2016 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
MK | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2023/33] | HU | 13.04.2016 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2023/30] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/34] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/23] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/21] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
IE | 13.04.2021 | ||
LU | 13.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/11] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
LU | 13.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/10] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
LU | 13.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/08] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
LU | 13.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/07] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
LU | 13.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/04] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
LU | 13.04.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/50] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/49] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/48] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/46] | AT | 17.02.2021 | |
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/42] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/39] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/38] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/37] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
RS | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/36] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/35] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/33] | FI | 17.02.2021 | |
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | Documents cited: | Search | [ ] - No further relevant documents disclosed | International search | [A]JPH04122755U (Komatsu Ltd.) [A] 1-5 * , paragraph [0012]; fig. 5 (Family: none) *; | [A]JPH05272154 (Komatsu Ltd.) [A] 1-5 * , paragraph [0012]; fig. 1 to 2 (Family: none) *; | [A]JP2001064992 (SUMITOMO CONSTR MACH) [A] 1-5 * , entire text; all drawings (Familv: none) *; | [A]JP2009121175 (CATERPILLAR JAPAN LTD) [A] 1-5 * , entire text; all drawings (Family: none) *; | [A]JP2014163156 (SUMITOMO CONSTR MACHINERY MFG) [A] 1-5* , entire text; all drawings (Family: none) * |