blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3545666

EP3545666 - FIRST NETWORK NODE, SECOND NETWORK NODE, THIRD NETWORK NODE, WIRELESS DEVICE AND METHODS PERFORMED THEREBY, FOR HANDLING CONTENT IN AN INFORMATION-CENTRIC NETWORK [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.06.2023
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  15.07.2022
FormerGrant of patent is intended
Status updated on  06.04.2022
FormerExamination is in progress
Status updated on  16.05.2020
FormerRequest for examination was made
Status updated on  30.08.2019
FormerThe international publication has been made
Status updated on  11.06.2018
Formerunknown
Status updated on  06.12.2016
Most recent event   Tooltip19.07.2024Lapse of the patent in a contracting state
New state(s): BG
published on 21.08.2024  [2024/34]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (PUBL)
164 83 Stockholm / SE
[2019/40]
Inventor(s)01 / INAM, Rafia
Ringduvegatan 63, 1101
724 70 Västerås / SE
02 / VULGARAKIS FELJAN, Aneta
Redskapsvägen 84
162 43 Vällingby / SE
03 / LINDQVIST, Neiva
Docentbacken 3, 1603
SE-114 18 STOCKHOLM / SE
04 / TESLENKO, Maxim
Lillies Väg 80
192 74 Sollentuna / SE
05 / VANDIKAS, Konstantinos
Anders Lundströms Gata 18
169 73 Solna / SE
06 / PAPPA, Ioanna
Fatburs Brunnsgata 11, 3tr
SE-118 28 STOCKHOLM / SE
 [2019/40]
Representative(s)Ericsson
Patent Development
Torshamnsgatan 21-23
164 80 Stockholm / SE
[2019/40]
Application number, filing date16801453.824.11.2016
[2019/40]
WO2016EP78734
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018095531
Date:31.05.2018
Language:EN
[2018/22]
Type: A1 Application with search report 
No.:EP3545666
Date:02.10.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 31.05.2018 takes the place of the publication of the European patent application.
[2019/40]
Type: B1 Patent specification 
No.:EP3545666
Date:17.08.2022
Language:EN
[2022/33]
Search report(s)International search report - published on:EP31.05.2018
ClassificationIPC:H04L67/568, H04L67/5681, H04L67/63
[2022/14]
CPC:
H04L67/63 (EP,US); H04W8/08 (US); H04L67/568 (EP);
H04W64/003 (US); H04L67/5681 (EP)
Former IPC [2019/40]H04L29/08, H04W40/18
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/40]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:ERSTER NETZWERKKNOTEN, ZWEITER NETZWERKKNOTEN, DRITTER NETZWERKKNOTEN, DRAHTLOSE VORRICHTUNG UND DADURCH AUSGEFÜHRTE VERFAHREN ZUR HANDHABUNG VON INHALTEN IN EINEM INFORMATIONSZENTRIERTEN NETZWERK[2019/40]
English:FIRST NETWORK NODE, SECOND NETWORK NODE, THIRD NETWORK NODE, WIRELESS DEVICE AND METHODS PERFORMED THEREBY, FOR HANDLING CONTENT IN AN INFORMATION-CENTRIC NETWORK[2019/40]
French:PREMIER, DEUXIÈME ET TROISIÈME NOEUD DE RÉSEAU, DISPOSITIF SANS FIL ET PROCÉDÉS EXÉCUTÉS PAR CE DERNIER, POUR GÉRER UN CONTENU DANS UN RÉSEAU CENTRÉ SUR L'INFORMATION[2019/40]
Entry into regional phase22.06.2019National basic fee paid 
22.06.2019Designation fee(s) paid 
22.06.2019Examination fee paid 
Examination procedure22.06.2019Amendment by applicant (claims and/or description)
22.06.2019Examination requested  [2019/40]
22.06.2019Date on which the examining division has become responsible
20.05.2020Despatch of a communication from the examining division (Time limit: M04)
23.09.2020Reply to a communication from the examining division
15.12.2020Despatch of a communication from the examining division (Time limit: M04)
23.04.2021Reply to a communication from the examining division
07.04.2022Communication of intention to grant the patent
07.07.2022Fee for grant paid
07.07.2022Fee for publishing/printing paid
07.07.2022Receipt of the translation of the claim(s)
Opposition(s)19.05.2023No opposition filed within time limit [2023/30]
Fees paidRenewal fee
17.07.2019Renewal fee patent year 03
27.11.2019Renewal fee patent year 04
27.11.2020Renewal fee patent year 05
29.11.2021Renewal fee patent year 06
Penalty fee
Additional fee for renewal fee
24.06.201903   M06   Fee paid on   17.07.2019
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.11.2016
AL17.08.2022
AT17.08.2022
BG17.08.2022
CY17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
MK17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
TR17.08.2022
NO17.11.2022
GR18.11.2022
IE24.11.2022
LU24.11.2022
CH30.11.2022
FR30.11.2022
LI30.11.2022
IS17.12.2022
PT19.12.2022
[2024/34]
Former [2024/29]HU24.11.2016
AL17.08.2022
AT17.08.2022
CY17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
MK17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
TR17.08.2022
NO17.11.2022
GR18.11.2022
IE24.11.2022
LU24.11.2022
CH30.11.2022
FR30.11.2022
LI30.11.2022
IS17.12.2022
PT19.12.2022
Former [2024/27]HU24.11.2016
AL17.08.2022
AT17.08.2022
CY17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
MK17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IE24.11.2022
LU24.11.2022
CH30.11.2022
FR30.11.2022
LI30.11.2022
IS17.12.2022
PT19.12.2022
Former [2024/21]HU24.11.2016
AL17.08.2022
AT17.08.2022
CY17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IE24.11.2022
LU24.11.2022
CH30.11.2022
FR30.11.2022
LI30.11.2022
IS17.12.2022
PT19.12.2022
Former [2024/18]HU24.11.2016
AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IE24.11.2022
LU24.11.2022
CH30.11.2022
FR30.11.2022
LI30.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/52]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IE24.11.2022
LU24.11.2022
CH30.11.2022
FR30.11.2022
LI30.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/48]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IE24.11.2022
LU24.11.2022
CH30.11.2022
LI30.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/37]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SI17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
LU24.11.2022
CH30.11.2022
LI30.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/35]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
CH30.11.2022
LI30.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/31]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
MC17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/29]AL17.08.2022
AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/23]AT17.08.2022
CZ17.08.2022
EE17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SK17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/22]AT17.08.2022
CZ17.08.2022
ES17.08.2022
FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
PL17.08.2022
RO17.08.2022
RS17.08.2022
SE17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/20]FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
PL17.08.2022
RS17.08.2022
SE17.08.2022
SM17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/12]FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
PL17.08.2022
RS17.08.2022
SE17.08.2022
NO17.11.2022
GR18.11.2022
IS17.12.2022
PT19.12.2022
Former [2023/11]FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
PL17.08.2022
RS17.08.2022
SE17.08.2022
NO17.11.2022
GR18.11.2022
PT19.12.2022
Former [2023/10]FI17.08.2022
HR17.08.2022
LT17.08.2022
LV17.08.2022
RS17.08.2022
SE17.08.2022
NO17.11.2022
GR18.11.2022
PT19.12.2022
Former [2023/09]FI17.08.2022
LT17.08.2022
LV17.08.2022
RS17.08.2022
SE17.08.2022
NO17.11.2022
PT19.12.2022
Former [2023/08]FI17.08.2022
LT17.08.2022
RS17.08.2022
SE17.08.2022
NO17.11.2022
Cited inInternational search[Y]US2012117240  (OMAR HASSAN M [US]) [Y] 4,5,10-14,25,26,29-31 * paragraph [0013] - paragraph [0014] * * paragraph [0024] - paragraph [0029] *;
 [XY]US2013039249  (RAVINDRAN RAVISHANKAR [US], et al) [X] 1-3,6-9,19-24,27,28,34 * paragraph [0004] * * paragraph [0029] * * paragraph [0043] - paragraph [0047] * [Y] 4,5,10-14,25,26,29-31;
 [X]US2014112307  (KIM JONG-HWAN [KR], et al) [X] 1-3,8,9,19-24,34 * paragraph [0039] - paragraph [0044] *;
 [A]  - VASILIOS A SIRIS ET AL, "A Selective Neighbor Caching Approach for Supporting Mobility in Publish/Subscribe Networks", (20110614), pages 63 - 67, PROCEEDINGS OF THE 5TH ERCIM WORKSHOP ON EMOBILITY (IN CONJUNCTION WITH WWIC 2011), JUNE 14, 2011 - VILANOVA I LA GELTRÚ, CATALONIA, SPAIN,, URL: http://atlas.tk.informatik.tu-darmstadt.de/Publications/2011/TUD-CS-2011-2893.pdf#page=69, (20130123), XP002690920 [A] 1-14,19-31,34 * page 1 - page 3 *
 [A]  - BURCEA I ET AL, "Disconnected operation in publish/subscribe middleware", MOBILE DATA MANAGEMENT, 2004. PROCEEDINGS. 2004 IEEE INTERNATIONAL CON FERENCE ON BERKELEY, CA, USA 19-22 JAN. 2004, LOS ALAMITOS, CA, USA,IEEE COMPUT. SOC, US, (20040119), doi:10.1109/MDM.2004.1263041, ISBN 978-0-7695-2070-4, pages 39 - 50, XP010681042 [A] 1-14,19-31,34 * page 6 - page 7 *

DOI:   http://dx.doi.org/10.1109/MDM.2004.1263041
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.