blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3309891

EP3309891 - NICKEL-ZINC BATTERY CELL PACK AND BATTERY PACK ASSEMBLY [Right-click to bookmark this link]
Former [2018/16]NICKEL-ZINC BATTERY CELL PACK AND BATTERY PACK USING SAME
[2020/23]
StatusThe application is deemed to be withdrawn
Status updated on  05.03.2021
Database last updated on 18.10.2024
FormerGrant of patent is intended
Status updated on  04.06.2020
FormerRequest for examination was made
Status updated on  22.03.2018
FormerThe international publication has been made
Status updated on  23.12.2016
Most recent event   Tooltip05.03.2021Application deemed to be withdrawnpublished on 07.04.2021  [2021/14]
Applicant(s)For all designated states
NGK Insulators, Ltd.
2-56, Suda-cho Mizuho-ku
Nagoya-shi, Aichi 467-8530 / JP
[2018/16]
Inventor(s)01 / GONDA, Yuichi
c/o NGK Insulators, Ltd.
2-56, Suda-cho
Mizuho-ku
Nagoya-Shi, Aichi 467-8530 / JP
02 / KITOH, Kenshin
c/o NGK Insulators, Ltd.
2-56, Suda-cho
Mizuho-ku
Nagoya-Shi, Aichi 467-8530 / JP
 [2018/16]
Representative(s)MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB
Paul-Heyse-Strasse 29
80336 München / DE
[2018/16]
Application number, filing date16811525.108.06.2016
[2018/16]
WO2016JP67120
Priority number, dateJP2015012026015.06.2015         Original published format: JP 2015120260
[2018/16]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016204050
Date:22.12.2016
Language:JA
[2016/51]
Type: A1 Application with search report 
No.:EP3309891
Date:18.04.2018
Language:EN
[2018/16]
Search report(s)International search report - published on:JP22.12.2016
(Supplementary) European search report - dispatched on:EP11.12.2018
ClassificationIPC:H01M10/30, H01M2/10, H01M2/14, H01M2/16, H01M4/42, H01M4/48, H01M10/0562, // H01M2/02
[2019/02]
CPC:
H01M10/30 (EP,US); H01M10/0562 (EP,US); H01M4/364 (US);
H01M4/366 (US); H01M4/38 (US); H01M4/483 (US);
H01M4/523 (US); H01M50/121 (EP,US); H01M50/136 (EP,US);
H01M50/211 (EP,US); H01M50/431 (EP,US); H01M50/451 (EP,US);
H01M50/457 (EP,US); H01M50/489 (EP,US); H01M50/491 (EP,US);
H01M50/497 (EP,US); H01M2300/0014 (EP,US); H01M2300/0068 (EP,US);
H01M50/557 (EP,US); Y02E60/10 (EP); Y02P70/50 (EP) (-)
Former IPC [2018/16]H01M10/30, H01M2/02, H01M2/06, H01M2/10, H01M2/14, H01M2/16, H01M4/42, H01M4/48
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/16]
TitleGerman:NICKEL-ZINK-BATTERIEZELLENPACK UND BATTERIEBAUGRUPPE[2020/23]
English:NICKEL-ZINC BATTERY CELL PACK AND BATTERY PACK ASSEMBLY[2020/23]
French:BLOC D'ÉLÉMENTS DE BATTERIE AU NICKEL-ZINC ET ASSEMBLAGE DE LA BATTERIE[2020/23]
Former [2018/16]NICKEL-ZINK-BATTERIEZELLENPACK UND BATTERIEPACK MIT VERWENDUNG DAVON
Former [2018/16]NICKEL-ZINC BATTERY CELL PACK AND BATTERY PACK USING SAME
Former [2018/16]BLOC D'ÉLÉMENTS DE BATTERIE AU NICKEL-ZINC ET BLOC-BATTERIE L'UTILISANT
Entry into regional phase12.12.2017Translation filed 
15.01.2018National basic fee paid 
15.01.2018Search fee paid 
15.01.2018Designation fee(s) paid 
15.01.2018Examination fee paid 
Examination procedure12.12.2017Date on which the examining division has become responsible
15.01.2018Examination requested  [2018/16]
17.07.2019Amendment by applicant (claims and/or description)
05.06.2020Communication of intention to grant the patent
16.10.2020Application deemed to be withdrawn, date of legal effect  [2021/14]
20.11.2020Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2021/14]
Fees paidRenewal fee
02.07.2018Renewal fee patent year 03
13.06.2019Renewal fee patent year 04
31.03.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]US6183900  (BRONOEL GUY [FR], et al) [Y] 9* column 2, line 19 - column 6, line 63; figures 1-3 *;
 [XYI]EP2814104  (NGK INSULATORS LTD [JP]) [X] 1,2,6-8,10-13 * page 3, paragraph 0014 - page 6, paragraph 0040; figures 1,2 * [Y] 9 [I] 3-5,14,15
International search[A]WO2013118561  (NGK INSULATORS LTD [JP]) [A] 1-20 * , paragraph [0016]; examples & JP 5600815 B2 & US 2014/0315099 A1 paragraph [0016]; examples & EP 2814104 A1 & CN 104067437 A *;
 [A]WO2014119665  (NIPPON CATALYTIC CHEM IND [JP]) [A] 1-20 * , example 11 & JP 2015-15229 A & US 2015/0364790 A1 example 11 & EP 2953191 A1 & CN 104969384 A & KR 10-2015-0113089 A *;
 [A]JP2014167910  (NIPPON CATALYTIC CHEM IND) [A] 1-20 * , & US 2015/0364789 A1 & WO 2014/119663 A1 & EP 2953190 A1 & CN 104981923 A & KR 10-2015-0113124 A *;
 [A]JP2015109260  (SAMSUNG SDI CO LTD) [A] 1-20 * , & JP 2015-109260 A & US 2015/0155589 A1 & EP 2882025 A1 & CN 104681848 A *;
 [PA]JP2016072207  (NGK INSULATORS LTD) [PA] 1-20* , & WO 2016/051934 A1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.