EP3391210 - SCALABLE TENANT NETWORKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.09.2023 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 21.10.2022 | ||
Former | Grant of patent is intended Status updated on 12.10.2022 | ||
Former | Examination is in progress Status updated on 28.01.2020 | ||
Former | Request for examination was made Status updated on 21.09.2018 | ||
Former | The international publication has been made Status updated on 23.06.2017 | ||
Former | unknown Status updated on 13.01.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC, TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, WA 98052-6399 / US | [2021/45] |
Former [2018/43] | For all designated states Microsoft Technology Licensing, LLC One Microsoft Way Redmond, Washington 98052-6399 / US | Inventor(s) | 01 /
GADDEHOSUR, Poornananda R. Microsoft Technology Licensing, LLC Attn: Patent Group Docketing (Bldg. 8/1000) One Microsoft Way Redmond Washington 98052-6399 / US | 02 /
SCHULTZ, Benjamin M. Microsoft Technology Licensing, LLC Attn: Patent Group Docketing (Bldg. 8/1000) One Microsoft Way Redmond Washington 98052-6399 / US | [2022/34] |
Former [2018/43] | 01 /
GADDEHOSUR, Poornananda R. Microsoft Technology Licensing LLC Attn: Patent Group Docketing (Bldg. 8/1000) One Microsoft Way Redmond Washington 98052-6399 / US | ||
02 /
SCHULTZ, Benjamin M. Microsoft Technology Licensing LLC Attn: Patent Group Docketing (Bldg. 8/1000) One Microsoft Way Redmond Washington 98052-6399 / US | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2018/43] | Application number, filing date | 16820420.4 | 08.12.2016 | [2018/43] | WO2016US65471 | Priority number, date | US201562267664P | 15.12.2015 Original published format: US 201562267664 P | US201615075049 | 18.03.2016 Original published format: US201615075049 | [2018/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017105969 | Date: | 22.06.2017 | Language: | EN | [2017/25] | Type: | A1 Application with search report | No.: | EP3391210 | Date: | 24.10.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.06.2017 takes the place of the publication of the European patent application. | [2018/43] | Type: | B1 Patent specification | No.: | EP3391210 | Date: | 23.11.2022 | Language: | EN | [2022/47] | Search report(s) | International search report - published on: | EP | 22.06.2017 | Classification | IPC: | G06F9/455 | [2018/43] | CPC: |
G06F9/45537 (EP,US);
H04L12/4675 (US);
H04L41/0893 (US);
H04L41/0894 (EP);
H04L41/12 (US);
H04L41/122 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | MANDANTENFÄHIGE SKALIERBARE NETZWERKE | [2018/43] | English: | SCALABLE TENANT NETWORKS | [2018/43] | French: | RÉSEAUX DE LOCATAIRES ÉVOLUTIFS | [2018/43] | Entry into regional phase | 01.06.2018 | National basic fee paid | 01.06.2018 | Designation fee(s) paid | 01.06.2018 | Examination fee paid | Examination procedure | 07.06.2017 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 01.06.2018 | Examination requested [2018/43] | 01.06.2018 | Date on which the examining division has become responsible | 31.01.2019 | Amendment by applicant (claims and/or description) | 31.01.2020 | Despatch of a communication from the examining division (Time limit: M04) | 31.03.2020 | Reply to a communication from the examining division | 24.05.2022 | Date of oral proceedings | 27.07.2022 | Minutes of oral proceedings despatched | 01.08.2022 | Communication of intention to grant the patent | 12.10.2022 | Fee for grant paid | 12.10.2022 | Fee for publishing/printing paid | 12.10.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 24.08.2023 | No opposition filed within time limit [2023/44] | Fees paid | Renewal fee | 12.12.2018 | Renewal fee patent year 03 | 13.12.2019 | Renewal fee patent year 04 | 14.12.2020 | Renewal fee patent year 05 | 10.11.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.12.2016 | AL | 23.11.2022 | AT | 23.11.2022 | CY | 23.11.2022 | CZ | 23.11.2022 | DK | 23.11.2022 | EE | 23.11.2022 | ES | 23.11.2022 | FI | 23.11.2022 | HR | 23.11.2022 | IT | 23.11.2022 | LT | 23.11.2022 | LV | 23.11.2022 | MC | 23.11.2022 | MK | 23.11.2022 | PL | 23.11.2022 | RO | 23.11.2022 | RS | 23.11.2022 | SE | 23.11.2022 | SI | 23.11.2022 | SK | 23.11.2022 | SM | 23.11.2022 | TR | 23.11.2022 | IE | 08.12.2022 | LU | 08.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | NO | 23.02.2023 | GR | 24.02.2023 | IS | 23.03.2023 | PT | 23.03.2023 | [2024/29] |
Former [2024/27] | HU | 08.12.2016 | |
AL | 23.11.2022 | ||
AT | 23.11.2022 | ||
CY | 23.11.2022 | ||
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
IT | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
MK | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SI | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
IE | 08.12.2022 | ||
LU | 08.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2024/26] | HU | 08.12.2016 | |
AL | 23.11.2022 | ||
AT | 23.11.2022 | ||
CY | 23.11.2022 | ||
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
IT | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SI | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
IE | 08.12.2022 | ||
LU | 08.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2024/21] | HU | 08.12.2016 | |
AL | 23.11.2022 | ||
AT | 23.11.2022 | ||
CY | 23.11.2022 | ||
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SI | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
IE | 08.12.2022 | ||
LU | 08.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2024/18] | HU | 08.12.2016 | |
AL | 23.11.2022 | ||
AT | 23.11.2022 | ||
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SI | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
IE | 08.12.2022 | ||
LU | 08.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/51] | AL | 23.11.2022 | |
AT | 23.11.2022 | ||
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SI | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
IE | 08.12.2022 | ||
LU | 08.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/49] | AL | 23.11.2022 | |
AT | 23.11.2022 | ||
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
IE | 08.12.2022 | ||
LU | 08.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/48] | AL | 23.11.2022 | |
AT | 23.11.2022 | ||
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
IE | 08.12.2022 | ||
LU | 08.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/47] | AL | 23.11.2022 | |
AT | 23.11.2022 | ||
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
LU | 08.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/38] | AL | 23.11.2022 | |
AT | 23.11.2022 | ||
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SK | 23.11.2022 | ||
SM | 23.11.2022 | ||
LU | 08.12.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/37] | AL | 23.11.2022 | |
AT | 23.11.2022 | ||
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/35] | AT | 23.11.2022 | |
CZ | 23.11.2022 | ||
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RO | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/34] | AT | 23.11.2022 | |
DK | 23.11.2022 | ||
EE | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/33] | AT | 23.11.2022 | |
DK | 23.11.2022 | ||
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
SM | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/26] | AT | 23.11.2022 | |
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
PL | 23.11.2022 | ||
RS | 23.11.2022 | ||
SE | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
IS | 23.03.2023 | ||
PT | 23.03.2023 | ||
Former [2023/24] | AT | 23.11.2022 | |
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
HR | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
SE | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
PT | 23.03.2023 | ||
Former [2023/23] | AT | 23.11.2022 | |
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
LT | 23.11.2022 | ||
LV | 23.11.2022 | ||
SE | 23.11.2022 | ||
NO | 23.02.2023 | ||
GR | 24.02.2023 | ||
PT | 23.03.2023 | ||
Former [2023/22] | AT | 23.11.2022 | |
ES | 23.11.2022 | ||
FI | 23.11.2022 | ||
LT | 23.11.2022 | ||
SE | 23.11.2022 | ||
NO | 23.02.2023 | ||
PT | 23.03.2023 | ||
Former [2023/20] | LT | 23.11.2022 | |
NO | 23.02.2023 | Cited in | International search | [I]US8484353 (JOHNSON DON [US], et al) [I] 1-15 * abstract *; | [I]US2014137104 (NELSON MICHAEL [US], et al) [I] 1-15 * abstract * * paragraph [0001] - paragraph [0002] * * paragraph [0010] - paragraph [0016] * * paragraph [0023] - paragraph [0036] * * figures 1-6; claims 1-5 *; | [I]US2015207703 (GALLAGHER PHYLLIS [US], et al) [I] 1-15 * abstract * * paragraph [0002] * * paragraph [0007] - paragraph [0019] * * paragraph [0021] - paragraph [0023] * * paragraph [0025] - paragraph [0026] * * figures 1-4; claims 1-10 *; | [A] - MOSHARAF KABIR CHOWDHURY N M ET AL, "A Survey of Network Virtualization", INTERNET CITATION, (20051015), pages 1 - 29, URL: https://cs.uwaterloo.ca/research/tr/2008/CS-2008-25.pdf, (20121210), XP002689235 [A] 1-15 * the whole document * |