EP3377850 - INSPECTION GROUP OF AN ELONGATED ELEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.02.2024 Database last updated on 07.06.2024 | |
Former | The patent has been granted Status updated on 17.03.2023 | ||
Former | Grant of patent is intended Status updated on 06.11.2022 | ||
Former | Examination is in progress Status updated on 23.04.2021 | ||
Former | Request for examination was made Status updated on 24.08.2018 | ||
Former | The international publication has been made Status updated on 26.05.2017 | ||
Former | unknown Status updated on 20.01.2017 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states G.D S.p.A. Via Battindarno, 91 40133 Bologna / IT | [2018/39] | Inventor(s) | 01 /
CASAGRANDE, Alberto Via Lame 147 40013 Castel Maggiore (Bologna) / IT | 02 /
MORELLI, Sergio Via Torino 22 40068 Bologna / IT | 03 /
SPIRITO, Gilberto Via Sandro Botticelli 10 40133 Bologna / IT | 04 /
FEDERICI, Luca Via Lippo di Dalmasio 13 40135 Bologna / IT | [2018/39] | Representative(s) | Luppi Intellectual Property S.r.l. Viale Corassori, 54 41124 Modena / IT | [N/P] |
Former [2018/39] | Crugnola, Pietro, et al Luppi Intellectual Property Srl Viale Corassori, 54 41124 Modena / IT | Application number, filing date | 16825556.0 | 17.11.2016 | [2018/39] | WO2016IB56927 | Priority number, date | IT2015UB05673 | 18.11.2015 Original published format: IT UB20155673 | [2018/39] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017085662 | Date: | 26.05.2017 | Language: | EN | [2017/21] | Type: | A1 Application with search report | No.: | EP3377850 | Date: | 26.09.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.05.2017 takes the place of the publication of the European patent application. | [2018/39] | Type: | B1 Patent specification | No.: | EP3377850 | Date: | 19.04.2023 | Language: | EN | [2023/16] | Search report(s) | International search report - published on: | EP | 26.05.2017 | Classification | IPC: | G01B11/24, G01B11/245, G01B11/25, A24C5/34 | [2018/39] | CPC: |
G01B11/2408 (EP,KR,US);
A24C5/3412 (EP,KR,US);
G01B11/245 (EP,KR,US);
G01B11/25 (EP,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | INSPEKTIONSGRUPPE EINES LÄNGLICHEN ELEMENTS | [2018/39] | English: | INSPECTION GROUP OF AN ELONGATED ELEMENT | [2018/39] | French: | GROUPE D'INSPECTION D'UN ÉLÉMENT ALLONGÉ | [2018/39] | Entry into regional phase | 18.06.2018 | National basic fee paid | 18.06.2018 | Designation fee(s) paid | 18.06.2018 | Examination fee paid | Examination procedure | 17.05.2018 | Date on which the examining division has become responsible | 18.06.2018 | Examination requested [2018/39] | 07.01.2019 | Amendment by applicant (claims and/or description) | 26.04.2021 | Despatch of a communication from the examining division (Time limit: M06) | 03.11.2021 | Reply to a communication from the examining division | 07.11.2022 | Communication of intention to grant the patent | 09.03.2023 | Fee for grant paid | 09.03.2023 | Fee for publishing/printing paid | 09.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 22.01.2024 | No opposition filed within time limit [2024/13] | Fees paid | Renewal fee | 27.11.2018 | Renewal fee patent year 03 | 27.11.2019 | Renewal fee patent year 04 | 27.11.2020 | Renewal fee patent year 05 | 29.11.2021 | Renewal fee patent year 06 | 28.11.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 19.04.2023 | CZ | 19.04.2023 | DK | 19.04.2023 | EE | 19.04.2023 | FI | 19.04.2023 | HR | 19.04.2023 | IT | 19.04.2023 | LT | 19.04.2023 | LV | 19.04.2023 | RS | 19.04.2023 | SE | 19.04.2023 | SI | 19.04.2023 | SK | 19.04.2023 | SM | 19.04.2023 | NO | 19.07.2023 | IS | 19.08.2023 | PT | 21.08.2023 | [2024/26] |
Former [2024/24] | AT | 19.04.2023 | |
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SI | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/10] | AT | 19.04.2023 | |
CZ | 19.04.2023 | ||
DK | 19.04.2023 | ||
EE | 19.04.2023 | ||
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/08] | AT | 19.04.2023 | |
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
SK | 19.04.2023 | ||
SM | 19.04.2023 | ||
NO | 19.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/03] | AT | 19.04.2023 | |
FI | 19.04.2023 | ||
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2024/01] | AT | 19.04.2023 | |
HR | 19.04.2023 | ||
LT | 19.04.2023 | ||
LV | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/51] | AT | 19.04.2023 | |
HR | 19.04.2023 | ||
RS | 19.04.2023 | ||
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/50] | AT | 19.04.2023 | |
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
IS | 19.08.2023 | ||
PT | 21.08.2023 | ||
Former [2023/48] | AT | 19.04.2023 | |
SE | 19.04.2023 | ||
NO | 19.07.2023 | ||
PT | 21.08.2023 | ||
Former [2023/46] | PT | 21.08.2023 | Cited in | International search | [A]WO8300738 (BROKEN HILL PTY CO LTD [AU]) [A] 1-8 * abstract ** page 9, line 4 - page 10, line 15; figures 5A-5C *; | [Y]US5797406 (DAWSON JOHN [GB]) [Y] 6-8 * column 5, lines 15-25, 47-65; figures 4-5 *; | [Y]US2006109485 (LAEMMEL MAX [DE]) [Y] 1-8 * paragraphs [0006] , [0012] , [0017] , [0018] , [0028] - [0033]; figures 1-3 *; | [Y]EP1901031 (MICRO EPSILON OPTRONIC GMBH [DE]) [Y] 1-8 * abstract *; | [Y]EP1901030 (MICRO EPSILON OPTRONIC GMBH [DE]) [Y] 1-8 * abstract *; | [Y]US2011052039 (URABE KOUJI [JP], et al) [Y] 1-8 * paragraphs [0001] , [0043] - [0045] - [0 49] , [0 54] - [0057]; figures 1-3 * | Examination | US4188544 |