EP3325093 - NETWORK OF INTERNET CONNECTED AUTOMATED EXTERNAL DEFIBRILLATORS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.03.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 31.03.2023 | ||
Former | Grant of patent is intended Status updated on 15.11.2022 | ||
Former | Examination is in progress Status updated on 05.11.2019 | ||
Former | Request for examination was made Status updated on 27.04.2018 | ||
Former | The international publication has been made Status updated on 27.01.2017 | Most recent event Tooltip | 12.07.2024 | Lapse of the patent in a contracting state New state(s): GB, IE | published on 14.08.2024 [2024/33] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2020/18] |
Former [2018/22] | For all designated states ROBERT BOSCH GMBH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
DAS, Samarjit 1819 Pioneer Drive Sewickley, PA 15143 / US | [2018/31] |
Former [2018/22] | 01 /
DAS, Samarjit 5562 Hobart Street Apt. 318 Pittsburgh, PA 15217 / US | Representative(s) | (deleted) | [N/P] |
Former [2018/22] | DREISS Patentanwälte PartG mbB Postfach 10 37 62 70032 Stuttgart / DE | Application number, filing date | 16828636.7 | 22.07.2016 | [2018/22] | WO2016US43665 | Priority number, date | US201562196219P | 23.07.2015 Original published format: US 201562196219 P | [2018/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017015598 | Date: | 26.01.2017 | Language: | EN | [2017/04] | Type: | A1 Application with search report | No.: | EP3325093 | Date: | 30.05.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.01.2017 takes the place of the publication of the European patent application. | [2018/22] | Type: | B1 Patent specification | No.: | EP3325093 | Date: | 03.05.2023 | Language: | EN | [2023/18] | Search report(s) | International search report - published on: | KR | 26.01.2017 | (Supplementary) European search report - dispatched on: | EP | 19.02.2019 | Classification | IPC: | H04W4/02, H04W4/90, A61N1/39, G16H40/20 | [2022/45] | CPC: |
A61N1/3993 (EP,US);
G08B25/10 (US);
G16H40/20 (EP);
H04W4/023 (EP,US);
H04W4/90 (EP,US)
|
Former IPC [2019/12] | H04W4/02, H04W4/90, A61N1/39 | ||
Former IPC [2018/22] | A61N1/39 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | NETZWERK VON MIT DEM INTERNET VERBUNDENEN AUTOMATISIERTEN EXTERNEN DEFIBRILLATOREN | [2018/22] | English: | NETWORK OF INTERNET CONNECTED AUTOMATED EXTERNAL DEFIBRILLATORS | [2018/22] | French: | RÉSEAU DE DÉFIBRILLATEURS EXTERNES AUTOMATISÉS RACCORDÉS À INTERNET | [2018/22] | Entry into regional phase | 23.02.2018 | National basic fee paid | 23.02.2018 | Search fee paid | 23.02.2018 | Designation fee(s) paid | 23.02.2018 | Examination fee paid | Examination procedure | 15.01.2018 | Date on which the examining division has become responsible | 23.02.2018 | Examination requested [2018/22] | 11.09.2019 | Amendment by applicant (claims and/or description) | 08.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 13.03.2020 | Reply to a communication from the examining division | 19.08.2020 | Despatch of a communication from the examining division (Time limit: M04) | 16.12.2020 | Reply to a communication from the examining division | 07.07.2021 | Despatch of a communication from the examining division (Time limit: M04) | 10.11.2021 | Reply to a communication from the examining division | 16.11.2022 | Communication of intention to grant the patent | 23.03.2023 | Fee for grant paid | 23.03.2023 | Fee for publishing/printing paid | 23.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 06.02.2024 | No opposition filed within time limit [2024/15] | Fees paid | Renewal fee | 31.07.2018 | Renewal fee patent year 03 | 31.07.2019 | Renewal fee patent year 04 | 31.07.2020 | Renewal fee patent year 05 | 02.08.2021 | Renewal fee patent year 06 | 01.08.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 03.05.2023 | CZ | 03.05.2023 | DK | 03.05.2023 | EE | 03.05.2023 | ES | 03.05.2023 | FI | 03.05.2023 | HR | 03.05.2023 | IT | 03.05.2023 | LT | 03.05.2023 | LV | 03.05.2023 | MC | 03.05.2023 | NL | 03.05.2023 | PL | 03.05.2023 | RO | 03.05.2023 | RS | 03.05.2023 | SE | 03.05.2023 | SI | 03.05.2023 | SK | 03.05.2023 | SM | 03.05.2023 | IE | 22.07.2023 | LU | 22.07.2023 | BE | 31.07.2023 | CH | 31.07.2023 | GB | 03.08.2023 | NO | 03.08.2023 | GR | 04.08.2023 | IS | 03.09.2023 | PT | 04.09.2023 | [2024/33] |
Former [2024/26] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
IT | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
MC | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
LU | 22.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/24] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
MC | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SI | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
LU | 22.07.2023 | ||
BE | 31.07.2023 | ||
CH | 31.07.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/18] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
MC | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
LU | 22.07.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/14] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
MC | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/10] | AT | 03.05.2023 | |
CZ | 03.05.2023 | ||
DK | 03.05.2023 | ||
EE | 03.05.2023 | ||
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RO | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/08] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
SK | 03.05.2023 | ||
SM | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/03] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
FI | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2024/01] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
HR | 03.05.2023 | ||
LT | 03.05.2023 | ||
LV | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/51] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
HR | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
RS | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/50] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
NL | 03.05.2023 | ||
PL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
GR | 04.08.2023 | ||
IS | 03.09.2023 | ||
PT | 04.09.2023 | ||
Former [2023/48] | AT | 03.05.2023 | |
ES | 03.05.2023 | ||
NL | 03.05.2023 | ||
SE | 03.05.2023 | ||
NO | 03.08.2023 | ||
PT | 04.09.2023 | ||
Former [2023/46] | ES | 03.05.2023 | |
PT | 04.09.2023 | Documents cited: | Search | [A]US2009201147 (GOTTLIEB MARK [US]) [A] 1-13* the whole document *; | [Y]US2010023074 (POWERS DANIEL J [US], et al) [Y] 1-13 * paragraph [0034] * * paragraph [0039] *; | [Y]US9035787 (BONGBERG MICAH [US], et al) [Y] 1-13 * figures 1, 7 * * column 7 * * column 20 - column 21 * | International search | [A]US2012271370 (HOCHHALTER KEITH W [US], et al) [A] 1-13 * See entire document. *; | [A]US2014002241 (ELGHAZZAWI ZIAD F [US]) [A] 1-13 * See claim 1; figures 1-4. *; | [A]US2015112704 (BRAUN ODELIA [US]) [A] 1-13 * See entire document. *; | [A]US9026147 (GALVIN MOIRA MONTGOMERY [US], et al) [A] 1-13* See entire document. *; | [A]US9035787 (BONGBERG MICAH [US], et al) [A] 1-13 * See entire document. * | Examination | US2002087194 | by applicant | US2010023074 | US2014002241 | US9035787 |