blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3375044

EP3375044 - DIRECTIVE FIXED BEAM RAMP EBG ANTENNA MOUNTED WITHIN A CAVITY [Right-click to bookmark this link]
Former [2018/38]DIRECTIVE FIXED BEAM RAMP EBG ANTENNA
[2020/41]
StatusNo opposition filed within time limit
Status updated on  31.12.2021
Database last updated on 14.06.2024
FormerThe patent has been granted
Status updated on  22.01.2021
FormerGrant of patent is intended
Status updated on  17.09.2020
FormerExamination is in progress
Status updated on  25.09.2019
FormerRequest for examination was made
Status updated on  17.08.2018
FormerThe international publication has been made
Status updated on  19.05.2017
Formerunknown
Status updated on  01.02.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Raytheon Company
870 Winter Street
Waltham, MA 02451-1449 / US
[2018/38]
Inventor(s)01 / NG, Jackson
2248 E. 3rd Street
Tucson, Arizona 85719 / US
02 / GILBERT, Charles, G.
7439 E. Placita Luz De La Luna
Tucson, Arizona 85715 / US
03 / ANDERSON, Jack, H.
7539 E. Hampton Place
Tucson, Arizona 85715-4208 / US
04 / JIMENEZ, Robyn
2800 E. Andrada Road
Vail, Arizona 85641 / US
 [2018/38]
Representative(s)Carpmaels & Ransford LLP
One Southampton Row
London WC1B 5HA / GB
[2018/38]
Application number, filing date16829339.712.07.2016
[2018/38]
WO2016US41874
Priority number, dateUS20151493671110.11.2015         Original published format: US201514936711
[2018/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017082971
Date:18.05.2017
Language:EN
[2017/20]
Type: A1 Application with search report 
No.:EP3375044
Date:19.09.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 18.05.2017 takes the place of the publication of the European patent application.
[2018/38]
Type: B1 Patent specification 
No.:EP3375044
Date:24.02.2021
Language:EN
[2021/08]
Search report(s)International search report - published on:EP18.05.2017
ClassificationIPC:H01Q15/00, H01Q9/04, H01Q1/28
[2018/38]
CPC:
H01Q1/286 (EP,US); H01Q9/0407 (US); H01Q1/12 (US);
H01Q1/42 (US); H01Q1/48 (US); H01Q15/008 (EP,US);
H01Q9/0421 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/38]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:EBG-ANTENNE MIT GERICHTETER FIXER STRAHLRAMPE[2018/38]
English:DIRECTIVE FIXED BEAM RAMP EBG ANTENNA MOUNTED WITHIN A CAVITY[2020/41]
French:ANTENNE EBG DIRECTIVE À RAMPE DE FAISCEAU FIXE[2018/38]
Former [2018/38]DIRECTIVE FIXED BEAM RAMP EBG ANTENNA
Entry into regional phase15.03.2018National basic fee paid 
15.03.2018Designation fee(s) paid 
15.03.2018Examination fee paid 
Examination procedure15.03.2018Examination requested  [2018/38]
15.03.2018Date on which the examining division has become responsible
20.11.2018Amendment by applicant (claims and/or description)
30.09.2019Despatch of a communication from the examining division (Time limit: M04)
10.02.2020Reply to a communication from the examining division
18.09.2020Communication of intention to grant the patent
31.12.2020Fee for grant paid
31.12.2020Fee for publishing/printing paid
31.12.2020Receipt of the translation of the claim(s)
Opposition(s)25.11.2021No opposition filed within time limit [2022/05]
Fees paidRenewal fee
11.07.2018Renewal fee patent year 03
15.07.2019Renewal fee patent year 04
14.07.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.07.2016
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
MK24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE12.07.2021
LU12.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
[2024/22]
Former [2023/33]HU12.07.2016
AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE12.07.2021
LU12.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
Former [2023/30]AL24.02.2021
AT24.02.2021
CY24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE12.07.2021
LU12.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
Former [2022/35]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
IE12.07.2021
LU12.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
Former [2022/34]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
LU12.07.2021
BE31.07.2021
CH31.07.2021
LI31.07.2021
Former [2022/23]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
IT24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
LU12.07.2021
CH31.07.2021
LI31.07.2021
Former [2022/21]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
CH31.07.2021
LI31.07.2021
Former [2022/18]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
MC24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/13]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SI24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/10]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2022/08]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
ES24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2022/07]AL24.02.2021
AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/50]AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RO24.02.2021
RS24.02.2021
SE24.02.2021
SK24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/49]AT24.02.2021
CZ24.02.2021
DK24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/48]AT24.02.2021
CZ24.02.2021
EE24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/46]AT24.02.2021
FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
SM24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/42]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
IS24.06.2021
PT24.06.2021
Former [2021/39]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
PL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/38]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
NL24.02.2021
RS24.02.2021
SE24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/37]FI24.02.2021
HR24.02.2021
LT24.02.2021
LV24.02.2021
RS24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/36]FI24.02.2021
HR24.02.2021
LT24.02.2021
BG24.05.2021
NO24.05.2021
GR25.05.2021
PT24.06.2021
Former [2021/35]FI24.02.2021
HR24.02.2021
LT24.02.2021
NO24.05.2021
PT24.06.2021
Former [2021/33]FI24.02.2021
LT24.02.2021
NO24.05.2021
PT24.06.2021
Cited inInternational search[Y]US4415900  (KALOI CYRIL M [US]) [Y] 1-10,12,13 * column 1, line 9 - line 10 * * column 2, line 35 - line 62; figures 1a-1c *;
 [Y]US5892485  (GLABE JOHN [US], et al) [Y] 3,4,10-20 * column 5, line 48 - column 6, line 3; figures 6,7 *;
 [A]US2015029062  (NG JACKSON [US], et al) [A] 1-20* abstract *;
 [Y]US2015130673  (NG JACKSON [US], et al) [Y] 1-20 * paragraph [0002] * * paragraph [0016] - paragraph [0017] * * paragraph [0053] - paragraph [0064]; figures 1, 2 * * paragraph [0068]; figure 3 *;
 [A]  - RAHMAT-SAMII Y, "The marvels of electromagnetic band gap (ebg) structures: novel microwave and optical applications", MICROWAVE AND OPTOELECTRONICS CONFERENCE, 2003. IMOC 2003. PROCEEDINGS OF THE 2003 SBMO/IEEE MTT-S INTERNATIONAL 20-23 SEPT. 2003, PISCATAWAY, NJ, USA,IEEE, US, (20030920), vol. 1, doi:10.1109/IMOC.2003.1244869, ISBN 978-0-7803-7824-7, pages 265 - 275, XP010669596 [A] 1-20 * page 265 - page 266; figure 2 *

DOI:   http://dx.doi.org/10.1109/IMOC.2003.1244869
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.