EP3320734 - LINK ADAPTATION IN GRANT-FREE MULTIPLE ACCESS SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.04.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 26.04.2019 | ||
Former | Grant of patent is intended Status updated on 10.12.2018 | ||
Former | Request for examination was made Status updated on 13.04.2018 | ||
Former | The international publication has been made Status updated on 03.02.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2018/20] | Inventor(s) | 01 /
LIU, Bin 5340 Legacy Drive Suite 175 Plano, Texas 75024 / US | 02 /
STIRLING-GALLACHER, Richard 5340 Legacy Drive Suite 175 Plano, Texas 75024 / US | 03 /
WANG, Jian 5340 Legacy Drive Suite 175 Plano, Texas 75024 / US | [2018/20] | Representative(s) | Maiwald GmbH Elisenhof Elisenstraße 3 80335 München / DE | [N/P] |
Former [2019/22] | Maiwald Patent- und Rechtsanwaltsgesellschaft mbH Elisenhof Elisenstraße 3 80335 München / DE | ||
Former [2018/20] | Maiwald Patentanwalts GmbH Engineering Elisenhof Elisenstrasse 3 80335 München / DE | Application number, filing date | 16829791.9 | 20.07.2016 | [2018/20] | WO2016CN90773 | Priority number, date | US201514810119 | 27.07.2015 Original published format: US201514810119 | [2018/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017016425 | Date: | 02.02.2017 | Language: | EN | [2017/05] | Type: | A1 Application with search report | No.: | EP3320734 | Date: | 16.05.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 02.02.2017 takes the place of the publication of the European patent application. | [2018/20] | Type: | B1 Patent specification | No.: | EP3320734 | Date: | 29.05.2019 | Language: | EN | [2019/22] | Search report(s) | International search report - published on: | CN | 02.02.2017 | (Supplementary) European search report - dispatched on: | EP | 29.05.2018 | Classification | IPC: | H04W74/08, H04L1/00 | [2019/01] | CPC: |
H04L1/0003 (EP,KR,US);
H04W72/00 (RU,US);
H04W72/1268 (KR,US);
H04L1/0009 (EP,US);
H04L1/0023 (EP,US);
H04W24/08 (KR,US);
H04W72/04 (RU);
H04W72/23 (KR,US);
H04W74/0833 (US);
H04W74/04 (US)
(-)
|
Former IPC [2018/26] | H04W74/08, H04W28/02, H04L1/00, H04W24/08 | ||
Former IPC [2018/20] | H04W72/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | LINK-ANPASSUNG IN BERECHTIGUNGSFREIEN MEHRFACHZUGANGSSYSTEMEN | [2018/20] | English: | LINK ADAPTATION IN GRANT-FREE MULTIPLE ACCESS SYSTEMS | [2018/20] | French: | ADAPTATION DE LIAISON DANS DES SYSTÈMES À ACCÈS MULTIPLE SANS AUTORISATION | [2018/20] | Entry into regional phase | 06.02.2018 | National basic fee paid | 06.02.2018 | Search fee paid | 06.02.2018 | Designation fee(s) paid | 06.02.2018 | Examination fee paid | Examination procedure | 06.02.2018 | Examination requested [2018/20] | 06.02.2018 | Date on which the examining division has become responsible | 10.10.2018 | Amendment by applicant (claims and/or description) | 11.12.2018 | Communication of intention to grant the patent | 26.03.2019 | Fee for grant paid | 26.03.2019 | Fee for publishing/printing paid | 16.04.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.03.2020 | No opposition filed within time limit [2020/19] | Fees paid | Renewal fee | 11.07.2018 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.07.2016 | AL | 29.05.2019 | AT | 29.05.2019 | CY | 29.05.2019 | CZ | 29.05.2019 | DK | 29.05.2019 | EE | 29.05.2019 | ES | 29.05.2019 | FI | 29.05.2019 | HR | 29.05.2019 | IT | 29.05.2019 | LT | 29.05.2019 | LV | 29.05.2019 | MC | 29.05.2019 | MK | 29.05.2019 | MT | 29.05.2019 | NL | 29.05.2019 | PL | 29.05.2019 | RO | 29.05.2019 | RS | 29.05.2019 | SE | 29.05.2019 | SI | 29.05.2019 | SK | 29.05.2019 | SM | 29.05.2019 | TR | 29.05.2019 | IE | 20.07.2019 | LU | 20.07.2019 | BE | 31.07.2019 | CH | 31.07.2019 | LI | 31.07.2019 | BG | 29.08.2019 | NO | 29.08.2019 | GR | 30.08.2019 | IS | 29.09.2019 | PT | 30.09.2019 | [2022/32] |
Former [2021/34] | HU | 20.07.2016 | |
AL | 29.05.2019 | ||
AT | 29.05.2019 | ||
CY | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
MT | 29.05.2019 | ||
NL | 29.05.2019 | ||
PL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
TR | 29.05.2019 | ||
IE | 20.07.2019 | ||
LU | 20.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
IS | 29.09.2019 | ||
PT | 30.09.2019 | ||
Former [2021/32] | HU | 20.07.2016 | |
AL | 29.05.2019 | ||
AT | 29.05.2019 | ||
CY | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
PL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
TR | 29.05.2019 | ||
IE | 20.07.2019 | ||
LU | 20.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
IS | 29.09.2019 | ||
PT | 30.09.2019 | ||
Former [2021/31] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CY | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
PL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
TR | 29.05.2019 | ||
IE | 20.07.2019 | ||
LU | 20.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
IS | 29.09.2019 | ||
PT | 30.09.2019 | ||
Former [2021/26] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CY | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
PL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
TR | 29.05.2019 | ||
IE | 20.07.2019 | ||
LU | 20.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/36] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
PL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
TR | 29.05.2019 | ||
IE | 20.07.2019 | ||
LU | 20.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/25] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
PL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SI | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
TR | 29.05.2019 | ||
LU | 20.07.2019 | ||
BE | 31.07.2019 | ||
CH | 31.07.2019 | ||
LI | 31.07.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/17] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
TR | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/14] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
MC | 29.05.2019 | ||
NL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SK | 29.05.2019 | ||
SM | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/12] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
IT | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
NL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SK | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/11] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
EE | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
NL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
SK | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/10] | AL | 29.05.2019 | |
AT | 29.05.2019 | ||
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
NL | 29.05.2019 | ||
RO | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/09] | AL | 29.05.2019 | |
CZ | 29.05.2019 | ||
DK | 29.05.2019 | ||
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2020/07] | AL | 29.05.2019 | |
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
NL | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2019/51] | AL | 29.05.2019 | |
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
BG | 29.08.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2019/50] | AL | 29.05.2019 | |
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
LV | 29.05.2019 | ||
RS | 29.05.2019 | ||
SE | 29.05.2019 | ||
NO | 29.08.2019 | ||
GR | 30.08.2019 | ||
PT | 30.09.2019 | ||
Former [2019/49] | AL | 29.05.2019 | |
ES | 29.05.2019 | ||
FI | 29.05.2019 | ||
HR | 29.05.2019 | ||
LT | 29.05.2019 | ||
SE | 29.05.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
Former [2019/48] | ES | 29.05.2019 | |
FI | 29.05.2019 | ||
LT | 29.05.2019 | ||
SE | 29.05.2019 | ||
NO | 29.08.2019 | ||
PT | 30.09.2019 | ||
Former [2019/47] | ES | 29.05.2019 | |
FI | 29.05.2019 | ||
LT | 29.05.2019 | ||
NO | 29.08.2019 | Documents cited: | Search | [A]WO2014070049 (ERICSSON TELEFON AB L M [SE]); | International search | [A]US2001043613 (WIBOWO EKO ADI [CA], et al); | [A]CN101345906 (DATANG MOBILE COMM EQUIP CO [CN]); | [XA]WO2014135126 (HUAWEI TECH CO LTD [CN]) |