Extract from the Register of European Patents

EP About this file: EP3284569

EP3284569 - POWDER SLUSH MOLDING MACHINE AND POWDER SLUSH MOLDING METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.03.2021
Database last updated on 01.04.2026
FormerThe patent has been granted
Status updated on  17.04.2020
FormerGrant of patent is intended
Status updated on  09.01.2020
FormerRequest for examination was made
Status updated on  19.01.2018
FormerThe international publication has been made
Status updated on  03.02.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Nakata Coating Co., Ltd.
82, Higashikawashima-cho Hodogaya-ku
Yokohama-shi, Kanagawa 240-0041 / JP
[2018/08]
Inventor(s)01 / MATSUNO, Takemi
c/o NAKATA COATING Co.,Ltd.
82, Higashikawashima-cho
Hodogaya-ku
Yokohama-shi Kanagawa 240-0041 / JP
 [2020/21]
Former [2018/08]01 / MATSUNO, Takemi
c/o NAKATA COATING Co. Ltd.
82 Higashikawashima-cho
Hodogaya-ku
Yokohama-shi Kanagawa 240-0041 / JP
Representative(s)IPAZ
Bâtiment Platon
Parc Les Algorithmes
91190 Saint-Aubin / FR
[N/P]
Former [2020/21]IPAZ
Parc Les Algorithmes, Bâtiment Platon
CS 70003 Saint-Aubin
91192 Gif-sur-Yvette Cedex / FR
Former [2018/08]Pontet Allano & Associes
Parc Les Algorithmes, Bâtiment Platon
CS 70003 Saint-Aubin
91192 Gif-sur-Yvette Cedex / FR
Application number, filing date16830345.115.07.2016
[2018/08]
WO2016JP70935
Priority number, dateJP2015014920229.07.2015         Original published format: JP 2015149202
[2018/08]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017018240
Date:02.02.2017
Language:JA
[2017/05]
Type: A1 Application with search report 
No.:EP3284569
Date:21.02.2018
Language:EN
[2018/08]
Type: B1 Patent specification 
No.:EP3284569
Date:20.05.2020
Language:EN
[2020/21]
Search report(s)International search report - published on:JP02.02.2017
(Supplementary) European search report - dispatched on:EP23.11.2018
ClassificationIPC:B29C41/18, B29C41/38, B29C41/46, B29C33/36, // B29K105/00, B29C35/08
[2018/52]
CPC:
B29C41/18 (EP,US); B29C33/36 (EP,US); B29C41/46 (EP,US);
B29C2035/0822 (EP,US); B29C41/38 (EP,US); B29C41/52 (EP,US);
B29K2105/251 (EP,US) (-)
Former IPC [2018/08]B29C41/18, B29C41/38, B29C41/46
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/08]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:PULVER-ROTATIONSSINTERMASCHINE UND PULVER-ROTATIONSSINTERVERFAHREN[2020/04]
English:POWDER SLUSH MOLDING MACHINE AND POWDER SLUSH MOLDING METHOD[2018/08]
French:MACHINE DE MOULAGE PAR EMBOUAGE DE POUDRE ET PROCÉDÉ DE MOULAGE PAR EMBOUAGE DE POUDRE[2018/08]
Former [2018/08]PULVERSCHALENFORMUNGSMASCHINE UND PULVERSCHALENFORMUNGSVERFAHREN
Entry into regional phase24.10.2017Translation filed 
24.10.2017National basic fee paid 
24.10.2017Search fee paid 
24.10.2017Designation fee(s) paid 
24.10.2017Examination fee paid 
Examination procedure24.10.2017Examination requested  [2018/08]
24.10.2017Date on which the examining division has become responsible
24.05.2019Amendment by applicant (claims and/or description)
10.01.2020Communication of intention to grant the patent
10.04.2020Fee for grant paid
10.04.2020Fee for publishing/printing paid
10.04.2020Receipt of the translation of the claim(s)
Opposition(s)23.02.2021No opposition filed within time limit [2021/17]
Fees paidRenewal fee
27.07.2018Renewal fee patent year 03
30.07.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.07.2016
AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
MK20.05.2020
MT20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
TR20.05.2020
IE15.07.2020
LU15.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG20.08.2020
GB20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
[2022/32]
Former [2022/27]HU15.07.2016
AL20.05.2020
AT20.05.2020
CY20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
MT20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
TR20.05.2020
IE15.07.2020
LU15.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG20.08.2020
GB20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/38]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
IE15.07.2020
LU15.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG20.08.2020
GB20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/37]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
IE15.07.2020
LU15.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/24]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SI20.05.2020
SK20.05.2020
SM20.05.2020
LU15.07.2020
BE31.07.2020
CH31.07.2020
LI31.07.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/20]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SK20.05.2020
SM20.05.2020
LU15.07.2020
CH31.07.2020
LI31.07.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/13]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
MC20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/10]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
PL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SK20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/09]AL20.05.2020
AT20.05.2020
CZ20.05.2020
DK20.05.2020
EE20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
IT20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/08]AL20.05.2020
DK20.05.2020
ES20.05.2020
FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RO20.05.2020
RS20.05.2020
SE20.05.2020
SM20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/04]AL20.05.2020
FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
NL20.05.2020
RS20.05.2020
SE20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2021/01]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
SE20.05.2020
BG20.08.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/51]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
RS20.05.2020
SE20.05.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/50]FI20.05.2020
HR20.05.2020
LT20.05.2020
LV20.05.2020
SE20.05.2020
NO20.08.2020
GR21.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/48]FI20.05.2020
LT20.05.2020
SE20.05.2020
NO20.08.2020
IS20.09.2020
PT21.09.2020
Former [2020/47]LT20.05.2020
NO20.08.2020
IS20.09.2020
Former [2020/46]IS20.09.2020
Documents cited:Search[YA] WO2004080686  (NAKATA COATING CO LTD et al.) [Y] 1,2,5-8 * page 5 - page 25; figures 1-14; claims 1-12 *[A] 3,4
 [YA] EP2402136  (NAKATA COATING CO LTD et al.) [Y] 1,2,5-8 * page 5 - page 18; figures 1-14; claims 1-13 *[A] 3,4
 [YA] JP3272432   [Y] 1,2,5-8 * paragraph [0008] - paragraph [0023]; figures 1-3; claim 1 *[A] 3,4
 [YA] EP2130660  (INT AUTOMOTIVE COMPONENTS et al.) [Y] 1,2,5-8 * paragraph [0067]; figures 2-4 * * paragraph [0085] - paragraph [0086] *[A] 3,4
 [A] WO03031139  (COLLINS & AIKMAN AUTOMOTIVE CO et al.) [A] 1-8 * page 7 - page 8; figures 1-3; claims 1-3 *
 [XP] WO2016031531  (NAKATA COATING CO LTD et al.) [XP] 1-8 * page 7 * * page 26 - page 30 * * the whole document * * figures 6, 1, 2 *
International search[A] JP2008137272  (NAKATA COATING CO LTD et al.) [A] 1-8 * , entire text (Family: none) *
 [A] JP2005028773  (NAKATA COATING CO LTD et al.) [A] 1-8 * , entire text (Family: none) *
 [A] JP2002210768  (HONDA MOTOR CO LTD et al.) [A] 1-8 * , entire text (Family: none) *
 [A] JPH04164610  (HONDA MOTOR CO LTD et al.) [A] 1-8 * , entire text (Family: none) *
 [A] JPH02249613  (HONDA MOTOR CO LTD et al.) [A] 1-8 * , entire text (Family: none) *
 [A] JPH01297224  (TOYOTA MOTOR CORP et al.) [A] 1-8 * , entire text (Family: none) *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.