EP3340205 - INFORMATION PROCESSING DEVICE, INFORMATION PROCESSING METHOD, AND PROGRAM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.07.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 13.08.2021 | ||
Former | Grant of patent is intended Status updated on 08.04.2021 | ||
Former | Examination is in progress Status updated on 09.03.2020 | ||
Former | Request for examination was made Status updated on 25.05.2018 | ||
Former | The international publication has been made Status updated on 25.02.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Sony Group Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2021/30] |
Former [2018/26] | For all designated states Sony Corporation 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | Inventor(s) | 01 /
TAKAMATSU, Shingo c/o SONY CORPORATION 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | 02 /
KAWAMOTO, Kenta c/o SONY CORPORATION 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | 03 /
IDE, Naoki c/o SONY CORPORATION 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | 04 /
KOBAYASHI, Yoshiyuki c/o SONY CORPORATION 1-7-1 Konan Minato-ku Tokyo 108-0075 / JP | [2018/26] | Representative(s) | MFG Patentanwälte Meyer-Wildhagen Meggle-Freund Gerhard PartG mbB Amalienstraße 62 80799 München / DE | [2018/26] | Application number, filing date | 16836839.7 | 19.05.2016 | [2018/26] | WO2016JP64835 | Priority number, date | JP20150161791 | 19.08.2015 Original published format: JP 2015161791 | [2018/26] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017029847 | Date: | 23.02.2017 | Language: | JA | [2017/08] | Type: | A1 Application with search report | No.: | EP3340205 | Date: | 27.06.2018 | Language: | EN | [2018/26] | Type: | B1 Patent specification | No.: | EP3340205 | Date: | 15.09.2021 | Language: | EN | [2021/37] | Search report(s) | International search report - published on: | JP | 23.02.2017 | (Supplementary) European search report - dispatched on: | EP | 12.04.2019 | Classification | IPC: | G08G1/16, B60R21/00, G08G1/09, G08G1/0967, G08G1/01 | [2019/20] | CPC: |
G08G1/096725 (EP,US);
G06V20/56 (US);
B60R21/00 (EP,US);
B60W30/09 (US);
G05D1/0061 (US);
G06T7/85 (US);
G08G1/0104 (EP,US);
G08G1/09 (EP,US);
G08G1/163 (EP,US);
|
Former IPC [2018/26] | G08G1/16, B60R21/00, G08G1/09 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | INFORMATIONSVERARBEITUNGSVORRICHTUNG, INFORMATIONSVERARBEITUNGSVERFAHREN UND PROGRAMM | [2018/26] | English: | INFORMATION PROCESSING DEVICE, INFORMATION PROCESSING METHOD, AND PROGRAM | [2018/26] | French: | DISPOSITIF DE TRAITEMENT D'INFORMATIONS, PROCÉDÉ DE TRAITEMENT D'INFORMATIONS ET PROGRAMME | [2018/26] | Entry into regional phase | 16.02.2018 | Translation filed | 16.03.2018 | National basic fee paid | 16.03.2018 | Search fee paid | 16.03.2018 | Designation fee(s) paid | 16.03.2018 | Examination fee paid | Examination procedure | 16.02.2018 | Date on which the examining division has become responsible | 16.03.2018 | Examination requested [2018/26] | 21.10.2019 | Amendment by applicant (claims and/or description) | 12.03.2020 | Despatch of a communication from the examining division (Time limit: M02) | 08.05.2020 | Reply to a communication from the examining division | 03.02.2021 | Date of oral proceedings | 01.04.2021 | Minutes of oral proceedings despatched | 09.04.2021 | Communication of intention to grant the patent | 26.07.2021 | Receipt of the translation of the claim(s) | 04.08.2021 | Fee for grant paid | 04.08.2021 | Fee for publishing/printing paid | Opposition(s) | 16.06.2022 | No opposition filed within time limit [2022/34] | Fees paid | Renewal fee | 25.05.2018 | Renewal fee patent year 03 | 23.05.2019 | Renewal fee patent year 04 | 30.03.2020 | Renewal fee patent year 05 | 19.05.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.05.2016 | AL | 15.09.2021 | AT | 15.09.2021 | CY | 15.09.2021 | CZ | 15.09.2021 | DK | 15.09.2021 | EE | 15.09.2021 | ES | 15.09.2021 | FI | 15.09.2021 | HR | 15.09.2021 | IT | 15.09.2021 | LT | 15.09.2021 | LV | 15.09.2021 | MC | 15.09.2021 | MK | 15.09.2021 | PL | 15.09.2021 | RO | 15.09.2021 | RS | 15.09.2021 | SE | 15.09.2021 | SI | 15.09.2021 | SK | 15.09.2021 | SM | 15.09.2021 | TR | 15.09.2021 | BG | 15.12.2021 | NO | 15.12.2021 | GR | 16.12.2021 | IS | 15.01.2022 | PT | 17.01.2022 | GB | 19.05.2022 | IE | 19.05.2022 | LU | 19.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | FR | 31.05.2022 | LI | 31.05.2022 | [2024/29] |
Former [2024/22] | HU | 19.05.2016 | |
AL | 15.09.2021 | ||
AT | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
MK | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
GB | 19.05.2022 | ||
IE | 19.05.2022 | ||
LU | 19.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
FR | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2024/20] | HU | 19.05.2016 | |
AL | 15.09.2021 | ||
AT | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
GB | 19.05.2022 | ||
IE | 19.05.2022 | ||
LU | 19.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
FR | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2024/18] | HU | 19.05.2016 | |
AL | 15.09.2021 | ||
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
GB | 19.05.2022 | ||
IE | 19.05.2022 | ||
LU | 19.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
FR | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/27] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
GB | 19.05.2022 | ||
IE | 19.05.2022 | ||
LU | 19.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
FR | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/25] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
IE | 19.05.2022 | ||
LU | 19.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
FR | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/22] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
IE | 19.05.2022 | ||
LU | 19.05.2022 | ||
CH | 31.05.2022 | ||
FR | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/20] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
IE | 19.05.2022 | ||
LU | 19.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/10] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
IT | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
LU | 19.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/09] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
LU | 19.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/08] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
LU | 19.05.2022 | ||
Former [2023/06] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/36] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/29] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/25] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/24] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/23] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
PL | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
PT | 17.01.2022 | ||
Former [2022/21] | AT | 15.09.2021 | |
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/10] | FI | 15.09.2021 | |
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/09] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/08] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/07] | LT | 15.09.2021 | |
NO | 15.12.2021 | Documents cited: | Search | [XA]US2003216880 (ENDOH TOSHIO [JP]) [X] 1-3,5,14,15 * abstract * * figures 1-4,8-15 * * paragraph [0008] * * paragraph [0002] * * paragraph [0010] * * paragraph [0042] - paragraph [0062] * * paragraph [0123] - paragraph [0126] *[A] 6-11; | [XI]JP2005050187 (NISSAN MOTOR) [X] 1-3,5,7,8,11-14 * abstract * * figures 1-12 * * paragraph [0004] - paragraph [0026] * * paragraph [0032] - paragraph [0100] * * Section 2 in * [I] 9,10,15; | [XAI]WO2012020293 (TOYOTA MOTOR CO LTD [JP], et al) [X] 1-6,11-14 * abstract * * figures 1,3-4,12-13 * * paragraph [0022] - paragraph [0040] * * paragraph [0047] - paragraph [0077] * [A] 8-10 [I] 7,15; | [XI]JP2014071839 (HONDA MOTOR CO LTD) [X] 1-3,5,12-15 * abstract * * figures 1-13 * * paragraph [0009] - paragraph [0044] * * paragraph [0069] * * paragraph [0071] * [I] 4,6-11 | International search | [XY]JP2005050187 (NISSAN MOTOR) [X] 1-12, 14-17 * , paragraphs [0004], [0010] to [0042], [0054] to [0061], [0070], [0100]; fig. 1, 3 (Family: none) * [Y] 13; | [Y]JP2008299676 (TOYOTA MOTOR CORP) [Y] 13* , paragraphs [0038] to [0047]; fig. 4 (Family: none) * |