EP3337340 - STEVIOL GLYCOSIDE SOLUTIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.08.2022 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 03.09.2021 | ||
Former | Grant of patent is intended Status updated on 09.02.2021 | ||
Former | Examination is in progress Status updated on 23.09.2019 | ||
Former | Request for examination was made Status updated on 25.05.2018 | ||
Former | The international publication has been made Status updated on 25.02.2017 | Most recent event Tooltip | 19.04.2024 | Lapse of the patent in a contracting state New state(s): CY | published on 22.05.2024 [2024/21] | Applicant(s) | For all designated states Purecircle Usa Inc. 915 Harger Road Suite 250 Oak Brook, IL 60523-1492 / US | [2021/40] |
Former [2018/26] | For all designated states Purecircle Usa Inc. 915 Harger Road Suite 250 Oak Brook, IL 60523-1492 / US | Inventor(s) | 01 /
KIM, Grace 70 Lincoln Oaks Drive Apt. 0701 Willowbrook, IL 60527 / US | 02 /
JOHNSON, Marquita, L. 10133 S. Karlov Avenue Oak Lawn, IL 60453 / US | 03 /
MARKOSYAN, Avetik 10-54 Babajanyan Street Yerevan 375064 / AM | 04 /
MARTIN, John 507 North Ada Street Chicago, IL 60642 / US | 05 /
TAN, Kian, Pin No. 12 Kampung Sungai Suloh Mukim 9 Batu Pahat Johor 83040 / MY | [2018/26] | Representative(s) | BRP Renaud & Partner mbB Rechtsanwälte Patentanwälte Steuerberater Königstraße 28 70173 Stuttgart / DE | [2021/40] |
Former [2018/26] | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | Application number, filing date | 16837825.5 | 18.08.2016 | [2018/26] | WO2016US47525 | Priority number, date | US201562206756P | 18.08.2015 Original published format: US 201562206756 P | [2018/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017031301 | Date: | 23.02.2017 | Language: | EN | [2017/08] | Type: | A1 Application with search report | No.: | EP3337340 | Date: | 27.06.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.02.2017 takes the place of the publication of the European patent application. | [2018/26] | Type: | B1 Patent specification | No.: | EP3337340 | Date: | 06.10.2021 | Language: | EN | [2021/40] | Search report(s) | International search report - published on: | US | 23.02.2017 | (Supplementary) European search report - dispatched on: | EP | 07.02.2019 | Classification | IPC: | A23L27/30, A23L27/00 | [2018/26] | CPC: |
A23L27/36 (EP,US);
A23L2/60 (EP,US);
A23V2002/00 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | STEVIOLGLYCOSIDLÖSUNGEN | [2018/26] | English: | STEVIOL GLYCOSIDE SOLUTIONS | [2018/26] | French: | SOLUTIONS DE GLYCOSIDE DE STÉVIOL | [2018/26] | Entry into regional phase | 19.03.2018 | National basic fee paid | 19.03.2018 | Search fee paid | 19.03.2018 | Designation fee(s) paid | 19.03.2018 | Examination fee paid | Examination procedure | 15.03.2018 | Date on which the examining division has become responsible | 19.03.2018 | Examination requested [2018/26] | 20.06.2019 | Observations by third parties | 09.09.2019 | Amendment by applicant (claims and/or description) | 26.09.2019 | Despatch of a communication from the examining division (Time limit: M06) | 30.03.2020 | Reply to a communication from the examining division | 26.05.2020 | Despatch of a communication from the examining division (Time limit: M06) | 09.10.2020 | Reply to a communication from the examining division | 10.02.2021 | Communication of intention to grant the patent | 13.07.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 19.08.2021 | Fee for grant paid | 19.08.2021 | Fee for publishing/printing paid | 19.08.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 07.07.2022 | No opposition filed within time limit [2022/37] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 19.08.2021 | Request for further processing filed | 19.08.2021 | Full payment received (date of receipt of payment) Request granted | 30.08.2021 | Decision despatched | Fees paid | Renewal fee | 27.08.2018 | Renewal fee patent year 03 | 27.08.2019 | Renewal fee patent year 04 | 27.08.2020 | Renewal fee patent year 05 | 27.08.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.08.2016 | AL | 06.10.2021 | AT | 06.10.2021 | CY | 06.10.2021 | CZ | 06.10.2021 | DK | 06.10.2021 | EE | 06.10.2021 | ES | 06.10.2021 | FI | 06.10.2021 | HR | 06.10.2021 | IT | 06.10.2021 | LT | 06.10.2021 | LV | 06.10.2021 | MC | 06.10.2021 | NL | 06.10.2021 | PL | 06.10.2021 | RO | 06.10.2021 | RS | 06.10.2021 | SE | 06.10.2021 | SI | 06.10.2021 | SK | 06.10.2021 | SM | 06.10.2021 | BG | 06.01.2022 | NO | 06.01.2022 | GR | 07.01.2022 | IS | 06.02.2022 | PT | 07.02.2022 | [2024/21] |
Former [2024/18] | HU | 18.08.2016 | |
AL | 06.10.2021 | ||
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
IT | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2023/27] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
IT | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2023/16] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
MC | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2023/01] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SI | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/49] | AL | 06.10.2021 | |
AT | 06.10.2021 | ||
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/35] | AT | 06.10.2021 | |
CZ | 06.10.2021 | ||
DK | 06.10.2021 | ||
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SK | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/34] | AT | 06.10.2021 | |
EE | 06.10.2021 | ||
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RO | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/33] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
SM | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/25] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
BG | 06.01.2022 | ||
NO | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/24] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
NL | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
SE | 06.10.2021 | ||
BG | 06.01.2022 | ||
GR | 07.01.2022 | ||
IS | 06.02.2022 | ||
PT | 07.02.2022 | ||
Former [2022/23] | AT | 06.10.2021 | |
ES | 06.10.2021 | ||
FI | 06.10.2021 | ||
HR | 06.10.2021 | ||
LT | 06.10.2021 | ||
LV | 06.10.2021 | ||
PL | 06.10.2021 | ||
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
PT | 07.02.2022 | ||
Former [2022/22] | AT | 06.10.2021 | |
FI | 06.10.2021 | ||
LT | 06.10.2021 | ||
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
Former [2022/21] | AT | 06.10.2021 | |
RS | 06.10.2021 | ||
BG | 06.01.2022 | ||
Former [2022/19] | BG | 06.01.2022 | Documents cited: | Search | [XI]JPS5550866 (MARUZEN KASEI CO LTD) [X] 1-4,8,9 * abstract * * pages 1-3 * * examples 1-3 * [I] 1-9; | [XI]JPS62146599 (DAINIPPON INK & CHEMICALS) [X] 1-5,8,9 * abstract * * claims 1,2 * * paragraphs [0001] - [0003] * [I] 1-9; | [XI]US2013251881 (MUTILANGI WILLIAM [US], et al) [X] 1-5,7,8 * claims 1-19 * * paragraphs [0017] - [0037] * [I] 1-9; | [XI]US2013209658 (SPELMAN KIERAN P [US], et al) [X] 1-9 * claims 1-66 * * paragraphs [0002] , [0043] - [0047] * [I] 1-9 | International search | [Y]WO2015014958 (DSM IP ASSETS BV [NL]) [Y] 1-9 * entire document *; | [Y]US2002197376 (BROZ RICHARD [US]) [Y] 1-9 * entire document *; | [Y]US2014171520 (MARKOSYAN AVETIK [AM], et al) [Y] 2 * entire document * | Examination | US2013209658 | US2014171519 | US2013274351 | by applicant | US4361697 | US4082858 | US4892938 | US5972120 | US5962678 | US7838044 | US7862845 | JPS5550866B | JPS62146599 | US2013251881 | US2013209658 | US8293302 | US8377927 | US8257948 | US8318232 | US8318459 | US8323716 | US8501261 | US8669077 | US8735101 | US8911971 | US8993269 | US9055761 | US8993028 | US2013330463 | - CHANG S. S.COOK, J. M., "Stability studies of stevioside and rebaudioside A in carbonated beverages", J. Agric. Food Chem., (19830000), vol. 31, doi:10.1021/jf00116a056, pages 409 - 412, XP055013770 DOI: http://dx.doi.org/10.1021/jf00116a056 | - TANAKA O., "Improvement of taste of natural sweeteners", Pure Appl. Chem., (19870000), vol. 69, pages 675 - 683, XP008144245 | - "Stevia: steps in developing a new sweetener", PHILLIPS K. C., Developments in sweeteners, Elsevier Applied Science, (19890000), vol. 3, pages 1 - 43 |