EP3327769 - APPARATUS AND MANUFACTURING METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.12.2021 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 01.01.2021 | ||
Former | Grant of patent is intended Status updated on 28.09.2020 | ||
Former | Request for examination was made Status updated on 27.04.2018 | ||
Former | The international publication has been made Status updated on 04.03.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2018/22] | Inventor(s) | 01 /
FU, Huili Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
LIN, Jyh Rong Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 03 /
CAI, Shujie Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2018/22] | Representative(s) | Körber, Martin Hans Mitscherlich PartmbB Patent- und Rechtsanwälte Sonnenstrasse 33 80331 München / DE | [2018/22] | Application number, filing date | 16838559.9 | 23.08.2016 | [2018/22] | WO2016CN96373 | Priority number, date | CN201510535388 | 27.08.2015 Original published format: CN201510535388 | [2018/22] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017032301 | Date: | 02.03.2017 | Language: | ZH | [2017/09] | Type: | A1 Application with search report | No.: | EP3327769 | Date: | 30.05.2018 | Language: | EN | [2018/22] | Type: | B1 Patent specification | No.: | EP3327769 | Date: | 03.02.2021 | Language: | EN | [2021/05] | Search report(s) | International search report - published on: | CN | 02.03.2017 | (Supplementary) European search report - dispatched on: | EP | 09.07.2018 | Classification | IPC: | H01L23/373, H01L21/48, H01L23/42 | [2018/32] | CPC: |
H01L23/3735 (EP,US);
H01L23/3733 (US);
H01L21/4871 (US);
H01L23/3672 (US);
H01L23/3736 (EP,US);
H01L23/42 (EP,US);
H01L21/4882 (EP,US);
H01L2224/16225 (EP,US);
H01L2224/73204 (EP,US);
H01L2224/73253 (EP,US);
H01L2224/8384 (EP);
H01L2924/15311 (EP,US);
H01L2924/16152 (EP,US)
(-)
|
Former IPC [2018/22] | H01L23/373, H01L21/48 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/22] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VORRICHTUNG UND HERSTELLUNGSVERFAHREN | [2018/22] | English: | APPARATUS AND MANUFACTURING METHOD | [2018/22] | French: | APPAREIL ET PROCÉDÉ DE FABRICATION | [2018/22] | Entry into regional phase | 19.02.2018 | Translation filed | 19.02.2018 | National basic fee paid | 19.02.2018 | Search fee paid | 19.02.2018 | Designation fee(s) paid | 19.02.2018 | Examination fee paid | Examination procedure | 19.02.2018 | Examination requested [2018/22] | 19.02.2018 | Date on which the examining division has become responsible | 05.02.2019 | Amendment by applicant (claims and/or description) | 29.09.2020 | Communication of intention to grant the patent | 14.12.2020 | Receipt of the translation of the claim(s) | 24.12.2020 | Fee for grant paid | 24.12.2020 | Fee for publishing/printing paid | Opposition(s) | 04.11.2021 | No opposition filed within time limit [2022/02] | Fees paid | Renewal fee | 27.08.2018 | Renewal fee patent year 03 | 29.08.2019 | Renewal fee patent year 04 | 26.08.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.08.2016 | AL | 03.02.2021 | AT | 03.02.2021 | CY | 03.02.2021 | CZ | 03.02.2021 | DK | 03.02.2021 | EE | 03.02.2021 | ES | 03.02.2021 | FI | 03.02.2021 | HR | 03.02.2021 | IT | 03.02.2021 | LT | 03.02.2021 | LV | 03.02.2021 | MC | 03.02.2021 | MK | 03.02.2021 | NL | 03.02.2021 | PL | 03.02.2021 | RO | 03.02.2021 | RS | 03.02.2021 | SE | 03.02.2021 | SI | 03.02.2021 | SK | 03.02.2021 | SM | 03.02.2021 | BG | 03.05.2021 | NO | 03.05.2021 | GR | 04.05.2021 | IS | 03.06.2021 | PT | 04.06.2021 | GB | 23.08.2021 | IE | 23.08.2021 | LU | 23.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | FR | 31.08.2021 | LI | 31.08.2021 | [2024/22] |
Former [2023/30] | HU | 23.08.2016 | |
AL | 03.02.2021 | ||
AT | 03.02.2021 | ||
CY | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
GB | 23.08.2021 | ||
IE | 23.08.2021 | ||
LU | 23.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/29] | HU | 23.08.2016 | |
AL | 03.02.2021 | ||
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
GB | 23.08.2021 | ||
IE | 23.08.2021 | ||
LU | 23.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/35] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
GB | 23.08.2021 | ||
IE | 23.08.2021 | ||
LU | 23.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/34] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
LU | 23.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/23] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
LU | 23.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/21] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/18] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2022/13] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2022/10] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2022/08] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/07] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/50] | AT | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/49] | AT | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/48] | AT | 03.02.2021 | |
CZ | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/46] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/42] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/39] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/38] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/37] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
RS | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/36] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/35] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
NO | 03.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/33] | FI | 03.02.2021 | |
LT | 03.02.2021 | ||
NO | 03.05.2021 | ||
PT | 04.06.2021 | Documents cited: | Search | [XY]EP1684340 (NISSAN MOTOR [JP], et al) [X] 1,3-5,7,9,10,13,14,16 * figure - * * paragraph [0013] - paragraph [0014] * * paragraph [0038] - paragraph [0046] * * CN1819172 cited in ISR * [Y] 6,8,11,12,15,17-19; | [XY]US2008073776 (SUH DAEWOONG [US], et al) [X] 1-3,5,12-17 * figure - * * CN101159251 cited in ISR * * paragraph [0011] - paragraph [0012] * * paragraph [0018] - paragraph [0029] * [Y] 6,8-11,18,19; | [A]US2009096100 (KAJIWARA RYOICHI [JP], et al) [A] 1-19 * figure - ** paragraph [0049] - paragraph [0058] *; | [XY]US2015041827 (IWATA AYA [JP], et al) [X] 1-4,7,8,13,14,16 * figure - * * paragraph [0027] - paragraph [0034] * [Y] 6,9-12,15,17-19 | International search | [Y]CN1819172 (NISSAN MOTOR [JP]) [Y] 2-13, 15-19 * description, page 3, line 18 to page 9, line 3, and figures 1A and 1B *; | [A]US2007131913 (CHENG CHING-TAI [TW], et al) [A] 1-19* the whole document *; | [XY]CN101159251 (INTEL CORP [US]) [X] 1, 3-5, 12-14, 16, 17 * description, page 2, line 18 to page 9, line 12, and figures 1 and 2 description, page 2, line 18 to page 9, line 12, and figures 1 and 2 * [Y] 2-13, 15-19; | [Y]US2008145607 (KAJIWARA RYOICHI [JP], et al) [Y] 2-13, 15-19 * description, paragraphs [0047]-[0087], and figures 1-4 *; | [A]CN101930953 (IBM) [A] 1-19 * the whole document *; | [A]US2013328204 (ZOMMER NATHAN [US]) [A] 1-19 * the whole document *; | [PX]CN105355610 (HUAWEI TECH CO LTD) [PX] 1-19 * the whole document * |