EP3348715 - CONSTRUCTION MACHINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.03.2021 Database last updated on 12.08.2024 | |
Former | The patent has been granted Status updated on 03.04.2020 | ||
Former | Grant of patent is intended Status updated on 17.11.2019 | ||
Former | Request for examination was made Status updated on 15.06.2018 | ||
Former | The international publication has been made Status updated on 21.03.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Hitachi Construction Machinery Co., Ltd. 16-1, Higashiueno 2-chome Taito-ku Tokyo 110-0015 / JP | [2018/29] | Inventor(s) | 01 /
TSUCHIE, Yoshiyuki c/o HITACHI, LTD. 6-6 Marunouchi 1-chome Chiyoda-ku Tokyo 100-8280 / JP | 02 /
SAKAMOTO, Hiroshi c/o TSUCHIURA WORKS HITACHI CONSTRUCTION MACHINERY CO., LTD. 650 Kandatsumachi Tsuchiura-shi Ibaraki 300-0013 / JP | 03 /
MORIKI, Hidekazu c/o HITACHI, LTD. 6-6 Marunouchi 1-chome Chiyoda-ku Tokyo 100-8280 / JP | 04 /
TSURUGA, Yasutaka c/o TSUCHIURA WORKS HITACHI CONSTRUCTION MACHINERY CO., LTD. 650 Kandatsumachi Tsuchiura-shi Ibaraki 300-0013 / JP | [2018/29] | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | [2018/29] | Application number, filing date | 16843978.4 | 15.03.2016 | [2018/29] | WO2016JP58082 | Priority number, date | JP20150178516 | 10.09.2015 Original published format: JP 2015178516 | [2018/29] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017043112 | Date: | 16.03.2017 | Language: | JA | [2017/11] | Type: | A1 Application with search report | No.: | EP3348715 | Date: | 18.07.2018 | Language: | EN | [2018/29] | Type: | B1 Patent specification | No.: | EP3348715 | Date: | 06.05.2020 | Language: | EN | [2020/19] | Search report(s) | International search report - published on: | JP | 16.03.2017 | (Supplementary) European search report - dispatched on: | EP | 28.03.2019 | Classification | IPC: | E02F9/20, E02F9/22, E02F3/43 | [2019/18] | CPC: |
E02F3/437 (EP,US);
E02F9/2037 (KR);
E02F9/2203 (EP,US);
E02F3/435 (US);
E02F9/2004 (US);
E02F9/2025 (US);
E02F9/2029 (EP,US);
E02F9/2041 (KR);
E02F9/2271 (US);
E02F3/32 (EP,US)
(-)
|
Former IPC [2018/29] | E02F9/20, E02F9/22 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/29] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BAUMASCHINE | [2018/29] | English: | CONSTRUCTION MACHINE | [2018/29] | French: | ENGIN DE CHANTIER | [2018/29] | Entry into regional phase | 07.02.2018 | Translation filed | 28.03.2018 | National basic fee paid | 28.03.2018 | Search fee paid | 28.03.2018 | Designation fee(s) paid | 28.03.2018 | Examination fee paid | Examination procedure | 07.02.2018 | Date on which the examining division has become responsible | 28.03.2018 | Examination requested [2018/29] | 16.09.2019 | Amendment by applicant (claims and/or description) | 18.11.2019 | Communication of intention to grant the patent | 26.03.2020 | Receipt of the translation of the claim(s) | 30.03.2020 | Fee for grant paid | 30.03.2020 | Fee for publishing/printing paid | Opposition(s) | 09.02.2021 | No opposition filed within time limit [2021/15] | Fees paid | Renewal fee | 10.04.2018 | Renewal fee patent year 03 | 01.04.2019 | Renewal fee patent year 04 | 31.03.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.03.2016 | AL | 06.05.2020 | AT | 06.05.2020 | CY | 06.05.2020 | CZ | 06.05.2020 | DK | 06.05.2020 | EE | 06.05.2020 | ES | 06.05.2020 | FI | 06.05.2020 | HR | 06.05.2020 | IT | 06.05.2020 | LT | 06.05.2020 | LV | 06.05.2020 | MC | 06.05.2020 | MK | 06.05.2020 | NL | 06.05.2020 | PL | 06.05.2020 | RO | 06.05.2020 | RS | 06.05.2020 | SE | 06.05.2020 | SI | 06.05.2020 | SK | 06.05.2020 | SM | 06.05.2020 | BG | 06.08.2020 | NO | 06.08.2020 | GR | 07.08.2020 | IS | 06.09.2020 | PT | 07.09.2020 | [2024/22] |
Former [2023/33] | HU | 15.03.2016 | |
AL | 06.05.2020 | ||
AT | 06.05.2020 | ||
CY | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2023/30] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CY | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/45] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/24] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/10] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/09] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/08] | AL | 06.05.2020 | |
DK | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/04] | AL | 06.05.2020 | |
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/01] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/51] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/50] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/48] | FI | 06.05.2020 | |
LT | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/47] | LT | 06.05.2020 | |
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
Former [2020/46] | IS | 06.09.2020 | Documents cited: | Search | [A]JPH11210015 (HITACHI CONSTRUCTION MACHINERY) [A] 1-6* abstract *; | [A]EP0979901 (HITACHI CONSTRUCTION MACHINERY [JP]) [A] 1-6 * paragraph [0084] - paragraph [0085]; figure 15 * * abstract *; | [AD]JP2005320846 (HITACHI CONSTRUCTION MACHINERY) [AD] 1-6 * the whole document *; | [A]WO2014097689 (SUMITOMO SHI CONSTR MACH CO [JP]) [A] 1-6 * abstract * | International search | [A]JPH0988112 (HITACHI CONSTRUCTION MACHINERY) [A] 1-6 * , paragraphs [0029] to [0033]; fig. 5 to 6 (Family: none) *; | [A]JPH10317417 (HITACHI CONSTRUCTION MACHINERY) [A] 1-6 * , paragraphs [0055] to [0070]; fig. 11 to 14 (Family: none) *; | [A]JP2005320846 (HITACHI CONSTRUCTION MACHINERY) [A] 1-6 * , paragraphs [0007] to [0032]; fig. 1 to 14 (Family: none) *; | [A]JP2006144349 (HITACHI CONSTRUCTION MACHINERY) [A] 1-6 * , entire text; all drawings (Family: none) *; | [A]JP2007303128 (HITACHI CONSTRUCTION MACHINERY) [A] 1-6* , entire text; all drawings (Family: none) * |