blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3348715

EP3348715 - CONSTRUCTION MACHINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.03.2021
Database last updated on 12.08.2024
FormerThe patent has been granted
Status updated on  03.04.2020
FormerGrant of patent is intended
Status updated on  17.11.2019
FormerRequest for examination was made
Status updated on  15.06.2018
FormerThe international publication has been made
Status updated on  21.03.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Hitachi Construction Machinery Co., Ltd.
16-1, Higashiueno 2-chome
Taito-ku
Tokyo 110-0015 / JP
[2018/29]
Inventor(s)01 / TSUCHIE, Yoshiyuki
c/o HITACHI, LTD.
6-6 Marunouchi 1-chome
Chiyoda-ku
Tokyo 100-8280 / JP
02 / SAKAMOTO, Hiroshi
c/o TSUCHIURA WORKS
HITACHI CONSTRUCTION MACHINERY CO., LTD.
650 Kandatsumachi
Tsuchiura-shi Ibaraki 300-0013 / JP
03 / MORIKI, Hidekazu
c/o HITACHI, LTD.
6-6 Marunouchi 1-chome
Chiyoda-ku
Tokyo 100-8280 / JP
04 / TSURUGA, Yasutaka
c/o TSUCHIURA WORKS
HITACHI CONSTRUCTION MACHINERY CO., LTD.
650 Kandatsumachi
Tsuchiura-shi Ibaraki 300-0013 / JP
 [2018/29]
Representative(s)MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB
Paul-Heyse-Strasse 29
80336 München / DE
[2018/29]
Application number, filing date16843978.415.03.2016
[2018/29]
WO2016JP58082
Priority number, dateJP2015017851610.09.2015         Original published format: JP 2015178516
[2018/29]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017043112
Date:16.03.2017
Language:JA
[2017/11]
Type: A1 Application with search report 
No.:EP3348715
Date:18.07.2018
Language:EN
[2018/29]
Type: B1 Patent specification 
No.:EP3348715
Date:06.05.2020
Language:EN
[2020/19]
Search report(s)International search report - published on:JP16.03.2017
(Supplementary) European search report - dispatched on:EP28.03.2019
ClassificationIPC:E02F9/20, E02F9/22, E02F3/43
[2019/18]
CPC:
E02F3/437 (EP,US); E02F9/2037 (KR); E02F9/2203 (EP,US);
E02F3/435 (US); E02F9/2004 (US); E02F9/2025 (US);
E02F9/2029 (EP,US); E02F9/2041 (KR); E02F9/2271 (US);
E02F3/32 (EP,US) (-)
Former IPC [2018/29]E02F9/20, E02F9/22
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/29]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:BAUMASCHINE[2018/29]
English:CONSTRUCTION MACHINE[2018/29]
French:ENGIN DE CHANTIER[2018/29]
Entry into regional phase07.02.2018Translation filed 
28.03.2018National basic fee paid 
28.03.2018Search fee paid 
28.03.2018Designation fee(s) paid 
28.03.2018Examination fee paid 
Examination procedure07.02.2018Date on which the examining division has become responsible
28.03.2018Examination requested  [2018/29]
16.09.2019Amendment by applicant (claims and/or description)
18.11.2019Communication of intention to grant the patent
26.03.2020Receipt of the translation of the claim(s)
30.03.2020Fee for grant paid
30.03.2020Fee for publishing/printing paid
Opposition(s)09.02.2021No opposition filed within time limit [2021/15]
Fees paidRenewal fee
10.04.2018Renewal fee patent year 03
01.04.2019Renewal fee patent year 04
31.03.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.03.2016
AL06.05.2020
AT06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
MK06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
[2024/22]
Former [2023/33]HU15.03.2016
AL06.05.2020
AT06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2023/30]AL06.05.2020
AT06.05.2020
CY06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/45]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
MC06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/24]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SI06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/10]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
PL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SK06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/09]AL06.05.2020
AT06.05.2020
CZ06.05.2020
DK06.05.2020
EE06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
IT06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/08]AL06.05.2020
DK06.05.2020
ES06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RO06.05.2020
RS06.05.2020
SE06.05.2020
SM06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/04]AL06.05.2020
FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
NL06.05.2020
RS06.05.2020
SE06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2021/01]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
RS06.05.2020
SE06.05.2020
BG06.08.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/51]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
RS06.05.2020
SE06.05.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/50]FI06.05.2020
HR06.05.2020
LT06.05.2020
LV06.05.2020
SE06.05.2020
NO06.08.2020
GR07.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/48]FI06.05.2020
LT06.05.2020
SE06.05.2020
NO06.08.2020
IS06.09.2020
PT07.09.2020
Former [2020/47]LT06.05.2020
NO06.08.2020
IS06.09.2020
Former [2020/46]IS06.09.2020
Documents cited:Search[A]JPH11210015  (HITACHI CONSTRUCTION MACHINERY) [A] 1-6* abstract *;
 [A]EP0979901  (HITACHI CONSTRUCTION MACHINERY [JP]) [A] 1-6 * paragraph [0084] - paragraph [0085]; figure 15 * * abstract *;
 [AD]JP2005320846  (HITACHI CONSTRUCTION MACHINERY) [AD] 1-6 * the whole document *;
 [A]WO2014097689  (SUMITOMO SHI CONSTR MACH CO [JP]) [A] 1-6 * abstract *
International search[A]JPH0988112  (HITACHI CONSTRUCTION MACHINERY) [A] 1-6 * , paragraphs [0029] to [0033]; fig. 5 to 6 (Family: none) *;
 [A]JPH10317417  (HITACHI CONSTRUCTION MACHINERY) [A] 1-6 * , paragraphs [0055] to [0070]; fig. 11 to 14 (Family: none) *;
 [A]JP2005320846  (HITACHI CONSTRUCTION MACHINERY) [A] 1-6 * , paragraphs [0007] to [0032]; fig. 1 to 14 (Family: none) *;
 [A]JP2006144349  (HITACHI CONSTRUCTION MACHINERY) [A] 1-6 * , entire text; all drawings (Family: none) *;
 [A]JP2007303128  (HITACHI CONSTRUCTION MACHINERY) [A] 1-6* , entire text; all drawings (Family: none) *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.