EP3358615 - SILICON NITRIDE CIRCUIT BOARD AND SEMICONDUCTOR MODULE USING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.10.2022 Database last updated on 09.07.2024 | |
Former | The patent has been granted Status updated on 12.11.2021 | ||
Former | Grant of patent is intended Status updated on 31.05.2021 | ||
Former | Examination is in progress Status updated on 16.10.2020 | ||
Former | Request for examination was made Status updated on 06.07.2018 | ||
Former | The international publication has been made Status updated on 08.04.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Kabushiki Kaisha Toshiba 1-1 Shibaura 1-chome Minato-ku Tokyo 105-8001 / JP | For all designated states Toshiba Materials Co., Ltd. 8, Shinsugita-cho Isogo-ku Yokohama-shi, Kanagawa 235-8522 / JP | [2018/32] | Inventor(s) | 01 /
KATO, Hiromasa c/o TOSHIBA MATERIALS CO. LTD. 8 Shinsugita-Cho Isogo-Ku Yokohama-Shi Kanagawa 235-8522 / JP | 02 /
KITAMORI, Noboru c/o TOSHIBA MATERIALS CO. LTD. 8 Shinsugita-Cho Isogo-Ku Yokohama-Shi Kanagawa 235-8522 / JP | [2018/32] | Representative(s) | Henkel & Partner mbB Patentanwaltskanzlei, Rechtsanwaltskanzlei Maximiliansplatz 21 80333 München / DE | [2021/50] |
Former [2018/32] | Henkel, Breuer & Partner Patentanwälte Maximiliansplatz 21 80333 München / DE | Application number, filing date | 16850843.0 | 27.07.2016 | [2018/32] | WO2016JP72026 | Priority number, date | JP20150189991 | 28.09.2015 Original published format: JP 2015189991 | [2018/32] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017056666 | Date: | 06.04.2017 | Language: | JA | [2017/14] | Type: | A1 Application with search report | No.: | EP3358615 | Date: | 08.08.2018 | Language: | EN | [2018/32] | Type: | B1 Patent specification | No.: | EP3358615 | Date: | 15.12.2021 | Language: | EN | [2021/50] | Search report(s) | International search report - published on: | JP | 06.04.2017 | (Supplementary) European search report - dispatched on: | EP | 15.04.2019 | Classification | IPC: | H01L23/36, H05K1/02, H01L23/373, C04B37/02, H01L23/15, // H05K1/03 | [2019/20] | CPC: |
H01L23/3735 (EP,US);
C04B35/584 (US);
C04B37/025 (US);
C04B37/026 (EP,US);
H01L23/13 (US);
H01L23/15 (EP,US);
H01L23/36 (US);
H01L23/49861 (US);
H05K1/02 (US);
H05K1/0306 (EP,US);
H05K3/0011 (US);
C04B2235/6581 (EP);
C04B2235/96 (EP,US);
C04B2235/9607 (EP,US);
C04B2235/9638 (EP);
C04B2237/125 (EP,US);
C04B2237/127 (EP,US);
C04B2237/368 (EP,US);
C04B2237/704 (EP);
C04B2237/706 (EP,US);
C04B2237/708 (EP,US);
C04B2237/88 (EP,US);
H01L2924/15159 (EP);
H05K1/0271 (EP,US);
|
Former IPC [2018/32] | H01L23/13, H01L23/12, H01L23/36, H05K1/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SILIZIUMNITRIDSCHALTPLATINE UND HALBLEITERMODUL DAMIT | [2021/22] | English: | SILICON NITRIDE CIRCUIT BOARD AND SEMICONDUCTOR MODULE USING SAME | [2018/32] | French: | CARTE DE CIRCUIT IMPRIMÉ DE NITRURE DE SILICIUM ET MODULE SEMI-CONDUCTEUR L'UTILISANT | [2018/32] |
Former [2018/32] | SILICIUMNITRIDSCHALTPLATINE UND HALBLEITERMODUL DAMIT | Entry into regional phase | 09.08.2017 | Translation filed | 09.08.2017 | National basic fee paid | 09.08.2017 | Search fee paid | 09.08.2017 | Designation fee(s) paid | 09.08.2017 | Examination fee paid | Examination procedure | 09.08.2017 | Examination requested [2018/32] | 09.08.2017 | Date on which the examining division has become responsible | 13.11.2019 | Amendment by applicant (claims and/or description) | 16.10.2020 | Despatch of a communication from the examining division (Time limit: M04) | 26.02.2021 | Reply to a communication from the examining division | 01.06.2021 | Communication of intention to grant the patent | 11.10.2021 | Fee for grant paid | 11.10.2021 | Fee for publishing/printing paid | 11.10.2021 | Receipt of the translation of the claim(s) | 03.11.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | Opposition(s) | 16.09.2022 | No opposition filed within time limit [2022/47] | Request for further processing for: | 04.11.2021 | Request for further processing filed | 04.11.2021 | Full payment received (date of receipt of payment) Request granted | 15.11.2021 | Decision despatched | Fees paid | Renewal fee | 11.07.2018 | Renewal fee patent year 03 | 15.07.2019 | Renewal fee patent year 04 | 14.07.2020 | Renewal fee patent year 05 | 15.07.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.07.2016 | AL | 15.12.2021 | AT | 15.12.2021 | CY | 15.12.2021 | CZ | 15.12.2021 | DK | 15.12.2021 | EE | 15.12.2021 | ES | 15.12.2021 | FI | 15.12.2021 | HR | 15.12.2021 | IT | 15.12.2021 | LT | 15.12.2021 | LV | 15.12.2021 | MC | 15.12.2021 | MK | 15.12.2021 | NL | 15.12.2021 | PL | 15.12.2021 | RS | 15.12.2021 | SE | 15.12.2021 | SI | 15.12.2021 | SK | 15.12.2021 | SM | 15.12.2021 | BG | 15.03.2022 | NO | 15.03.2022 | GR | 16.03.2022 | IS | 15.04.2022 | PT | 18.04.2022 | IE | 27.07.2022 | LU | 27.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | [2024/22] |
Former [2024/20] | HU | 27.07.2016 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CY | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
IE | 27.07.2022 | ||
LU | 27.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2024/18] | HU | 27.07.2016 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
IE | 27.07.2022 | ||
LU | 27.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/33] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
IE | 27.07.2022 | ||
LU | 27.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/25] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
LU | 27.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/21] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
LU | 27.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
Former [2023/11] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2023/01] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/49] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/46] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/42] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/36] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/35] | CZ | 15.12.2021 | |
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/34] | EE | 15.12.2021 | |
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/33] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/30] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/25] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/24] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/22] | FI | 15.12.2021 | |
LT | 15.12.2021 | ||
RS | 15.12.2021 | ||
BG | 15.03.2022 | ||
Former [2022/21] | RS | 15.12.2021 | |
BG | 15.03.2022 | ||
Former [2022/19] | BG | 15.03.2022 | Documents cited: | Search | [Y]JPH10190176 (DENKI KAGAKU KOGYO KK) [Y] 1,2,5,7-9 * abstract * * figure - *; | [Y]JP2006245437 (HITACHI METALS LTD) [Y] 1-6,9-12 * abstract * * figure - *; | [XY]JP2012023404 (HITACHI METALS LTD) [X] 1-6,9,10,12 * figure - * [Y] 7,8,11,13-15; | [Y]EP2480052 (TOSHIBA KK [JP], et al) [Y] 7 * figure - ** paragraph [0019] - paragraph [0020] *; | [Y]US2014291699 (YANO KEIICHI [JP], et al) [Y] 1-15 * figure - * * paragraph [0008] * * paragraph [0015] - paragraph [0042] * | International search | [Y]JP2000200865 (SHIBAFU ENGINEERING KK, et al) [Y] 5, 10-12 * , claims 1, 2; paragraphs [0037] to [0044]; fig. 1 (Family: none) *; | [XY]JP2003309210 (HITACHI METALS LTD, et al) [X] 1-5, 9-12 * , paragraphs [0013] to [0035]; fig. 1 (Family: none) * [Y] 6-8, 13-15; | [Y]JP2004311685 (FUJI ELECTRIC HOLDINGS) [Y] 13-15* , paragraphs [0005] to [0006]; fig. 4 (Family: none) *; | [Y]JP2007230791 (KYOCERA CORP) [Y] 6, 13-15 * , paragraph [0063] (Family: none) *; | [XY]JP2013042165 (HITACHI METALS LTD) [X] 1-4, 9 * , paragraphs [0018] to [0058]; fig. 1 & US 2009/0101392 A1 paragraphs [0047] to [0086]; fig. 1 & JP 2012-169678 A & JP 5326278 B & WO 2007/026547 A1 & EP 1921675 A1 * [Y] 5-8, 10-15; | [Y]WO2013094213 (TOSHIBA KK [JP], et al) [Y] 7, 8 * , claims 1, 2; fig. 1, 2 & US 2014/0291699 A1 claims 1, 2; fig. 1, 2 & CN 104011852 A & KR 10-2014-0112029 A * |