EP3361799 - DUAL-CONNECTIVITY-RELATED DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.05.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 29.05.2020 | ||
Former | Grant of patent is intended Status updated on 30.01.2020 | ||
Former | Request for examination was made Status updated on 13.07.2018 | ||
Former | The international publication has been made Status updated on 18.04.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states NEC Corporation 7-1, Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2018/33] | Inventor(s) | 01 /
HAYASHI, Sadafuku c/o NEC CORPORATION 7-1 Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2018/33] | Representative(s) | MacDougall, Alan John Shaw, et al Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [N/P] |
Former [2018/33] | MacDougall, Alan John Shaw, et al Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | Application number, filing date | 16853471.7 | 28.09.2016 | [2018/33] | WO2016JP78649 | Priority number, date | JP20150198287 | 06.10.2015 Original published format: JP 2015198287 | [2018/33] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017061317 | Date: | 13.04.2017 | Language: | JA | [2017/15] | Type: | A1 Application with search report | No.: | EP3361799 | Date: | 15.08.2018 | Language: | EN | [2018/33] | Type: | B1 Patent specification | No.: | EP3361799 | Date: | 01.07.2020 | Language: | EN | [2020/27] | Search report(s) | International search report - published on: | JP | 13.04.2017 | (Supplementary) European search report - dispatched on: | EP | 27.03.2019 | Classification | IPC: | H04W76/34, H04L5/00, // H04W92/20 | [2020/09] | CPC: |
H04L5/001 (EP,US);
H04W76/30 (KR,US);
H04W76/15 (KR,US);
H04W16/32 (KR,US);
H04W76/34 (EP,US);
H04W88/06 (US);
H04W92/20 (EP,US)
(-)
|
Former IPC [2019/17] | H04W76/34, // H04W92/20 | ||
Former IPC [2018/33] | H04W72/04, H04W16/32, H04W76/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/33] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VORRICHTUNG IM ZUSAMMENHANG MIT DUALANSCHLUSS | [2018/33] | English: | DUAL-CONNECTIVITY-RELATED DEVICE | [2018/33] | French: | DISPOSITIF ASSOCIÉ À UNE CONNECTIVITÉ DOUBLE | [2018/33] | Entry into regional phase | 29.03.2018 | Translation filed | 29.03.2018 | National basic fee paid | 29.03.2018 | Search fee paid | 29.03.2018 | Designation fee(s) paid | 29.03.2018 | Examination fee paid | Examination procedure | 29.03.2018 | Examination requested [2018/33] | 29.03.2018 | Date on which the examining division has become responsible | 27.09.2019 | Amendment by applicant (claims and/or description) | 31.01.2020 | Communication of intention to grant the patent | 22.05.2020 | Fee for grant paid | 22.05.2020 | Fee for publishing/printing paid | 22.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 06.04.2021 | No opposition filed within time limit [2021/23] | Fees paid | Renewal fee | 27.09.2018 | Renewal fee patent year 03 | 13.09.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.09.2016 | AL | 01.07.2020 | AT | 01.07.2020 | CY | 01.07.2020 | CZ | 01.07.2020 | DK | 01.07.2020 | EE | 01.07.2020 | ES | 01.07.2020 | FI | 01.07.2020 | HR | 01.07.2020 | IT | 01.07.2020 | LT | 01.07.2020 | LV | 01.07.2020 | MC | 01.07.2020 | MK | 01.07.2020 | MT | 01.07.2020 | NL | 01.07.2020 | PL | 01.07.2020 | RO | 01.07.2020 | RS | 01.07.2020 | SE | 01.07.2020 | SI | 01.07.2020 | SK | 01.07.2020 | SM | 01.07.2020 | TR | 01.07.2020 | IE | 28.09.2020 | LU | 28.09.2020 | BE | 30.09.2020 | CH | 30.09.2020 | FR | 30.09.2020 | LI | 30.09.2020 | BG | 01.10.2020 | NO | 01.10.2020 | GR | 02.10.2020 | IS | 01.11.2020 | PT | 02.11.2020 | DE | 01.04.2021 | [2022/32] |
Former [2022/28] | HU | 28.09.2016 | |
AL | 01.07.2020 | ||
AT | 01.07.2020 | ||
CY | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
MT | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
TR | 01.07.2020 | ||
IE | 28.09.2020 | ||
LU | 28.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
FR | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
DE | 01.04.2021 | ||
Former [2022/27] | HU | 28.09.2016 | |
AL | 01.07.2020 | ||
AT | 01.07.2020 | ||
CY | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MT | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
TR | 01.07.2020 | ||
IE | 28.09.2020 | ||
LU | 28.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
FR | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
DE | 01.04.2021 | ||
Former [2021/37] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
IE | 28.09.2020 | ||
LU | 28.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
FR | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
DE | 01.04.2021 | ||
Former [2021/36] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 28.09.2020 | ||
BE | 30.09.2020 | ||
FR | 30.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
DE | 01.04.2021 | ||
Former [2021/35] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 28.09.2020 | ||
FR | 30.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
DE | 01.04.2021 | ||
Former [2021/28] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 28.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/27] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 28.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/25] | AL | 01.07.2020 | |
AT | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/22] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/20] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/17] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/11] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
PL | 01.07.2020 | ||
RS | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/09] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/08] | ES | 01.07.2020 | |
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/07] | FI | 01.07.2020 | |
LT | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
Former [2021/01] | BG | 01.10.2020 | Documents cited: | Search | [XYI] - ERICSSON, "Completion of basic signalling flows", vol. RAN WG3, no. San Jose del Cabo, Mexico; 20140331 - 20140404, (20140330), 3GPP DRAFT; R3-140813, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN3/Docs/, (20140330), XP050795503 [X] 1,2,5,6,12-15 * section 2.3; pages 5-9 * * section 10.1.2.X (in section 2.4); pages 11-18 * [Y] 8-11 [I] 3,4,7 | [XYI] - ERICSSON, "Deriving X2AP and S1AP signalling elements", vol. RAN WG3, no. San Jose del Cabo, Mexico; 20140331 - 20140404, (20140330), 3GPP DRAFT; R3-140815, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN3/Docs/, (20140330), XP050795505 [X] 1,2,5,6,12-15 * section 1; page 1 * * section 20.2.2.x6 (in section 2); page 6 * [Y] 8-11 [I] 3,4,7 | [Y] - ALCATEL-LUCENT ET AL, "Need of a cause value for user inactivity in dual connectivity?", vol. RAN WG3, no. Athens, Greece; 20150209 - 20150213, (20150208), 3GPP DRAFT; R3-150202_USERINACTIVITY, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN3/Docs/, (20150208), XP050936955 [Y] 8-11 * section 2; pages 1, 2 * | [A] - NTT DOCOMO ET AL, "Introduction of Dual Connectivity", vol. RAN WG2, no. Prague, Czech Republic; 20140210 - 20140214, (20140222), 3GPP DRAFT; R2-140906_INTRODUCTION OF DUAL CONNECTIVITY_V8_CLEAN, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANC, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_85/Docs/, (20140222), XP050770936 [A] 1-15 * section 3.1; pages 4, 5 * * section 4.X; pages 9, 10 * * section 6.X; pages 15, 16 * * section 7.X; page 17 * * section 10.1.2.X; pages 25-27 * * Annex L; page 45 * | International search | [A]WO2015115573 (KYOCERA CORP [JP]) [A] 1-26, 41-49* , paragraphs [0242] to [0253] & US 2016/0219603 A1 paragraphs [0261] to [0272] *; | [A] - NOKIA NETWORKS et al., "SeNB initiated SCG Change procedure", 3GPP TSG-RAN WG3 Meeting #86 R3-142734, 3GPP, (20141117), XP050877871 [A] 1-26, 41-49 |