blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3361799

EP3361799 - DUAL-CONNECTIVITY-RELATED DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.05.2021
Database last updated on 14.06.2024
FormerThe patent has been granted
Status updated on  29.05.2020
FormerGrant of patent is intended
Status updated on  30.01.2020
FormerRequest for examination was made
Status updated on  13.07.2018
FormerThe international publication has been made
Status updated on  18.04.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
NEC Corporation
7-1, Shiba 5-chome Minato-ku
Tokyo 108-8001 / JP
[2018/33]
Inventor(s)01 / HAYASHI, Sadafuku
c/o NEC CORPORATION
7-1 Shiba 5-chome
Minato-ku
Tokyo 108-8001 / JP
 [2018/33]
Representative(s)MacDougall, Alan John Shaw, et al
Mathys & Squire The Shard
32 London Bridge Street
London SE1 9SG / GB
[N/P]
Former [2018/33]MacDougall, Alan John Shaw, et al
Mathys & Squire LLP The Shard
32 London Bridge Street
London SE1 9SG / GB
Application number, filing date16853471.728.09.2016
[2018/33]
WO2016JP78649
Priority number, dateJP2015019828706.10.2015         Original published format: JP 2015198287
[2018/33]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017061317
Date:13.04.2017
Language:JA
[2017/15]
Type: A1 Application with search report 
No.:EP3361799
Date:15.08.2018
Language:EN
[2018/33]
Type: B1 Patent specification 
No.:EP3361799
Date:01.07.2020
Language:EN
[2020/27]
Search report(s)International search report - published on:JP13.04.2017
(Supplementary) European search report - dispatched on:EP27.03.2019
ClassificationIPC:H04W76/34, H04L5/00, // H04W92/20
[2020/09]
CPC:
H04L5/001 (EP,US); H04W76/30 (KR,US); H04W76/15 (KR,US);
H04W16/32 (KR,US); H04W76/34 (EP,US); H04W88/06 (US);
H04W92/20 (EP,US) (-)
Former IPC [2019/17]H04W76/34, // H04W92/20
Former IPC [2018/33]H04W72/04, H04W16/32, H04W76/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/33]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VORRICHTUNG IM ZUSAMMENHANG MIT DUALANSCHLUSS[2018/33]
English:DUAL-CONNECTIVITY-RELATED DEVICE[2018/33]
French:DISPOSITIF ASSOCIÉ À UNE CONNECTIVITÉ DOUBLE[2018/33]
Entry into regional phase29.03.2018Translation filed 
29.03.2018National basic fee paid 
29.03.2018Search fee paid 
29.03.2018Designation fee(s) paid 
29.03.2018Examination fee paid 
Examination procedure29.03.2018Examination requested  [2018/33]
29.03.2018Date on which the examining division has become responsible
27.09.2019Amendment by applicant (claims and/or description)
31.01.2020Communication of intention to grant the patent
22.05.2020Fee for grant paid
22.05.2020Fee for publishing/printing paid
22.05.2020Receipt of the translation of the claim(s)
Opposition(s)06.04.2021No opposition filed within time limit [2021/23]
Fees paidRenewal fee
27.09.2018Renewal fee patent year 03
13.09.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.09.2016
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
MK01.07.2020
MT01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
IE28.09.2020
LU28.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
DE01.04.2021
[2022/32]
Former [2022/28]HU28.09.2016
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MC01.07.2020
MT01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
IE28.09.2020
LU28.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
DE01.04.2021
Former [2022/27]HU28.09.2016
AL01.07.2020
AT01.07.2020
CY01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
MT01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
TR01.07.2020
IE28.09.2020
LU28.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
DE01.04.2021
Former [2021/37]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
IE28.09.2020
LU28.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
DE01.04.2021
Former [2021/36]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SI01.07.2020
SK01.07.2020
SM01.07.2020
LU28.09.2020
BE30.09.2020
FR30.09.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
DE01.04.2021
Former [2021/35]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SK01.07.2020
SM01.07.2020
LU28.09.2020
FR30.09.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
DE01.04.2021
Former [2021/28]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SK01.07.2020
SM01.07.2020
LU28.09.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/27]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SM01.07.2020
LU28.09.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/25]AL01.07.2020
AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/22]AT01.07.2020
CZ01.07.2020
DK01.07.2020
EE01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
NL01.07.2020
PL01.07.2020
RO01.07.2020
RS01.07.2020
SE01.07.2020
SM01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/20]AT01.07.2020
CZ01.07.2020
DK01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
IT01.07.2020
LT01.07.2020
LV01.07.2020
NL01.07.2020
PL01.07.2020
RS01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/17]AT01.07.2020
CZ01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
NL01.07.2020
PL01.07.2020
RS01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/11]AT01.07.2020
CZ01.07.2020
ES01.07.2020
FI01.07.2020
HR01.07.2020
LT01.07.2020
LV01.07.2020
PL01.07.2020
RS01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
IS01.11.2020
PT02.11.2020
Former [2021/09]AT01.07.2020
CZ01.07.2020
ES01.07.2020
FI01.07.2020
LT01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
GR02.10.2020
PT02.11.2020
Former [2021/08]ES01.07.2020
FI01.07.2020
LT01.07.2020
SE01.07.2020
BG01.10.2020
NO01.10.2020
PT02.11.2020
Former [2021/07]FI01.07.2020
LT01.07.2020
BG01.10.2020
NO01.10.2020
Former [2021/01]BG01.10.2020
Documents cited:Search[XYI]  - ERICSSON, "Completion of basic signalling flows", vol. RAN WG3, no. San Jose del Cabo, Mexico; 20140331 - 20140404, (20140330), 3GPP DRAFT; R3-140813, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN3/Docs/, (20140330), XP050795503 [X] 1,2,5,6,12-15 * section 2.3; pages 5-9 * * section 10.1.2.X (in section 2.4); pages 11-18 * [Y] 8-11 [I] 3,4,7
 [XYI]  - ERICSSON, "Deriving X2AP and S1AP signalling elements", vol. RAN WG3, no. San Jose del Cabo, Mexico; 20140331 - 20140404, (20140330), 3GPP DRAFT; R3-140815, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN3/Docs/, (20140330), XP050795505 [X] 1,2,5,6,12-15 * section 1; page 1 * * section 20.2.2.x6 (in section 2); page 6 * [Y] 8-11 [I] 3,4,7
 [Y]  - ALCATEL-LUCENT ET AL, "Need of a cause value for user inactivity in dual connectivity?", vol. RAN WG3, no. Athens, Greece; 20150209 - 20150213, (20150208), 3GPP DRAFT; R3-150202_USERINACTIVITY, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN3/Docs/, (20150208), XP050936955 [Y] 8-11 * section 2; pages 1, 2 *
 [A]  - NTT DOCOMO ET AL, "Introduction of Dual Connectivity", vol. RAN WG2, no. Prague, Czech Republic; 20140210 - 20140214, (20140222), 3GPP DRAFT; R2-140906_INTRODUCTION OF DUAL CONNECTIVITY_V8_CLEAN, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANC, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_85/Docs/, (20140222), XP050770936 [A] 1-15 * section 3.1; pages 4, 5 * * section 4.X; pages 9, 10 * * section 6.X; pages 15, 16 * * section 7.X; page 17 * * section 10.1.2.X; pages 25-27 * * Annex L; page 45 *
International search[A]WO2015115573  (KYOCERA CORP [JP]) [A] 1-26, 41-49* , paragraphs [0242] to [0253] & US 2016/0219603 A1 paragraphs [0261] to [0272] *;
 [A]  - NOKIA NETWORKS et al., "SeNB initiated SCG Change procedure", 3GPP TSG-RAN WG3 Meeting #86 R3-142734, 3GPP, (20141117), XP050877871 [A] 1-26, 41-49
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.