blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3362148

EP3362148 - SYSTEM AND METHOD FOR MONITORING STRUCTURAL MOVEMENTS THROUGHOUT RADIATION THERAPY [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.08.2022
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  27.08.2021
FormerGrant of patent is intended
Status updated on  25.04.2021
FormerExamination is in progress
Status updated on  23.03.2021
FormerGrant of patent is intended
Status updated on  25.11.2020
FormerExamination is in progress
Status updated on  03.03.2020
FormerRequest for examination was made
Status updated on  20.07.2018
FormerThe international publication has been made
Status updated on  21.04.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Elekta Ltd.
2050 Bleury Street, Suite 200
Montreal, QC H3A 2J5 / CA
[2021/39]
Former [2018/34]For all designated states
Elekta Ltd.
2050 Bleury Street, Suite 200
Montreal, QC H3A 2J5 / CA
Inventor(s)01 / GAUTHIER, Jean-Francois
10771 Rue Clark
Montréal, Québec H3L 2S9 / CA
02 / BEAUDOIN, Pierre-Olivier
8226 Rue Drolet
Montréal, Québec H2P 2H5 / CA
03 / LALONDE, Marc-André
575 Avenue Inverness
Ville Mont-Royal, Ontario H3R 1C4 / CA
04 / LODU, Daniel
6060 Fernbank Road
Stittsville, Ontario K2S 1B6 / CA
05 / LOPES, Rui
1695 Rue Rio
Brossard, Québec J4X 2R4 / CA
06 / LACHAINE, Martin Emile
1051 Hotel-de-Ville
Apt. 2
Montréal, Québec H2X 3A7 / CA
 [2018/34]
Representative(s)Hamer, Thomas Daniel
Kilburn & Strode LLP
Lacon London
84 Theobalds Road
London WC1X 8NL / GB
[2021/39]
Former [2018/34]Finnegan Europe LLP
1 London Bridge
London SE1 9BG / GB
Application number, filing date16855044.014.10.2016
[2018/34]
WO2016IB56179
Priority number, dateUS20151488444115.10.2015         Original published format: US201514884441
[2018/34]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017064669
Date:20.04.2017
Language:EN
[2017/16]
Type: A1 Application with search report 
No.:EP3362148
Date:22.08.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 20.04.2017 takes the place of the publication of the European patent application.
[2018/34]
Type: B1 Patent specification 
No.:EP3362148
Date:29.09.2021
Language:EN
[2021/39]
Search report(s)International search report - published on:CA20.04.2017
(Supplementary) European search report - dispatched on:EP28.03.2019
ClassificationIPC:A61N5/10, A61B34/00, A61B5/103, A61B6/03, A61B8/00, A61B8/08
[2018/34]
CPC:
A61N5/1049 (EP,US); A61N5/1037 (US); A61N5/1039 (US);
A61N2005/1051 (US); A61N2005/1052 (US); A61N2005/1055 (US);
A61N2005/1058 (US); A61N2005/1059 (US); A61N2005/1061 (EP,US);
A61N2005/1074 (US); A61N2005/1091 (US); A61N5/1067 (EP,US);
A61N5/107 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/34]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:SYSTEM UND VERFAHREN ZUR ÜBERWACHUNG VON STRUKTURELLEN BEWEGUNGEN WÄHREND EINER STRAHLUNGSTHERAPIE[2018/34]
English:SYSTEM AND METHOD FOR MONITORING STRUCTURAL MOVEMENTS THROUGHOUT RADIATION THERAPY[2018/34]
French:SYSTÈME ET PROCÉDÉ DE SURVEILLANCE DE MOUVEMENTS DE STRUCTURE TOUT AU LONG D'UNE RADIOTHÉRAPIE[2018/34]
Entry into regional phase08.05.2018National basic fee paid 
08.05.2018Search fee paid 
08.05.2018Designation fee(s) paid 
08.05.2018Examination fee paid 
Examination procedure08.05.2018Examination requested  [2018/34]
08.05.2018Date on which the examining division has become responsible
28.10.2019Amendment by applicant (claims and/or description)
06.03.2020Despatch of a communication from the examining division (Time limit: M04)
06.07.2020Reply to a communication from the examining division
26.11.2020Communication of intention to grant the patent
22.03.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
26.04.2021Communication of intention to grant the patent
17.08.2021Fee for grant paid
17.08.2021Fee for publishing/printing paid
17.08.2021Receipt of the translation of the claim(s)
Opposition(s)30.06.2022No opposition filed within time limit [2022/36]
Fees paidRenewal fee
29.10.2018Renewal fee patent year 03
28.10.2019Renewal fee patent year 04
14.10.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU14.10.2016
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
MK29.09.2021
MT29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
[2024/41]
Former [2024/22]HU14.10.2016
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
MK29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/33]HU14.10.2016
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
SM29.09.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/30]HU14.10.2016
AL29.09.2021
AT29.09.2021
CY29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/29]HU14.10.2016
AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/10]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
IT29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2023/01]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SI29.09.2021
SK29.09.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/48]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
IE14.10.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/37]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
LU14.10.2021
BE31.10.2021
CH31.10.2021
LI31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/35]AL29.09.2021
AT29.09.2021
CZ29.09.2021
DK29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
LU14.10.2021
BE31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/33]AL29.09.2021
AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
MC29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BE31.10.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/29]AL29.09.2021
AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/24]AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
NL29.09.2021
PL29.09.2021
RO29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
IS29.01.2022
PT31.01.2022
Former [2022/23]AT29.09.2021
CZ29.09.2021
EE29.09.2021
ES29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
PL29.09.2021
RS29.09.2021
SE29.09.2021
SK29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
PT31.01.2022
Former [2022/21]AT29.09.2021
FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
Former [2022/10]FI29.09.2021
HR29.09.2021
LT29.09.2021
LV29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
GR30.12.2021
Former [2022/09]FI29.09.2021
LT29.09.2021
RS29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
Former [2022/08]FI29.09.2021
LT29.09.2021
SE29.09.2021
BG29.12.2021
NO29.12.2021
Former [2022/07]LT29.09.2021
NO29.12.2021
Documents cited:Search   [ ] - No further relevant documents disclosed
International search[X]WO2013107472  (ELEKTA AB [SE], et al) [X] 1-20 * Abstract; page 1, lines 25-26; page 3, lines 12-17; page 4, line 22 - page 5, line 16; page 6, lines 3-4 and 27-28; page 8, lines 1-2 and 20-26 and page 9, line 4 *;
 [A]US8155729  (HSIEH JIANG [US], et al) [A] 1-20 * The whole document *;
 [A]US2015010126  (ROTONDO GIUSEPPE [IT], et al) [A] 1-20 * The whole document *;
 [A]US8130907  (MAURER JR CALVIN R [US], et al) [A] 1-20 * The whole document *;
 [A]US2011286642  (NORD JANNE [FI], et al) [A] 1-20 * The whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.