blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3387736

EP3387736 - SYSTEMS AND METHODS FOR INTEGRATED MICROGRID MANAGEMENT SYSTEM IN ELECTRIC POWER SYSTEMS [Right-click to bookmark this link]
StatusThe application has been refused
Status updated on  07.04.2023
Database last updated on 07.10.2024
FormerExamination is in progress
Status updated on  30.10.2020
FormerRequest for examination was made
Status updated on  14.09.2018
FormerThe international publication has been made
Status updated on  16.06.2017
Most recent event   Tooltip07.04.2023Refusal of applicationpublished on 10.05.2023  [2023/19]
Applicant(s)For all designated states
Opus One Solutions Energy Corp.
50 West Pearce St.
Unit 16
Richmond Hill, Ontario L4B 1C5 / CA
[2018/42]
Inventor(s)01 / WONG, Joshua
Unit 305
18 Rean Drive
Toronto Ontario M2K 0C7 / CA
02 / TAI, Cedric
Unit 2701
38 Grenville St.
Toronto Ontario M4Y 1A5 / CA
03 / IRAVANI, Reza
Dermott Place
Toronto Ontario M3A 3B5 / CA
04 / GRAOVAC, Milan
41 Sylvan Valleyway
Toronto Ontario M5M 4M4 / CA
05 / WANG, Xiaolin
1143 Dufferin Street
Toronto Ontario M6H 4B7 / CA
06 / HARISUTHAN, Subramaniam
845 Manning Avenue
Toronto Ontario M6G 2X1 / CA
 [2018/42]
Representative(s)Simmons & Simmons
City Point
One Ropemaker Street
London EC2Y 9SS / GB
[N/P]
Former [2018/42]Cordina, Kevin John
Simmons & Simmons LLP
CityPoint
One Ropemaker Street
London EC2Y 9SS / GB
Application number, filing date16871866.607.12.2016
[2018/42]
WO2016CA51436
Priority number, dateUS20151496132607.12.2015         Original published format: US201514961326
[2018/42]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017096477
Date:15.06.2017
Language:EN
[2017/24]
Type: A1 Application with search report 
No.:EP3387736
Date:17.10.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 15.06.2017 takes the place of the publication of the European patent application.
[2018/42]
Search report(s)International search report - published on:CA15.06.2017
(Supplementary) European search report - dispatched on:EP13.11.2018
ClassificationIPC:H02J13/00, G05B19/042, H04L12/28
[2018/42]
CPC:
G05B19/042 (EP,US); G05B2219/2639 (EP,US); Y02B70/30 (US);
Y04S20/20 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/42]
TitleGerman:SYSTEME UND VERFAHREN FÜR INTEGRIERTES MIKRONETZMANAGEMENTSYSTEM IN ELEKTRISCHEN ENERGIESYSTEMEN[2018/42]
English:SYSTEMS AND METHODS FOR INTEGRATED MICROGRID MANAGEMENT SYSTEM IN ELECTRIC POWER SYSTEMS[2018/42]
French:SYSTÈMES ET PROCÉDÉS POUR UN SYSTÈME DE GESTION DE MICRO-RÉSEAU INTÉGRÉ DANS DES SYSTÈMES ÉLECTRIQUES[2018/42]
Entry into regional phase06.06.2018National basic fee paid 
06.06.2018Search fee paid 
06.06.2018Designation fee(s) paid 
06.06.2018Examination fee paid 
Examination procedure06.06.2018Examination requested  [2018/42]
06.06.2018Date on which the examining division has become responsible
27.09.2019Amendment by applicant (claims and/or description)
30.10.2020Despatch of a communication from the examining division (Time limit: M06)
02.06.2021Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
05.08.2021Reply to a communication from the examining division
17.11.2022Application refused, date of legal effect [2023/19]
17.11.2022Date of oral proceedings
22.12.2022Despatch of communication that the application is refused, reason: substantive examination [2023/19]
23.12.2022Minutes of oral proceedings despatched
Divisional application(s)EP23157923.6
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
05.08.2021Request for further processing filed
05.08.2021Full payment received (date of receipt of payment)
Request granted
16.08.2021Decision despatched
The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
27.09.2019Request for further processing filed
27.09.2019Full payment received (date of receipt of payment)
Request granted
07.10.2019Decision despatched
The application is deemed to be withdrawn due to failure to indicate the wish to proceed further with the application
27.09.2019Request for further processing filed
27.09.2019Full payment received (date of receipt of payment)
Request granted
15.10.2019Decision despatched
Fees paidRenewal fee
12.12.2018Renewal fee patent year 03
13.12.2019Renewal fee patent year 04
14.12.2020Renewal fee patent year 05
10.11.2021Renewal fee patent year 06
13.10.2022Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XI]  - JOHANNES SCHIFFER ET AL, "Modeling of microgrids - from fundamental physics to phasors and voltage sources", ARXIV.ORG, CORNELL UNIVERSITY LIBRARY, 201 OLIN LIBRARY CORNELL UNIVERSITY ITHACA, NY 14853, (20150501), XP080802206 [X] 1 * the whole document * [I] 2-15
International search[A]WO2013015773  (PETRA SOLAR INC [US], et al) [A] 1-113* -see abstract; -see figs. 1, 4-6, 15; -see whole document. *;
 [A]US2013041516  (ROCKENFELLER UWE [US], et al) [A] 1-113 * -see abstract; -see figs. 1-7; -see whole document. *;
 [Y]US8649914  (MILLER LANDON CABELL GARLAND [US], et al) [Y] 1-113 * -see abstract; -see figs. 1-15; -see whole document. *;
 [XY]US8682495  (CARRALERO MICHAEL A [US], et al) [X] 1-113 * -see abstract; -see col. 2, line 35 through col. 15,21; -see figs. 1-6 * [Y] 0;
 [Y]US2014252855  (WATANABE TOHRU [JP], et al) [Y] 1-113 * -see abstract; sections [0091-0101]; -see figs. 1-5, 7 & 9; -see whole document. *;
 [A]US2014297051  (ZHANG HUAGUANG [CN], et al) [A] 1-113 * -see abstract; -see figs. 1-8, 10-12; -see whole document. *;
 [A]US2014300182  (JAMES HARRY K [US]) [A] 1-113 * -see abstract; -see figs. 1-2; -see whole document. *;
 [Y]  - PRAIS et al., "A Topology Processor That Tracks Network Modifications Over Time'';", IEEE Transactions on Power Systems, (19880800), vol. 3, no. 3, pages 992 - 998, XP055389504 [Y] 1-113 * . -see abstract; -see figs. 1-4. *
by applicantWO2013015773
    - SCHIFFER, Modeling of microgrids-from fundamental physics to phasors and voltage sources
    - SANSEVERINO, Optimal power flow in three-phase islanded microgrids with inverter interfaced units
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.