EP3386611 - METHOD AND SYSTEM FOR REMOVING IMPURITIES FROM A GAS [Right-click to bookmark this link] | |||
Former [2018/42] | SILOXANE REMOVAL SYSTEM AND MEDIA REGENERATION METHODS | ||
[2021/02] | Status | No opposition filed within time limit Status updated on 22.07.2022 Database last updated on 30.07.2024 | |
Former | The patent has been granted Status updated on 13.08.2021 | ||
Former | Grant of patent is intended Status updated on 05.04.2021 | ||
Former | Examination is in progress Status updated on 22.02.2021 | ||
Former | Grant of patent is intended Status updated on 17.01.2021 | ||
Former | Examination is in progress Status updated on 16.05.2020 | ||
Former | Request for examination was made Status updated on 14.09.2018 | ||
Former | The international publication has been made Status updated on 16.06.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Granitefuel Engineering Inc. 241 Bradwick Drive Concord, ON L4K 1K5 / CA | [2021/37] |
Former [2018/42] | For all designated states Granitefuel Engineering Inc. 241 Bradwick Drive Concord, ON L4K 1K5 / CA | Inventor(s) | 01 /
WILLIAMS, Shazam 203 Faywood Boulevard Toronto, Ontario M3H 2Y2 / CA | 02 /
MUTER, John 90 Elmpine Trail King City, Ontario L7B 1K4 / CA | 03 /
HU, Linjie 16 Wheatley Road Maple, Ontario L6A 1V3 / CA | 04 /
CASOLARA, William, Z. 58860 La Mirada Trail Yucca Valley, CA 92284 / US | [2018/42] | Representative(s) | Valet Patent Services Limited Siedlungsstraße 4a 85253 Erdweg / DE | [2021/37] |
Former [2018/42] | Dentons UK and Middle East LLP One Fleet Place London EC4M 7WS / GB | Application number, filing date | 16872482.1 | 08.12.2016 | [2018/42] | WO2016IB01842 | Priority number, date | US201514966900 | 11.12.2015 Original published format: US201514966900 | [2018/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017098323 | Date: | 15.06.2017 | Language: | EN | [2017/24] | Type: | A1 Application with search report | No.: | EP3386611 | Date: | 17.10.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.06.2017 takes the place of the publication of the European patent application. | [2018/42] | Type: | B1 Patent specification | No.: | EP3386611 | Date: | 15.09.2021 | Language: | EN | [2021/37] | Search report(s) | International search report - published on: | CA | 15.06.2017 | (Supplementary) European search report - dispatched on: | EP | 16.04.2019 | Classification | IPC: | B01D53/92, B01D53/02, B01D53/96, F01N3/05, F01N5/02, F01N3/02, B01D53/04 | [2019/20] | CPC: |
B01D53/0462 (EP,US);
F01N3/0233 (US);
F01N3/0205 (EP,US);
F01N3/032 (US);
F01N3/05 (EP,US);
F01N3/055 (EP,US);
F01N5/02 (EP,US);
B01D2253/202 (EP,US);
B01D2257/206 (EP,US);
B01D2257/304 (EP,US);
B01D2257/556 (EP,US);
B01D2257/708 (EP,US);
B01D2257/80 (EP,US);
B01D2258/05 (EP,US);
B01D2259/40056 (EP,US);
B01D2259/4009 (EP,US);
F01N2410/00 (EP,US);
F01N2410/04 (US);
F01N2590/10 (EP,US);
Y02C20/20 (EP,US);
Y02E50/30 (EP);
Y02T10/12 (EP)
(-)
|
Former IPC [2018/42] | B01D53/92, B01D53/02, B01D53/96 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND SYSTEM ZUM ENTFERNEN VON VERUNREINIGUNGEN AUS EINEM GAS | [2021/02] | English: | METHOD AND SYSTEM FOR REMOVING IMPURITIES FROM A GAS | [2021/02] | French: | MÉTHODE ET SYSTÈME POUR ÉLIMINER LES IMPURETÉS D'UN GAZ | [2021/02] |
Former [2018/42] | SILOXANENTFERNUNGSSYSTEM UND MEDIENREGENERATIONSVERFAHREN | ||
Former [2018/42] | SILOXANE REMOVAL SYSTEM AND MEDIA REGENERATION METHODS | ||
Former [2018/42] | SYSTÈME D'ÉLIMINATION DE SILOXANE ET PROCÉDÉS DE RÉGÉNÉRATION DE MILIEUX | Entry into regional phase | 09.07.2018 | National basic fee paid | 09.07.2018 | Search fee paid | 09.07.2018 | Designation fee(s) paid | 09.07.2018 | Examination fee paid | Examination procedure | 09.07.2018 | Examination requested [2018/42] | 09.07.2018 | Date on which the examining division has become responsible | 11.11.2019 | Amendment by applicant (claims and/or description) | 20.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 07.08.2020 | Reply to a communication from the examining division | 18.01.2021 | Communication of intention to grant the patent | 19.02.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 06.04.2021 | Communication of intention to grant the patent | 05.08.2021 | Fee for grant paid | 05.08.2021 | Fee for publishing/printing paid | 05.08.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 16.06.2022 | No opposition filed within time limit [2022/34] | Fees paid | Renewal fee | 05.10.2018 | Renewal fee patent year 03 | 13.12.2019 | Renewal fee patent year 04 | 24.12.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.12.2016 | AL | 15.09.2021 | AT | 15.09.2021 | CY | 15.09.2021 | CZ | 15.09.2021 | DK | 15.09.2021 | EE | 15.09.2021 | ES | 15.09.2021 | FI | 15.09.2021 | HR | 15.09.2021 | LT | 15.09.2021 | LV | 15.09.2021 | MC | 15.09.2021 | MK | 15.09.2021 | NL | 15.09.2021 | PL | 15.09.2021 | RO | 15.09.2021 | RS | 15.09.2021 | SE | 15.09.2021 | SI | 15.09.2021 | SK | 15.09.2021 | SM | 15.09.2021 | TR | 15.09.2021 | IE | 08.12.2021 | LU | 08.12.2021 | BG | 15.12.2021 | NO | 15.12.2021 | GR | 16.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | IS | 15.01.2022 | PT | 17.01.2022 | [2024/29] |
Former [2024/22] | HU | 08.12.2016 | |
AL | 15.09.2021 | ||
AT | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
MK | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 08.12.2021 | ||
LU | 08.12.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/30] | HU | 08.12.2016 | |
AL | 15.09.2021 | ||
AT | 15.09.2021 | ||
CY | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 08.12.2021 | ||
LU | 08.12.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/29] | HU | 08.12.2016 | |
AL | 15.09.2021 | ||
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 08.12.2021 | ||
LU | 08.12.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/03] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 08.12.2021 | ||
LU | 08.12.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2023/01] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 08.12.2021 | ||
LU | 08.12.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
BE | 31.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/48] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
IE | 08.12.2021 | ||
LU | 08.12.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/46] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
LU | 08.12.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/36] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
DK | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SI | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/33] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
MC | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/29] | AL | 15.09.2021 | |
AT | 15.09.2021 | ||
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/25] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
SM | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/24] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
NL | 15.09.2021 | ||
PL | 15.09.2021 | ||
RO | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
IS | 15.01.2022 | ||
PT | 17.01.2022 | ||
Former [2022/23] | AT | 15.09.2021 | |
CZ | 15.09.2021 | ||
EE | 15.09.2021 | ||
ES | 15.09.2021 | ||
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
PL | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
SK | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
PT | 17.01.2022 | ||
Former [2022/21] | AT | 15.09.2021 | |
FI | 15.09.2021 | ||
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/10] | FI | 15.09.2021 | |
HR | 15.09.2021 | ||
LT | 15.09.2021 | ||
LV | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
GR | 16.12.2021 | ||
Former [2022/09] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
RS | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/08] | FI | 15.09.2021 | |
LT | 15.09.2021 | ||
SE | 15.09.2021 | ||
BG | 15.12.2021 | ||
NO | 15.12.2021 | ||
Former [2022/07] | LT | 15.09.2021 | |
NO | 15.12.2021 | Documents cited: | Search | [A]DE19960762 (DAIMLER CHRYSLER AG [DE]) [A] 1-10* figures 1,8; claim 1 *; | [XI]US2013061579 (KOTRBA ADAM J [US], et al) [X] 1,3-6,8,9 * figure 1 * * pages 20-22 * [I] 2,7,10; | [X]KR101544433B (INNOBE CO LTD [KR]) [X] 1,3-5,8 * figure 1 *; | [A] - E. TRONCONI ET AL, "Interaction of NO x Reduction and Soot Oxidation in a DPF with Cu-Zeolite SCR Coating", EMISSION CONTROL SCIENCE AND TECHNOLOGY, (20150508), vol. 1, no. 2, doi:10.1007/s40825-015-0014-y, ISSN 2199-3629, pages 134 - 151, XP055578753 [A] 7,10 * abstract * DOI: http://dx.doi.org/10.1007/s40825-015-0014-y | International search | [A]US2006225571 (HIGGINS VINCENT L [US])[A] 1-21; | [XY]US2008257158 (HOWARD LOWELL [US]) [XY] 1-21; | [A]US2014366726 (MITARITEN MICHAEL J [US], et al) [A] 1-21 |