EP3388243 - IMAGE FORMING APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 29.12.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 20.01.2023 | ||
Former | Grant of patent is intended Status updated on 15.09.2022 | ||
Former | Examination is in progress Status updated on 11.06.2021 | ||
Former | Request for examination was made Status updated on 14.09.2018 | ||
Former | The international publication has been made Status updated on 16.06.2017 | Most recent event Tooltip | 11.10.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 13.11.2024 [2024/46] | Applicant(s) | For all designated states Kyocera Document Solutions Inc. 1-2-28, Tamatsukuri Chuo-ku Osaka-shi, Osaka 540-8585 / JP | [2018/42] | Inventor(s) | 01 /
MARUHASHI Ken C/O KYOCERA Document Solutions Inc. 1-2-28 Tamatsukuri Chuo-Ku Osaka-Shi Osaka 540-8585 / JP | [2018/42] | Representative(s) | Beetz & Partner mbB Patentanwälte Prinzregentenstraße 54 80538 München / DE | [N/P] |
Former [2023/08] | Beetz & Partner mbB Patentanwälte Robert-Koch-Str. 1 80538 München / DE | ||
Former [2018/42] | Beetz & Partner mbB Patentanwälte Steinsdorfstraße 10 80538 München / DE | Application number, filing date | 16872701.4 | 12.10.2016 | [2018/42] | WO2016JP80212 | Priority number, date | JP20150241813 | 11.12.2015 Original published format: JP 2015241813 | [2018/42] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017098801 | Date: | 15.06.2017 | Language: | JA | [2017/24] | Type: | A1 Application with search report | No.: | EP3388243 | Date: | 17.10.2018 | Language: | EN | [2018/42] | Type: | B1 Patent specification | No.: | EP3388243 | Date: | 22.02.2023 | Language: | EN | [2023/08] | Search report(s) | International search report - published on: | JP | 15.06.2017 | (Supplementary) European search report - dispatched on: | EP | 28.06.2019 | Classification | IPC: | B41J29/38, G03G21/00, G03G21/14, G06F1/26, H04N1/00 | [2018/42] | CPC: |
B41J29/38 (EP,US);
G03G21/00 (EP,US);
G03G21/14 (EP,US);
G06F1/26 (EP,US);
H04N1/00 (EP,US);
H04N1/00095 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BILDERZEUGUNGSVORRICHTUNG | [2018/42] | English: | IMAGE FORMING APPARATUS | [2018/42] | French: | APPAREIL DE FORMATION D'IMAGE | [2018/42] | Entry into regional phase | 14.02.2018 | Translation filed | 27.02.2018 | National basic fee paid | 27.02.2018 | Search fee paid | 27.02.2018 | Designation fee(s) paid | 27.02.2018 | Examination fee paid | Examination procedure | 14.02.2018 | Date on which the examining division has become responsible | 27.02.2018 | Examination requested [2018/42] | 22.01.2020 | Amendment by applicant (claims and/or description) | 15.06.2021 | Despatch of a communication from the examining division (Time limit: M04) | 13.10.2021 | Reply to a communication from the examining division | 16.09.2022 | Communication of intention to grant the patent | 12.01.2023 | Receipt of the translation of the claim(s) | 13.01.2023 | Fee for grant paid | 13.01.2023 | Fee for publishing/printing paid | Opposition(s) | 23.11.2023 | No opposition filed within time limit [2024/05] | Fees paid | Renewal fee | 11.10.2018 | Renewal fee patent year 03 | 15.10.2019 | Renewal fee patent year 04 | 14.10.2020 | Renewal fee patent year 05 | 28.09.2021 | Renewal fee patent year 06 | 21.10.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 22.02.2023 | CZ | 22.02.2023 | DK | 22.02.2023 | EE | 22.02.2023 | ES | 22.02.2023 | FI | 22.02.2023 | HR | 22.02.2023 | IT | 22.02.2023 | LT | 22.02.2023 | LV | 22.02.2023 | MC | 22.02.2023 | NL | 22.02.2023 | PL | 22.02.2023 | RO | 22.02.2023 | RS | 22.02.2023 | SE | 22.02.2023 | SI | 22.02.2023 | SK | 22.02.2023 | SM | 22.02.2023 | NO | 22.05.2023 | GR | 23.05.2023 | IS | 22.06.2023 | PT | 22.06.2023 | GB | 12.10.2023 | IE | 12.10.2023 | LU | 12.10.2023 | BE | 31.10.2023 | CH | 31.10.2023 | FR | 31.10.2023 | [2024/46] |
Former [2024/36] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
IT | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
MC | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
GB | 12.10.2023 | ||
LU | 12.10.2023 | ||
BE | 31.10.2023 | ||
CH | 31.10.2023 | ||
FR | 31.10.2023 | ||
Former [2024/34] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
IT | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
MC | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
GB | 12.10.2023 | ||
LU | 12.10.2023 | ||
CH | 31.10.2023 | ||
FR | 31.10.2023 | ||
Former [2024/33] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
IT | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
MC | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
GB | 12.10.2023 | ||
LU | 12.10.2023 | ||
Former [2024/30] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
IT | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
MC | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
LU | 12.10.2023 | ||
Former [2024/28] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
IT | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
MC | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2024/26] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
IT | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2024/11] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SI | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/50] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SK | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/49] | AT | 22.02.2023 | |
CZ | 22.02.2023 | ||
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RO | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/48] | AT | 22.02.2023 | |
DK | 22.02.2023 | ||
EE | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/46] | AT | 22.02.2023 | |
DK | 22.02.2023 | ||
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
SM | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/39] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
IS | 22.06.2023 | ||
PT | 22.06.2023 | ||
Former [2023/38] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
PL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/37] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
GR | 23.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/36] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
FI | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
LV | 22.02.2023 | ||
NL | 22.02.2023 | ||
RS | 22.02.2023 | ||
SE | 22.02.2023 | ||
NO | 22.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/35] | AT | 22.02.2023 | |
ES | 22.02.2023 | ||
HR | 22.02.2023 | ||
LT | 22.02.2023 | ||
NL | 22.02.2023 | ||
RS | 22.02.2023 | ||
NO | 22.05.2023 | ||
PT | 22.06.2023 | ||
Former [2023/34] | ES | 22.02.2023 | |
LT | 22.02.2023 | ||
RS | 22.02.2023 | ||
PT | 22.06.2023 | ||
Former [2023/33] | ES | 22.02.2023 | |
LT | 22.02.2023 | Documents cited: | Search | [A]JPH0684391 (BROTHER IND LTD) [A] 1-5 * abstract *; | [A]JP2010225111 (TOSHIBA TEC KK) [A] 1-5 * claim 1 *; | [A]JP2012059037 (DAKKUSU KK, et al) [A] 1-5 * claims 1-6 *; | [A]US8572412 (SOLT YOSEF [IL]) [A] 1-5* claims 1-4 * | International search | [A]JPS6252620 (HITACHI LTD) [A] 1-5 * , entire text; all drawings (Family: none) *; | [A]JPH0684391 (BROTHER IND LTD) [A] 1-5 * , entire text; all drawings (Family: none) *; | [A]JP2004006473 (MATSUSHITA ELECTRIC IND CO LTD) [A] 1-5 * , entire text; all drawings (Family: none) *; | [A]WO2008087756 (MATSUSHITA ELECTRIC IND CO LTD [JP], et al) [A] 1-5* , paragraphs [0045] to [0050]; fig. 6 & US 2009/0045866 A1 paragraphs [0071] to [0076]; fig. 6 *; | [A]JP2010225111 (TOSHIBA TEC KK) [A] 1-5 * , entire text; all drawings (Family: none) * |