EP3397939 - CARTRIDGES FOR SAMPLE PARTITIONING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.04.2022 Database last updated on 14.08.2024 | |
Former | The patent has been granted Status updated on 23.04.2021 | ||
Former | Grant of patent is intended Status updated on 22.12.2020 | ||
Former | Request for examination was made Status updated on 04.09.2020 | ||
Former | Grant of patent is intended Status updated on 16.06.2020 | ||
Former | Request for examination was made Status updated on 05.10.2018 | ||
Former | The international publication has been made Status updated on 07.07.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states 3M Innovative Properties Company 3M Center Post Office Box 33427 St. Paul, MN 55133-3427 / US | [2018/45] | Inventor(s) | 01 /
BYRNE, Ruby L. 5249 17th Avenue NE Seattle Washington 98105 / US | 02 /
BRUTINEL, Evan D. 3M Center Post Office Box 33427 Saint Paul Minnesota 55133-3427 / US | 03 /
HAASE, Michael A. 3M Center Post Office Box 33427 Saint Paul Minnesota 55133-3427 / US | [2018/45] | Representative(s) | Mathys & Squire Theatinerstraße 7 80333 München / DE | [2021/21] |
Former [2018/45] | Herzog, Fiesser & Partner Patentanwälte PartG mbB Isartorplatz 1 80331 München / DE | Application number, filing date | 16882392.0 | 21.12.2016 | [2018/45] | WO2016US67940 | Priority number, date | US201562271659P | 28.12.2015 Original published format: US 201562271659 P | [2018/45] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017116891 | Date: | 06.07.2017 | Language: | EN | [2017/27] | Type: | A1 Application with search report | No.: | EP3397939 | Date: | 07.11.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 06.07.2017 takes the place of the publication of the European patent application. | [2018/45] | Type: | B1 Patent specification | No.: | EP3397939 | Date: | 26.05.2021 | Language: | EN | [2021/21] | Search report(s) | International search report - published on: | KR | 06.07.2017 | (Supplementary) European search report - dispatched on: | EP | 26.07.2019 | Classification | IPC: | G01N1/02, B01L3/00, G01N1/18, G01N35/10 | [2019/35] | CPC: |
B01L3/505 (EP,US);
G01N1/18 (US);
B01L3/5085 (EP,US);
G01N1/02 (EP,US);
G01N35/1016 (EP,US);
B01L2200/0642 (EP,US);
B01L2200/0689 (US);
B01L2200/12 (US);
B01L2300/0819 (EP,US);
B01L2300/0864 (EP,US);
B01L2300/123 (EP,US);
G01N2035/1032 (EP,US);
G01N2035/1034 (EP,US)
(-)
|
Former IPC [2018/45] | G01N1/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KARTUSCHEN ZUR PROBENPARTITIONIERUNG | [2018/45] | English: | CARTRIDGES FOR SAMPLE PARTITIONING | [2018/45] | French: | CARTOUCHES POUR CLOISONNER DES ÉCHANTILLONS | [2018/45] | Entry into regional phase | 12.07.2018 | National basic fee paid | 12.07.2018 | Search fee paid | 12.07.2018 | Designation fee(s) paid | 12.07.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 12.07.2018 | Examination requested [2018/45] | 14.02.2020 | Amendment by applicant (claims and/or description) | 17.06.2020 | Communication of intention to grant the patent | 02.09.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 02.09.2020 | Fee for grant paid | 02.09.2020 | Fee for publishing/printing paid | 15.01.2021 | Communication of intention to grant the patent | 16.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 01.03.2022 | No opposition filed within time limit [2022/18] | Fees paid | Renewal fee | 12.12.2018 | Renewal fee patent year 03 | 13.12.2019 | Renewal fee patent year 04 | 14.12.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.12.2016 | AL | 26.05.2021 | AT | 26.05.2021 | CY | 26.05.2021 | CZ | 26.05.2021 | DK | 26.05.2021 | EE | 26.05.2021 | ES | 26.05.2021 | FI | 26.05.2021 | HR | 26.05.2021 | IT | 26.05.2021 | LT | 26.05.2021 | LV | 26.05.2021 | MC | 26.05.2021 | MK | 26.05.2021 | NL | 26.05.2021 | PL | 26.05.2021 | RO | 26.05.2021 | RS | 26.05.2021 | SE | 26.05.2021 | SI | 26.05.2021 | SK | 26.05.2021 | SM | 26.05.2021 | TR | 26.05.2021 | BG | 26.08.2021 | NO | 26.08.2021 | GR | 27.08.2021 | IS | 26.09.2021 | PT | 27.09.2021 | GB | 21.12.2021 | IE | 21.12.2021 | LU | 21.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | [2024/29] |
Former [2024/22] | HU | 21.12.2016 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
MK | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 21.12.2021 | ||
IE | 21.12.2021 | ||
LU | 21.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/33] | HU | 21.12.2016 | |
AL | 26.05.2021 | ||
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 21.12.2021 | ||
IE | 21.12.2021 | ||
LU | 21.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/30] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CY | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 21.12.2021 | ||
IE | 21.12.2021 | ||
LU | 21.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/03] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 21.12.2021 | ||
IE | 21.12.2021 | ||
LU | 21.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
Former [2023/01] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 21.12.2021 | ||
IE | 21.12.2021 | ||
LU | 21.12.2021 | ||
BE | 31.12.2021 | ||
Former [2022/48] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 21.12.2021 | ||
IE | 21.12.2021 | ||
LU | 21.12.2021 | ||
Former [2022/47] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
GB | 21.12.2021 | ||
LU | 21.12.2021 | ||
Former [2022/46] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
LU | 21.12.2021 | ||
Former [2022/36] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
IT | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/33] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
MC | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/29] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SI | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/26] | AL | 26.05.2021 | |
AT | 26.05.2021 | ||
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/23] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/10] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
EE | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RO | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SK | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/08] | AT | 26.05.2021 | |
CZ | 26.05.2021 | ||
DK | 26.05.2021 | ||
ES | 26.05.2021 | ||
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/07] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
SM | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2022/04] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
NL | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/52] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
PL | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/51] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
RS | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
IS | 26.09.2021 | ||
PT | 27.09.2021 | ||
Former [2021/50] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
PT | 27.09.2021 | ||
Former [2021/49] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
HR | 26.05.2021 | ||
LT | 26.05.2021 | ||
LV | 26.05.2021 | ||
SE | 26.05.2021 | ||
BG | 26.08.2021 | ||
NO | 26.08.2021 | ||
GR | 27.08.2021 | ||
Former [2021/47] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | ||
BG | 26.08.2021 | ||
Former [2021/46] | AT | 26.05.2021 | |
FI | 26.05.2021 | ||
LT | 26.05.2021 | Documents cited: | Search | [A]WO2011063332 (3M INNOVATIVE PROPERTIES CO [US], et al) [A] 1-15 * page 17, line 12 - page 53, line 13; figures 1-5,8,9 *; | [A]WO2013170539 (GENE ERA BIOTECH CO LTD [CN], et al) [A] 1-15* paragraphs [0044] - [0074]; figures 1-8 *; | [A]US2014271408 (TAUNK DALE SINGH [US]) [A] 1-15 * paragraphs [0021] - [0033]; figures 1-8 *; | [A]US2015087078 (RICHARDSON BRUCE J [US]) [A] 1-15 * paragraphs [0024] - [0028]; figures 1-11 *; | [A]WO2015145154 (MEDDX SOLUTIONS LTD [GB]) [A] 1-15 * page 7, line 32 - page 23, line 9; figures 1-30 * | International search | [A]US5812317 (BILLINGSLEY BRITTON G [US], et al) [A] 1-17 * See abstract, claim 1 and figures 1-3. *; | [A]US2001038805 (HAMILTON RICHARD [US], et al) [A] 1-17* See abstract, claim 1 and figures 1A-5B. *; | [A]US2006072858 (KUROSAWA KAZUYUKI [JP], et al) [A] 1-17 * See abstract, claim 1 and figures 1-7. *; | [A]US2007048063 (BAUER WALTER G [US], et al) [A] 1-17 * See abstract, paragraphs [0030]-[0055], claim 1 and figures 1A-7B. *; | [A]EP2107010 (SCHLEGEL TOBIAS [DE]) [A] 1-17 * See claims 1-3 and figure 1. * |