blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3354147

EP3354147 - PROTECTIVE GEAR AND METHOD OF PRODUCING PROTECTIVE GEAR [Right-click to bookmark this link]
Former [2018/31]METHOD OF PRODUCING PROTECTIVE GEAR
[2019/41]
StatusNo opposition filed within time limit
Status updated on  01.01.2021
Database last updated on 16.07.2024
FormerThe patent has been granted
Status updated on  24.01.2020
FormerGrant of patent is intended
Status updated on  17.09.2019
FormerRequest for examination was made
Status updated on  29.06.2018
FormerThe international publication has been made
Status updated on  21.07.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Grebennikov, Viktor Mikhajjlovich
ul. Veresaeva 13-40
Moscow 121357 / RU
[2018/31]
Inventor(s)01 / see applicant
...
 [2018/31]
Representative(s)Kormos, Ágnes
Vaczi ut 66. fsz. 3.
1132 Budapest / HU
[2018/31]
Application number, filing date16885277.030.11.2016
[2018/31]
WO2016RU00835
Priority number, dateRU2016010100614.01.2016         Original published format: RU 2016101006
[2018/31]
Filing languageRU
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017123116
Date:20.07.2017
Language:RU
[2017/29]
Type: A1 Application with search report 
No.:EP3354147
Date:01.08.2018
Language:EN
[2018/31]
Type: B1 Patent specification 
No.:EP3354147
Date:26.02.2020
Language:EN
[2020/09]
Search report(s)International search report - published on:RU20.07.2017
(Supplementary) European search report - dispatched on:EP17.09.2018
ClassificationIPC:A42B1/06, A42B1/24, A61F9/02
[2018/42]
CPC:
A01K55/00 (EP,RU,US); A42B1/06 (RU); A42B1/0181 (US);
A42B1/0186 (EP,RU,US); A42B1/0187 (EP,US); A42B1/247 (EP,US);
A42B3/105 (US) (-)
Former IPC [2018/31]A42B1/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/31]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:SCHUTZKLEIDUNG UND VERFAHREN ZUR HERSTELLUNG VON SCHUTZKLEIDUNG[2019/41]
English:PROTECTIVE GEAR AND METHOD OF PRODUCING PROTECTIVE GEAR[2019/41]
French:DISPOSITIF DE PROTECTION ET PROCÉDÉ DE FABRICATION D'UN DISPOSITIF DE PROTECTION[2019/41]
Former [2018/31]VERFAHREN ZUR HERSTELLUNG VON SCHUTZKLEIDUNG
Former [2018/31]METHOD OF PRODUCING PROTECTIVE GEAR
Former [2018/31]PROCÉDÉ DE FABRICATION D'UN MATÉRIEL DE PROTECTION
Entry into regional phase25.04.2018Translation filed 
26.04.2018National basic fee paid 
26.04.2018Search fee paid 
26.04.2018Designation fee(s) paid 
26.04.2018Examination fee paid 
Examination procedure25.04.2018Date on which the examining division has become responsible
26.04.2018Examination requested  [2018/31]
28.03.2019Amendment by applicant (claims and/or description)
18.09.2019Communication of intention to grant the patent
26.11.2019Fee for grant paid
26.11.2019Fee for publishing/printing paid
16.01.2020Receipt of the translation of the claim(s)
Opposition(s)27.11.2020No opposition filed within time limit [2021/05]
Fees paidRenewal fee
20.11.2018Renewal fee patent year 03
23.10.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.11.2016
AL26.02.2020
AT26.02.2020
CY26.02.2020
CZ26.02.2020
EE26.02.2020
ES26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MK26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
[2022/31]
Former [2022/30]HU30.11.2016
AL26.02.2020
AT26.02.2020
CY26.02.2020
CZ26.02.2020
EE26.02.2020
ES26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2022/27]HU30.11.2016
AT26.02.2020
CY26.02.2020
CZ26.02.2020
EE26.02.2020
ES26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
TR26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/31]AT26.02.2020
CZ26.02.2020
EE26.02.2020
ES26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/10]AT26.02.2020
CZ26.02.2020
EE26.02.2020
ES26.02.2020
HR26.02.2020
IT26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/50]CZ26.02.2020
EE26.02.2020
ES26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/49]CZ26.02.2020
ES26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/48]ES26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/47]ES26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/45]HR26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/40]HR26.02.2020
LV26.02.2020
RS26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/39]HR26.02.2020
LV26.02.2020
RS26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
Former [2020/38]HR26.02.2020
LV26.02.2020
RS26.02.2020
NO26.05.2020
GR27.05.2020
Former [2020/37]HR26.02.2020
LV26.02.2020
RS26.02.2020
NO26.05.2020
Former [2020/35]NO26.05.2020
Documents cited:Search[A]US766426  (COMSTOCK EDWARD F [US]) [A] 1-12 * page 1, lines 34-50; figures 1,2 *;
 [A]US3823418  (PIPER F) [A] 1-12* column 2, line 47 - column 3, line 15; figure 1 *;
 [A]US5025507  (KIRBY RICHARD C [US]) [A] 1-12 * column 7, lines 52-66; figures 7,9 * * column 6, lines 25-57 *;
 [XYI]US6298492  (STIRLING WILLIAM H [US]) [X] 1,3,4,7,9,10 * column 2, line 55 - column 3, line 41; figures 4,5 * [Y] 6,12 [I] 2,5,8,11;
 [Y]US2006005300  (ST-GERMAIN GILLES [CA]) [Y] 6,12 * paragraph [0028]; figure 1 *
International search[A]SU120649  (AKULICH I V) [A] 1-12;
 [A]US6049904  (SIRACUSA PETER [US])[A] 1-12;
 [A]US6298492  (STIRLING WILLIAM H [US]) [A] 1-12;
 [A]RU2233584  (PANCHEKHA IURII STEPANOVICH) [A] 1-12
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.