EP3403083 - FAST HALL EFFECT MEASUREMENT SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.04.2023 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 20.05.2022 | ||
Former | Grant of patent is intended Status updated on 03.01.2022 | ||
Former | Request for examination was made Status updated on 10.12.2021 | ||
Former | Grant of patent is intended Status updated on 29.07.2021 | ||
Former | Request for examination was made Status updated on 19.10.2018 | ||
Former | The international publication has been made Status updated on 21.07.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states LAKE SHORE CRYOTRONICS, INC. 575 McCorkle Boulevard Westerville, OH 43082 / US | [2018/47] | Inventor(s) | 01 /
LINDEMUTH, Jeffrey R. 4266 Harlem Road Galena, Ohio 43021 / US | [2018/47] | Representative(s) | Mewburn Ellis LLP Aurora Building Counterslip Bristol BS1 6BX / GB | [2022/25] |
Former [2018/47] | Naylor, Matthew John Mewburn Ellis LLP City Tower 40 Basinghall Street London EC2V 5DE / GB | Application number, filing date | 16885412.3 | 09.12.2016 | [2018/47] | WO2016US65747 | Priority number, date | US201614996719 | 15.01.2016 Original published format: US201614996719 | [2018/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017123353 | Date: | 20.07.2017 | Language: | EN | [2017/29] | Type: | A1 Application with search report | No.: | EP3403083 | Date: | 21.11.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 20.07.2017 takes the place of the publication of the European patent application. | [2018/47] | Type: | B1 Patent specification | No.: | EP3403083 | Date: | 22.06.2022 | Language: | EN | [2022/25] | Search report(s) | International search report - published on: | US | 20.07.2017 | (Supplementary) European search report - dispatched on: | EP | 02.08.2019 | Classification | IPC: | G01N27/72, G01R33/07 | [2019/36] | CPC: |
G01R33/072 (EP,KR,US);
G01R33/12 (KR,US)
|
Former IPC [2018/47] | G01N27/72 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SCHNELLES HALLEFFEKT-MESSSYSTEM | [2018/47] | English: | FAST HALL EFFECT MEASUREMENT SYSTEM | [2018/47] | French: | SYSTÈME DE MESURE D'EFFET HALL RAPIDE | [2018/47] | Entry into regional phase | 19.07.2018 | National basic fee paid | 19.07.2018 | Search fee paid | 19.07.2018 | Designation fee(s) paid | 19.07.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 19.07.2018 | Examination requested [2018/47] | 28.02.2020 | Amendment by applicant (claims and/or description) | 30.07.2021 | Communication of intention to grant the patent | 09.12.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 04.01.2022 | Communication of intention to grant the patent | 11.05.2022 | Fee for grant paid | 11.05.2022 | Fee for publishing/printing paid | 11.05.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22172028.7 / EP4060333 | Opposition(s) | 23.03.2023 | No opposition filed within time limit [2023/22] | Fees paid | Renewal fee | 21.12.2018 | Renewal fee patent year 03 | 27.12.2019 | Renewal fee patent year 04 | 28.12.2020 | Renewal fee patent year 05 | 27.12.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.12.2016 | AL | 22.06.2022 | AT | 22.06.2022 | CY | 22.06.2022 | CZ | 22.06.2022 | DK | 22.06.2022 | EE | 22.06.2022 | ES | 22.06.2022 | FI | 22.06.2022 | HR | 22.06.2022 | IT | 22.06.2022 | LT | 22.06.2022 | LV | 22.06.2022 | MC | 22.06.2022 | MK | 22.06.2022 | NL | 22.06.2022 | PL | 22.06.2022 | RO | 22.06.2022 | RS | 22.06.2022 | SE | 22.06.2022 | SI | 22.06.2022 | SK | 22.06.2022 | SM | 22.06.2022 | BG | 22.09.2022 | NO | 22.09.2022 | GR | 23.09.2022 | IS | 22.10.2022 | PT | 24.10.2022 | IE | 09.12.2022 | LU | 09.12.2022 | BE | 31.12.2022 | [2024/29] |
Former [2024/27] | HU | 09.12.2016 | |
AL | 22.06.2022 | ||
AT | 22.06.2022 | ||
CY | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
IT | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
MK | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 09.12.2022 | ||
LU | 09.12.2022 | ||
BE | 31.12.2022 | ||
Former [2024/21] | HU | 09.12.2016 | |
AL | 22.06.2022 | ||
AT | 22.06.2022 | ||
CY | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
IT | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 09.12.2022 | ||
LU | 09.12.2022 | ||
BE | 31.12.2022 | ||
Former [2024/18] | HU | 09.12.2016 | |
AL | 22.06.2022 | ||
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
IT | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 09.12.2022 | ||
LU | 09.12.2022 | ||
BE | 31.12.2022 | ||
Former [2024/11] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
IT | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 09.12.2022 | ||
LU | 09.12.2022 | ||
BE | 31.12.2022 | ||
Former [2023/49] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 09.12.2022 | ||
LU | 09.12.2022 | ||
BE | 31.12.2022 | ||
Former [2023/48] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
IE | 09.12.2022 | ||
LU | 09.12.2022 | ||
Former [2023/38] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
LU | 09.12.2022 | ||
Former [2023/37] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SI | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/21] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
DK | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/17] | AL | 22.06.2022 | |
AT | 22.06.2022 | ||
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/12] | AT | 22.06.2022 | |
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
IS | 22.10.2022 | ||
PT | 24.10.2022 | ||
Former [2023/11] | AT | 22.06.2022 | |
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
PL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
PT | 24.10.2022 | ||
Former [2023/09] | AT | 22.06.2022 | |
CZ | 22.06.2022 | ||
EE | 22.06.2022 | ||
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
RO | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
SK | 22.06.2022 | ||
SM | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
PT | 24.10.2022 | ||
Former [2023/08] | AT | 22.06.2022 | |
ES | 22.06.2022 | ||
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2023/07] | AT | 22.06.2022 | |
FI | 22.06.2022 | ||
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2023/02] | FI | 22.06.2022 | |
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
NL | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2022/50] | FI | 22.06.2022 | |
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
RS | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2022/49] | FI | 22.06.2022 | |
HR | 22.06.2022 | ||
LT | 22.06.2022 | ||
LV | 22.06.2022 | ||
SE | 22.06.2022 | ||
BG | 22.09.2022 | ||
NO | 22.09.2022 | ||
GR | 23.09.2022 | ||
Former [2022/47] | FI | 22.06.2022 | |
LT | 22.06.2022 | ||
SE | 22.06.2022 | ||
NO | 22.09.2022 | Documents cited: | Search | [Y]US5424561 (TACHIBANA TAKESHI [JP], et al) [Y] 9 * column 1 *; | [A]EP1297349 (INFINEON TECHNOLOGIES AG [DE]) [A] 1-15* the whole document *; | [Y]WO2005017546 (SYSTEMATIC DESIGN HOLDING B V [NL], et al) [Y] 7 * abstract *; | [XI]US2008238410 (CHARLIER OLIVIER [BE], et al) [X] 1 * paragraphs [0081] - [0086] * [I] 5; | [XYI]US2014070796 (REYMOND SERGE [CH], et al) [X] 1-4,6,8,10-15 * paragraphs [0027] - [0031] - [0 37] - [0044] - [0 60] - [0064] - [0 89] - [0091] - [ 240] - [0245] - [ 255] , [ 259]; figures 1-16 * [Y] 7,9 [I] 5,7 | International search | [Y]US5424561 (TACHIBANA TAKESHI [JP], et al) [Y] 4, 11, 20 * , Abstract, col 1, In 11-68 *; | [Y]US2001050557 (KEMPE VOLKER [AT]) [Y] 3, 9, 18 * , Abstract, para [0012], [0018] *; | [A]US2002175679 (KIM HOON [KR], et al) [A] 1-20* , entire document *; | [Y]US2009045807 (NISHIDA SOSUKE [JP], et al) [Y] 14, 15 * , para [0108] *; | [XY]US2014070796 (REYMOND SERGE [CH], et al) [X] 1, 2, 5-8, 10, 12, 13, 16, 17, 19 * , entire document, especially; para [0011], [0027], [0028], [0032], [0037], [0038], [0043]-[0045], [0053], [0073], [0081]-[0083],[0090], [0099], [0100], [0111]-[0115], [0137], [0217], [0229], [0259]-[0261] * [Y] 3, 4, 9, 11, 14, 15, 18, 20 | Examination | US2014028305 |