EP3402255 - EMISSION POWER VERIFICATION METHOD, USER EQUIPMENT, AND BASE STATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 05.07.2024 | |
Former | The patent has been granted Status updated on 26.02.2021 | ||
Former | Grant of patent is intended Status updated on 13.10.2020 | ||
Former | Request for examination was made Status updated on 12.10.2018 | ||
Former | The international publication has been made Status updated on 11.08.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2018/46] | Inventor(s) | 01 /
LI, Chao Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | 02 /
ZHANG, Xingwei Huawei Administration Building Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | [2018/46] | Representative(s) | Pfenning, Meinig & Partner mbB Patent- und Rechtsanwälte Joachimsthaler Straße 10-12 10719 Berlin / DE | [2018/46] | Application number, filing date | 16888650.5 | 02.02.2016 | [2018/46] | WO2016CN73165 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017132825 | Date: | 10.08.2017 | Language: | ZH | [2017/32] | Type: | A1 Application with search report | No.: | EP3402255 | Date: | 14.11.2018 | Language: | EN | [2018/46] | Type: | B1 Patent specification | No.: | EP3402255 | Date: | 31.03.2021 | Language: | EN | [2021/13] | Search report(s) | International search report - published on: | CN | 10.08.2017 | (Supplementary) European search report - dispatched on: | EP | 16.11.2018 | Classification | IPC: | H04W52/00, H04W52/34, H04W52/32, H04W52/28, // H04W52/36, H04W52/38, H04W52/54, H04W52/08, H04W52/10, H04W52/24 | [2018/51] | CPC: |
H04W52/54 (EP,CN,US);
H04W52/383 (EP,CN,US);
H04W4/46 (CN,US);
H04W52/10 (EP,CN,US);
H04W52/242 (EP,CN,US);
H04W52/286 (EP,US);
H04W52/325 (EP,CN,US);
H04W52/346 (EP,CN,US);
H04W52/367 (EP,CN,US);
|
Former IPC [2018/46] | H04W52/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SENDELEISTUNGVERIFIZIERUNGSVERFAHREN, BENUTZERENDGERÄT UND BASISSTATION | [2018/46] | English: | EMISSION POWER VERIFICATION METHOD, USER EQUIPMENT, AND BASE STATION | [2018/46] | French: | PROCÉDÉ DE VÉRIFICATION DE PUISSANCE D'ÉMISSION, ÉQUIPEMENT UTILISATEUR ET STATION DE BASE | [2018/46] | Entry into regional phase | 09.08.2018 | Translation filed | 09.08.2018 | National basic fee paid | 09.08.2018 | Search fee paid | 09.08.2018 | Designation fee(s) paid | 09.08.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 09.08.2018 | Examination requested [2018/46] | 29.05.2019 | Amendment by applicant (claims and/or description) | 14.10.2020 | Communication of intention to grant the patent | 15.01.2021 | Receipt of the translation of the claim(s) | 23.01.2021 | Fee for grant paid | 23.01.2021 | Fee for publishing/printing paid | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 09.08.2018 | Renewal fee patent year 03 | 27.02.2019 | Renewal fee patent year 04 | 27.02.2020 | Renewal fee patent year 05 | 23.02.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.02.2016 | AL | 31.03.2021 | AT | 31.03.2021 | CY | 31.03.2021 | CZ | 31.03.2021 | DK | 31.03.2021 | EE | 31.03.2021 | ES | 31.03.2021 | FI | 31.03.2021 | HR | 31.03.2021 | IT | 31.03.2021 | LT | 31.03.2021 | LV | 31.03.2021 | MC | 31.03.2021 | MK | 31.03.2021 | NL | 31.03.2021 | PL | 31.03.2021 | RO | 31.03.2021 | RS | 31.03.2021 | SE | 31.03.2021 | SI | 31.03.2021 | SK | 31.03.2021 | SM | 31.03.2021 | TR | 31.03.2021 | BG | 30.06.2021 | NO | 30.06.2021 | IS | 31.07.2021 | PT | 02.08.2021 | [2024/29] |
Former [2024/22] | HU | 02.02.2016 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
MK | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2024/20] | HU | 02.02.2016 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2024/18] | HU | 02.02.2016 | |
AL | 31.03.2021 | ||
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/44] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/36] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/29] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/23] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/10] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
IS | 24.12.2021 | ||
Former [2022/08] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/07] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/52] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/51] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/50] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
Former [2021/48] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/47] | AT | 31.03.2021 | |
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/46] | AT | 31.03.2021 | |
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/38] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/37] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/36] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/35] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
NO | 30.06.2021 | ||
Former [2021/33] | FI | 31.03.2021 | |
NO | 30.06.2021 | Documents cited: | Search | [XI]US2013324182 (DENG TAO [US], et al) [X] 1-3,5,8-10,12 * claims 1-25 * * paragraphs [0003] , [0013] , [0056] , [0066] , [0068] , [0069] * * paragraph [0104] - paragraph [0115] * [I] 4,6,7,11,13,14; | [A]WO2016008138 (HUAWEI TECH CO LTD [CN]) [A] 1-14 * abstract *; | EP3016426 [ ] (HUAWEI TECH CO LTD [CN]) [ ] * claims 1-36 * * paragraph [0002] - paragraph [0003] * * paragraph [0056] - paragraph [0060] * * paragraph [0081] - paragraph [0090] * * tables 4-9 *; | [XA] - HUAWEI ET AL, "Power control for V2V", vol. RAN WG1, no. Anaheim, USA; 20151115 - 20151122, (20151115), 3GPP DRAFT; R1-156429, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20151115), XP051002895 [X] 1,2,8,9 * the whole document * [A] 3-7,10-14 | [A] - "3 Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 13)", 3GPP STANDARD; 3GPP TS 36.213, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20160126), vol. RAN WG1, no. V13.0.1, pages 300 - 318, XP051087707 [A] 1-14 * paragraphs [14.1.1.5] , [14.2.1.3] * | International search | [A]CN103067140 (ZTE CORP) [A] 1-44 * , description, paragraphs [0012]-[0014] *; | [X]CN103596258 (ZTE CORP) [X] 60-62, 78-80 * , description, paragraphs [0025]-[0036] *; | [X]CN104066205 (ESPRESSIF SYSTEMS SHANGHAI PTE LTD) [X] 45-59, 63-77 * description, paragraph r00221 *; | [A]US2015094112 (LAMPINEN KARL MARKO JUHANI [FI], et al) [A] 1-80* , the whole document * |