EP3418024 - BEARING CAGE AND MANUFACTURING METHOD THEREFOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.12.2020 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 03.01.2020 | ||
Former | Grant of patent is intended Status updated on 21.10.2019 | ||
Former | Request for examination was made Status updated on 01.10.2019 | ||
Former | Grant of patent is intended Status updated on 02.07.2019 | ||
Former | Request for examination was made Status updated on 23.11.2018 | ||
Former | The international publication has been made Status updated on 01.09.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states NSK Ltd. 6-3 Ohsaki 1-chome Shinagawa-ku Tokyo 141-8560 / JP | [2018/52] | Inventor(s) | 01 /
KURAMOTO Yoshikazu c/o NSK Ltd. 5-50 Kugenumashinmei 1-chome Fujisawa-shi Kanagawa 251-8501 / JP | 02 /
AIHARA Nariaki c/o NSK Ltd. 5-50 Kugenumashinmei 1-chome Fujisawa-shi Kanagawa 251-8501 / JP | 03 /
HIRAMOTO Takayuki c/o NSK Ltd. 5-50 Kugenumashinmei 1-chome Fujisawa-shi Kanagawa 251-8501 / JP | [2018/52] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2018/52] | Application number, filing date | 16890578.4 | 19.02.2016 | [2018/52] | WO2016JP54929 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017141437 | Date: | 24.08.2017 | Language: | JA | [2017/34] | Type: | A1 Application with search report | No.: | EP3418024 | Date: | 26.12.2018 | Language: | EN | [2018/52] | Type: | B1 Patent specification | No.: | EP3418024 | Date: | 05.02.2020 | Language: | EN | [2020/06] | Search report(s) | International search report - published on: | JP | 24.08.2017 | (Supplementary) European search report - dispatched on: | EP | 01.02.2019 | Classification | IPC: | B29C45/26, F16C19/00, F16C33/41, F16C33/49, B29C33/00, B29L31/04 | [2019/10] | CPC: |
B29C45/0025 (EP,US);
B29C45/0046 (EP,US);
B29C45/2616 (US);
B29C45/2669 (EP,US);
B29C45/2708 (US);
F16C19/06 (EP,US);
F16C33/416 (EP,US);
F16C33/498 (EP,US);
B29K2105/12 (US);
B29L2031/04 (US);
B29L2031/045 (EP,US);
F16C2208/36 (US);
|
Former IPC [2018/52] | B29C45/26, F16C19/00, F16C33/41, F16C33/49 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | LAGERKÄFIG UND HERSTELLUNGSVERFAHREN DAFÜR | [2018/52] | English: | BEARING CAGE AND MANUFACTURING METHOD THEREFOR | [2018/52] | French: | CAGE DE ROULEMENT ET SON PROCÉDÉ DE FABRICATION | [2018/52] | Entry into regional phase | 09.08.2018 | Translation filed | 09.08.2018 | National basic fee paid | 09.08.2018 | Search fee paid | 09.08.2018 | Designation fee(s) paid | 09.08.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 09.08.2018 | Examination requested [2018/52] | 24.04.2019 | Amendment by applicant (claims and/or description) | 03.07.2019 | Communication of intention to grant the patent | 01.10.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 22.10.2019 | Communication of intention to grant the patent | 20.12.2019 | Fee for grant paid | 20.12.2019 | Fee for publishing/printing paid | 20.12.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 06.11.2020 | No opposition filed within time limit [2021/02] | Fees paid | Renewal fee | 09.08.2018 | Renewal fee patent year 03 | 25.02.2019 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.02.2016 | AL | 05.02.2020 | AT | 05.02.2020 | CY | 05.02.2020 | CZ | 05.02.2020 | DK | 05.02.2020 | EE | 05.02.2020 | ES | 05.02.2020 | FI | 05.02.2020 | HR | 05.02.2020 | IT | 05.02.2020 | LT | 05.02.2020 | LV | 05.02.2020 | MC | 05.02.2020 | MK | 05.02.2020 | MT | 05.02.2020 | NL | 05.02.2020 | PL | 05.02.2020 | RO | 05.02.2020 | RS | 05.02.2020 | SE | 05.02.2020 | SI | 05.02.2020 | SK | 05.02.2020 | SM | 05.02.2020 | TR | 05.02.2020 | IE | 19.02.2020 | LU | 19.02.2020 | BE | 29.02.2020 | CH | 29.02.2020 | LI | 29.02.2020 | BG | 05.05.2020 | NO | 05.05.2020 | GR | 06.05.2020 | IS | 05.06.2020 | PT | 28.06.2020 | [2022/31] |
Former [2022/30] | HU | 19.02.2016 | |
AL | 05.02.2020 | ||
AT | 05.02.2020 | ||
CY | 05.02.2020 | ||
CZ | 05.02.2020 | ||
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
IT | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
MC | 05.02.2020 | ||
MT | 05.02.2020 | ||
NL | 05.02.2020 | ||
PL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SI | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
TR | 05.02.2020 | ||
IE | 19.02.2020 | ||
LU | 19.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2022/27] | HU | 19.02.2016 | |
AT | 05.02.2020 | ||
CY | 05.02.2020 | ||
CZ | 05.02.2020 | ||
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
IT | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
MC | 05.02.2020 | ||
MT | 05.02.2020 | ||
NL | 05.02.2020 | ||
PL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SI | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
TR | 05.02.2020 | ||
IE | 19.02.2020 | ||
LU | 19.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2021/10] | AT | 05.02.2020 | |
CZ | 05.02.2020 | ||
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
IT | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
MC | 05.02.2020 | ||
NL | 05.02.2020 | ||
PL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SI | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
IE | 19.02.2020 | ||
LU | 19.02.2020 | ||
BE | 29.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2021/08] | CZ | 05.02.2020 | |
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
MC | 05.02.2020 | ||
NL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
IE | 19.02.2020 | ||
LU | 19.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/52] | CZ | 05.02.2020 | |
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
MC | 05.02.2020 | ||
NL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
LU | 19.02.2020 | ||
CH | 29.02.2020 | ||
LI | 29.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/50] | CZ | 05.02.2020 | |
DK | 05.02.2020 | ||
EE | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
LU | 19.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/49] | CZ | 05.02.2020 | |
DK | 05.02.2020 | ||
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SK | 05.02.2020 | ||
SM | 05.02.2020 | ||
LU | 19.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/48] | DK | 05.02.2020 | |
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
RO | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
SM | 05.02.2020 | ||
LU | 19.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/47] | DK | 05.02.2020 | |
ES | 05.02.2020 | ||
FI | 05.02.2020 | ||
HR | 05.02.2020 | ||
LT | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
LU | 19.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/45] | FI | 05.02.2020 | |
HR | 05.02.2020 | ||
LV | 05.02.2020 | ||
NL | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/40] | FI | 05.02.2020 | |
HR | 05.02.2020 | ||
LV | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
IS | 05.06.2020 | ||
PT | 28.06.2020 | ||
Former [2020/39] | FI | 05.02.2020 | |
HR | 05.02.2020 | ||
LV | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
BG | 05.05.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
PT | 28.06.2020 | ||
Former [2020/38] | FI | 05.02.2020 | |
HR | 05.02.2020 | ||
LV | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
NO | 05.05.2020 | ||
GR | 06.05.2020 | ||
PT | 28.06.2020 | ||
Former [2020/37] | FI | 05.02.2020 | |
HR | 05.02.2020 | ||
LV | 05.02.2020 | ||
RS | 05.02.2020 | ||
SE | 05.02.2020 | ||
NO | 05.05.2020 | ||
PT | 28.06.2020 | ||
Former [2020/35] | FI | 05.02.2020 | |
NO | 05.05.2020 | Documents cited: | Search | [A]JP3652396B (KOYO SEIKO CO) [A] 1-6* paragraphs [0013] - [0018]; figure 1 *; | [A]JP2012087890 (NSK LTD) [A] 1-6 * paragraphs [0025] , [0024] , [0027] , [0031]; figures 3-5 *; | [A]JP5428839B (NSK LTD) [A] 1-6 * paragraph [0021] - paragraphs [0024] , [0033] , [0039]; figures 2-8 * | International search | [XA]JPH10318263 (KOYO SEIKO CO) [X] 6 * , paragraphs [0018] to [0024]; each drawing & US 5948340 A columns 3 to 4; each drawing & EP 879687 A1 & DE 69818742 D * [A] 1-5; | [XA]JP2012087890 (NSK LTD) [X] 6 * , paragraphs [0020] to [0029]; each drawing (Family: none) * [A] 1-5; | [XA]JP2013029164 (NSK LTD) [X] 6 * , paragraphs [0024] to [0031]; each drawing (Family: none) *[A] 1-5 | by applicant | JP3652396B | JP2012219917 | JP5428839B |