| EP3434026 - WAKE SIGNAL FROM A PORTABLE TRANSCEIVER UNIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.03.2022 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 26.03.2021 | ||
| Former | Grant of patent is intended Status updated on 06.12.2020 | ||
| Former | Request for examination was made Status updated on 30.12.2018 | ||
| Former | The international publication has been made Status updated on 29.09.2017 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Hewlett-Packard Development Company, L.P. 10300 Energy Drive Spring TX 77389 / US | [2019/20] |
| Former [2019/05] | For all designated states Hewlett-Packard Development Company, L.P. 11445 Compaq Center Drive W. Houston, Texas 77070 / US | Inventor(s) | 01 /
HANES, David H. 3390 E Harmony Rd. Ft. Collins Colorado 80528-9544 / US | [2019/05] | Representative(s) | EIP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | [2021/17] |
| Former [2019/05] | EIP EIP Europe LLP Fairfax House 15 Fulwood Place London WC1V 6HU / GB | Application number, filing date | 16895651.4 | 21.03.2016 | [2019/05] | WO2016US23481 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017164840 | Date: | 28.09.2017 | Language: | EN | [2017/39] | Type: | A1 Application with search report | No.: | EP3434026 | Date: | 30.01.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 28.09.2017 takes the place of the publication of the European patent application. | [2019/05] | Type: | B1 Patent specification | No.: | EP3434026 | Date: | 28.04.2021 | Language: | EN | [2021/17] | Search report(s) | International search report - published on: | KR | 28.09.2017 | (Supplementary) European search report - dispatched on: | EP | 11.10.2019 | Classification | IPC: | H04R9/02, H04B1/38 | [2019/05] | CPC: |
H04R5/04 (EP,US);
G06F3/017 (US);
G10L15/28 (US);
H04B1/38 (US);
H04B1/3833 (US);
H04B1/3888 (EP,US);
H04R29/007 (EP,US);
H04R2201/028 (EP,US);
H04R2420/05 (EP,US);
H04R2420/07 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | AUFWECKSIGNAL VON EINER TRAGBAREN SENDE-EMPFANGSEINHEIT | [2019/05] | English: | WAKE SIGNAL FROM A PORTABLE TRANSCEIVER UNIT | [2019/05] | French: | SIGNAL D'ÉVEIL PROVENANT D'UNE UNITÉ D'ÉMISSION-RÉCEPTION PORTABLE | [2019/05] | Entry into regional phase | 21.09.2018 | National basic fee paid | 21.09.2018 | Search fee paid | 21.09.2018 | Designation fee(s) paid | 21.09.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 21.09.2018 | Examination requested [2019/05] | 21.04.2020 | Amendment by applicant (claims and/or description) | 07.12.2020 | Communication of intention to grant the patent | 01.03.2021 | Fee for grant paid | 01.03.2021 | Fee for publishing/printing paid | 01.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.01.2022 | No opposition filed within time limit [2022/14] | Fees paid | Renewal fee | 21.09.2018 | Renewal fee patent year 03 | 22.03.2019 | Renewal fee patent year 04 | 20.03.2020 | Renewal fee patent year 05 | 23.03.2021 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.03.2016 | AL | 28.04.2021 | AT | 28.04.2021 | CY | 28.04.2021 | CZ | 28.04.2021 | DK | 28.04.2021 | EE | 28.04.2021 | ES | 28.04.2021 | FI | 28.04.2021 | HR | 28.04.2021 | IT | 28.04.2021 | LT | 28.04.2021 | LV | 28.04.2021 | MC | 28.04.2021 | MK | 28.04.2021 | MT | 28.04.2021 | NL | 28.04.2021 | PL | 28.04.2021 | RO | 28.04.2021 | RS | 28.04.2021 | SE | 28.04.2021 | SI | 28.04.2021 | SK | 28.04.2021 | SM | 28.04.2021 | TR | 28.04.2021 | BG | 28.07.2021 | NO | 28.07.2021 | GR | 29.07.2021 | IS | 28.08.2021 | PT | 30.08.2021 | [2026/04] |
| Former [2024/44] | HU | 21.03.2016 | |
| AL | 28.04.2021 | ||
| AT | 28.04.2021 | ||
| CY | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| MK | 28.04.2021 | ||
| MT | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2024/22] | HU | 21.03.2016 | |
| AL | 28.04.2021 | ||
| AT | 28.04.2021 | ||
| CY | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| MK | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2024/20] | HU | 21.03.2016 | |
| AL | 28.04.2021 | ||
| AT | 28.04.2021 | ||
| CY | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2024/18] | HU | 21.03.2016 | |
| AL | 28.04.2021 | ||
| AT | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/47] | AL | 28.04.2021 | |
| AT | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/36] | AL | 28.04.2021 | |
| AT | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/29] | AL | 28.04.2021 | |
| AT | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/26] | AL | 28.04.2021 | |
| AT | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/23] | AT | 28.04.2021 | |
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/10] | AT | 28.04.2021 | |
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| PT | 30.08.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/09] | AT | 28.04.2021 | |
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/08] | AT | 28.04.2021 | |
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/07] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2021/52] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2021/51] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2021/50] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| PT | 30.08.2021 | ||
| Former [2021/49] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| Former [2021/47] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| Former [2021/46] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| LT | 28.04.2021 | Documents cited: | Search | [XI] WO2009120984 (KOPIN CORP et al.) [X] 1-4,7,9,10,12,14,15 * page 9, line 15 - page 35, line 5 *[I] 5,6,8,11,13 | [X] US2011151922 (VENTEICHER CHRIS et al.) [X] 1,9,14 * paragraph [0015] - paragraph [0045] * | [X] US2007035517 (CHEN IOU-DIN JEAN et al.) [X] 1,9,14 * the whole document * | [A] TW201018101 (JOW TONG TECHNOLOGY CO LTD et al.) [A] 1-15 * abstract * | International search | [XY] US2012297226 (MUCIGNAT ANDREA et al.) [X] 1-13 * See paragraphs [0017]-[0038], [0060]-[0071] and figures 1-3B. *[Y] 14-15 | [Y] US2015095465 (YEH JUNG-HSIN et al.) [Y] 14-15 * See paragraphs [0020]-[0024] and figures 2A-2B. * | [A] KR20110008608 (LG ELECTRONICS INC et al.) [A] 1-15 * See abstract, paragraphs [0036]-[0053] and figures 5-7. * | [A] US2009298420 (HAARTSEN JACOBUS CORNELIS et al.) [A] 1-15 * See abstract, paragraphs [0033]-[0066] and figures 1-5. * | [A] US2013035049 (SMIT RAYMOND MAURICE et al.) [A] 1-15 * See abstract, paragraphs [0051]-[0072] and figures 1-2c. * | by applicant | WO2009120984 | US2011151922 | US2007035517 |