EP3464816 - APPARATUS FOR MEASURING A PIPE WITHIN AN OIL WELL STRUCTURE [Right-click to bookmark this link] | |||
Former [2019/15] | APPARATUS AND METHOD FOR MEASURING A PIPE WITHIN AN OIL WELL STRUCTURE | ||
[2021/35] | Status | No opposition filed within time limit Status updated on 20.01.2023 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 11.02.2022 | ||
Former | Grant of patent is intended Status updated on 28.09.2021 | ||
Former | Request for examination was made Status updated on 08.03.2019 | ||
Former | The international publication has been made Status updated on 08.12.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Intelligent Wellhead Systems Inc. 52 26004 TWP RD 544 Sturgeon County, Alberta T8T 0B6 / CA | [2019/15] | Inventor(s) | 01 /
CARLSON, Aaron Mitchell 13287 Carrs Landing Road Lake Country, British Columbia V4V 1A2 / CA | 02 /
MARTIN, Bradley Robert 26304 Township Road 374 Red Deer, Alberta T4E 1P4 / CA | [2019/15] | Representative(s) | Letzelter, Felix Phillip Meissner Bolte Patentanwälte Rechtsanwälte Partnerschaft mbB Widenmayerstraße 47 80538 München / DE | [2019/15] | Application number, filing date | 16903375.0 | 31.05.2016 | [2019/15] | WO2016CA50615 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017205955 | Date: | 07.12.2017 | Language: | EN | [2017/49] | Type: | A1 Application with search report | No.: | EP3464816 | Date: | 10.04.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.12.2017 takes the place of the publication of the European patent application. | [2019/15] | Type: | B1 Patent specification | No.: | EP3464816 | Date: | 16.03.2022 | Language: | EN | [2022/11] | Search report(s) | International search report - published on: | CA | 07.12.2017 | (Supplementary) European search report - dispatched on: | EP | 20.01.2020 | Classification | IPC: | E21B47/085, G01B7/12, G01R33/07, E21B47/09 | [2020/08] | CPC: |
G01B7/12 (EP);
E21B47/085 (RU);
E21B47/092 (EP,RU);
G01R33/07 (EP)
|
Former IPC [2019/15] | E21B47/085, G01B7/12, G01R33/07 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VORRICHTUNG ZUM MESSEN EINES ROHRES IN EINER ÖLBOHRLOCHSTRUKTUR | [2021/35] | English: | APPARATUS FOR MEASURING A PIPE WITHIN AN OIL WELL STRUCTURE | [2021/35] | French: | APPAREIL DE MESURE D'UN TUYAU DANS UNE STRUCTURE DE PUITS DE PÉTROLE | [2021/35] |
Former [2019/15] | VORRICHTUNG UND VERFAHREN ZUM MESSEN EINES ROHRES IN EINER ÖLBOHRLOCHSTRUKTUR | ||
Former [2019/15] | APPARATUS AND METHOD FOR MEASURING A PIPE WITHIN AN OIL WELL STRUCTURE | ||
Former [2019/15] | APPAREIL ET PROCÉDÉ DE MESURE DE TUYAU DANS UNE STRUCTURE DE PUITS DE PÉTROLE | Entry into regional phase | 09.11.2018 | National basic fee paid | 09.11.2018 | Search fee paid | 09.11.2018 | Designation fee(s) paid | 09.11.2018 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 09.11.2018 | Examination requested [2019/15] | 17.08.2020 | Amendment by applicant (claims and/or description) | 29.09.2021 | Communication of intention to grant the patent | 08.02.2022 | Fee for grant paid | 08.02.2022 | Fee for publishing/printing paid | 08.02.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 19.12.2022 | No opposition filed within time limit [2023/08] | Fees paid | Renewal fee | 09.11.2018 | Renewal fee patent year 03 | 06.08.2019 | Renewal fee patent year 04 | 28.05.2020 | Renewal fee patent year 05 | 13.05.2021 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 31.05.2019 | 04   M06   Fee paid on   06.08.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.05.2016 | AL | 16.03.2022 | AT | 16.03.2022 | CY | 16.03.2022 | CZ | 16.03.2022 | DK | 16.03.2022 | EE | 16.03.2022 | ES | 16.03.2022 | FI | 16.03.2022 | HR | 16.03.2022 | IT | 16.03.2022 | LT | 16.03.2022 | LV | 16.03.2022 | MC | 16.03.2022 | MK | 16.03.2022 | NL | 16.03.2022 | PL | 16.03.2022 | RO | 16.03.2022 | RS | 16.03.2022 | SE | 16.03.2022 | SI | 16.03.2022 | SK | 16.03.2022 | SM | 16.03.2022 | TR | 16.03.2022 | BE | 31.05.2022 | CH | 31.05.2022 | IE | 31.05.2022 | LI | 31.05.2022 | LU | 31.05.2022 | BG | 16.06.2022 | NO | 16.06.2022 | GR | 17.06.2022 | IS | 16.07.2022 | PT | 18.07.2022 | DE | 01.12.2022 | [2024/29] |
Former [2024/22] | HU | 31.05.2016 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CY | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
MK | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
IE | 31.05.2022 | ||
LI | 31.05.2022 | ||
LU | 31.05.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
DE | 01.12.2022 | ||
Former [2024/20] | HU | 31.05.2016 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CY | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
IE | 31.05.2022 | ||
LI | 31.05.2022 | ||
LU | 31.05.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
DE | 01.12.2022 | ||
Former [2024/18] | HU | 31.05.2016 | |
AL | 16.03.2022 | ||
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
IE | 31.05.2022 | ||
LI | 31.05.2022 | ||
LU | 31.05.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
DE | 01.12.2022 | ||
Former [2023/35] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
IT | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
IE | 31.05.2022 | ||
LI | 31.05.2022 | ||
LU | 31.05.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
DE | 01.12.2022 | ||
Former [2023/25] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
IE | 31.05.2022 | ||
LI | 31.05.2022 | ||
LU | 31.05.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
DE | 01.12.2022 | ||
Former [2023/23] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
CH | 31.05.2022 | ||
IE | 31.05.2022 | ||
LI | 31.05.2022 | ||
LU | 31.05.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
DE | 01.12.2022 | ||
Former [2023/20] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
CH | 31.05.2022 | ||
IE | 31.05.2022 | ||
LI | 31.05.2022 | ||
LU | 31.05.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/10] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SI | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
LU | 31.05.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/09] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
LU | 31.05.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/08] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
LU | 31.05.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/07] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
DK | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/06] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
MC | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2023/01] | AL | 16.03.2022 | |
AT | 16.03.2022 | ||
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2022/51] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
IS | 16.07.2022 | ||
PT | 18.07.2022 | ||
Former [2022/50] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
NL | 16.03.2022 | ||
PL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/49] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
NL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SK | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/48] | AT | 16.03.2022 | |
CZ | 16.03.2022 | ||
EE | 16.03.2022 | ||
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
NL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/47] | AT | 16.03.2022 | |
ES | 16.03.2022 | ||
FI | 16.03.2022 | ||
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
NL | 16.03.2022 | ||
RO | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
SM | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
PT | 18.07.2022 | ||
Former [2022/44] | FI | 16.03.2022 | |
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
NL | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
Former [2022/39] | FI | 16.03.2022 | |
HR | 16.03.2022 | ||
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
Former [2022/36] | HR | 16.03.2022 | |
LT | 16.03.2022 | ||
LV | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
GR | 17.06.2022 | ||
Former [2022/35] | HR | 16.03.2022 | |
LT | 16.03.2022 | ||
RS | 16.03.2022 | ||
SE | 16.03.2022 | ||
BG | 16.06.2022 | ||
NO | 16.06.2022 | ||
Former [2022/33] | LT | 16.03.2022 | |
NO | 16.06.2022 | Documents cited: | Search | [XYI]US6720764 (RELTON MAHENDRAN S [US], et al) [X] 1-3,5-8,10,14-16 * abstract; page 1, line 12 - line 17; figures 1,2,5 * * column 5, line 41 - column 6, line 12 * * column 6, line 39 - line 59 * * column 8, line 55 - line 57 * * column 9, line 40 - line 65 * * column 16, line 15 - line 18 * [Y] 9,17 [I] 4,11-13,18,19; | [Y]EP2893137 (CARLSON AARON MITCHELL [CA]) [Y] 9* figure 3 *; | [Y]WO2015145130 (GEOPROBER DRILLING LTD [GB]) [Y] 17 * figure 8 * | International search | [A]US3284701 (DOYCE KERBOW ODIS) [A] 1-19 *see abstract and figures *; | [A]CA1029810 (SCHLUMBERGER CA LTD) [A] 1-19 *see abstract and figures *; | [A]CA2448172 (U S A INC [US]) [A] 1-19 *see abstract and figures *; | [Y]CN1804371 (UNIV SHANDONG SCIENCE & TECH [CN]) [Y] 1-19 *see abstract and figure 2 *; | [A]CN2818777Y (JILIN UNIVL [CN]) [A] 1-19 *see abstract and figures *; | [A]RU2401383 (MALJUGA ANATOLIJ GEORGIEVICH [RU]) [A] 1-19*see abstract and figures *; | [Y]CA2882598 (CARLSON AARON MITCHELL [CA]) [Y] 1-19 *see entire document *; | [A]CA2915632 (HALLIBURTON ENERGY SERVICES INC [US]) [A] 1-19 *see abstract and figures * |