EP3469185 - MULTISTAGE PROCESSING AND INVERSION OF CORROSION DETECTION TOOLS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.03.2024 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 07.04.2023 | ||
Former | Grant of patent is intended Status updated on 12.01.2023 | ||
Former | Request for examination was made Status updated on 15.03.2019 | ||
Former | The international publication has been made Status updated on 17.02.2018 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Halliburton Energy Services, Inc. 3000 N. Sam Houston Parkway E. Houston, TX 77032-3219 / US | [2019/16] | Inventor(s) | 01 /
FOUDA, Ahmed Elsayed 9717 Cypresswood Drive 1922 Houston, Texas 77070 / US | 02 /
GUNER, Baris 3206 Revere Street Apt. 306 Houston, Texas 77098 / US | 03 /
SAN MARTIN, Luis Emilio 306 South Gate Stone Houston, Texas 77007 / US | [2019/16] | Representative(s) | McWilliams, David John Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [2023/19] |
Former [2019/16] | McWilliams, David John Withers & Rogers LLP 4 More London Riverside London SE1 2AU / GB | Application number, filing date | 16912851.9 | 12.08.2016 | [2019/16] | WO2016US46836 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018031038 | Date: | 15.02.2018 | Language: | EN | [2018/07] | Type: | A1 Application with search report | No.: | EP3469185 | Date: | 17.04.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.02.2018 takes the place of the publication of the European patent application. | [2019/16] | Type: | B1 Patent specification | No.: | EP3469185 | Date: | 10.05.2023 | Language: | EN | [2023/19] | Search report(s) | International search report - published on: | KR | 15.02.2018 | (Supplementary) European search report - dispatched on: | EP | 24.01.2020 | Classification | IPC: | E21B47/00, G01V3/18, G01V13/00, E21B47/09, G01N27/82 | [2020/09] | CPC: |
G01B7/06 (EP);
E21B47/006 (EP,US);
E21B47/002 (US);
E21B47/0025 (EP,US);
E21B47/08 (US);
E21B47/092 (EP);
E21B47/113 (EP,US);
G01B7/12 (EP);
G01B7/13 (EP);
|
Former IPC [2019/16] | E21B47/00, G01V3/18, G01V13/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | MEHRSTUFIGE VERARBEITUNG UND INVERSION VON KORROSIONSERKENNUNGSWERKZEUGEN | [2019/16] | English: | MULTISTAGE PROCESSING AND INVERSION OF CORROSION DETECTION TOOLS | [2019/16] | French: | TRAITEMENT ET INVERSION EN PLUSIEURS ÉTAPES PAR DES OUTILS DE DÉTECTION DE CORROSION | [2019/16] | Entry into regional phase | 11.01.2019 | National basic fee paid | 11.01.2019 | Search fee paid | 11.01.2019 | Designation fee(s) paid | 11.01.2019 | Examination fee paid | Examination procedure | deleted | Date on which the examining division has become responsible | 11.01.2019 | Examination requested [2019/16] | 18.06.2020 | Amendment by applicant (claims and/or description) | 13.01.2023 | Communication of intention to grant the patent | 27.03.2023 | Fee for grant paid | 27.03.2023 | Fee for publishing/printing paid | 27.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 13.02.2024 | No opposition filed within time limit [2024/16] | Fees paid | Renewal fee | 11.01.2019 | Renewal fee patent year 03 | 04.06.2019 | Renewal fee patent year 04 | 26.06.2020 | Renewal fee patent year 05 | 03.06.2021 | Renewal fee patent year 06 | 03.06.2022 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 10.05.2023 | CZ | 10.05.2023 | DK | 10.05.2023 | EE | 10.05.2023 | ES | 10.05.2023 | FI | 10.05.2023 | HR | 10.05.2023 | IT | 10.05.2023 | LT | 10.05.2023 | LV | 10.05.2023 | MC | 10.05.2023 | NL | 10.05.2023 | PL | 10.05.2023 | RO | 10.05.2023 | RS | 10.05.2023 | SE | 10.05.2023 | SI | 10.05.2023 | SK | 10.05.2023 | SM | 10.05.2023 | NO | 10.08.2023 | GR | 11.08.2023 | LU | 12.08.2023 | CH | 31.08.2023 | IS | 10.09.2023 | PT | 11.09.2023 | [2024/26] |
Former [2024/24] | AT | 10.05.2023 | |
CZ | 10.05.2023 | ||
DK | 10.05.2023 | ||
EE | 10.05.2023 | ||
ES | 10.05.2023 | ||
FI | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
MC | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RO | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
SI | 10.05.2023 | ||
SK | 10.05.2023 | ||
SM | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
LU | 12.08.2023 | ||
CH | 31.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2024/21] | AT | 10.05.2023 | |
CZ | 10.05.2023 | ||
DK | 10.05.2023 | ||
EE | 10.05.2023 | ||
ES | 10.05.2023 | ||
FI | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
MC | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RO | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
SK | 10.05.2023 | ||
SM | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
LU | 12.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2024/16] | AT | 10.05.2023 | |
CZ | 10.05.2023 | ||
DK | 10.05.2023 | ||
EE | 10.05.2023 | ||
ES | 10.05.2023 | ||
FI | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
MC | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RO | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
SK | 10.05.2023 | ||
SM | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2024/10] | AT | 10.05.2023 | |
CZ | 10.05.2023 | ||
DK | 10.05.2023 | ||
EE | 10.05.2023 | ||
ES | 10.05.2023 | ||
FI | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RO | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
SK | 10.05.2023 | ||
SM | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2024/08] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
FI | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
SK | 10.05.2023 | ||
SM | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2024/03] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
FI | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2024/01] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
HR | 10.05.2023 | ||
LT | 10.05.2023 | ||
LV | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2023/51] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
HR | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
RS | 10.05.2023 | ||
SE | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2023/50] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
NL | 10.05.2023 | ||
PL | 10.05.2023 | ||
SE | 10.05.2023 | ||
NO | 10.08.2023 | ||
GR | 11.08.2023 | ||
IS | 10.09.2023 | ||
PT | 11.09.2023 | ||
Former [2023/48] | AT | 10.05.2023 | |
ES | 10.05.2023 | ||
NL | 10.05.2023 | ||
SE | 10.05.2023 | ||
NO | 10.08.2023 | ||
PT | 11.09.2023 | ||
Former [2023/46] | ES | 10.05.2023 | |
PT | 11.09.2023 | Documents cited: | Search | [XA]US2016187523 (SANMARTIN LUIS EMILIO [US], et al) [X] 14,15 * paragraphs [0027] - [0029] - [0 72] - [0078]; figures 1,4a-4c,11,12 *[A] 1,7 | International search | [A]US4878180 (MCWHIRTER VERNIE C [US], et al) [A] 1-20* See column 5, lines 40-58 and figures 1-4. *; | [A]US2013193953 (YARBRO GREGORY SCOTT [US], et al) [A] 1-20 * See paragraphs [0046]-[0052] and figures 5A-5F. *; | [A]WO2015023386 (HALLIBURTON ENERGY SERV INC [US]) [A] 1-20 * See paragraphs [0046]-[0048] and figure 6. *; | [XA]WO2016007883 (HALLIBURTON ENERGY SERVICES INC [US]) [X] 19-20 * See page 3, line 23 - page 5, line 24, page 11, lines 10-16 and figures 1-3. * [A] 1-18; | [A]WO2016010915 (HALLIBURTON ENERGY SERVICES INC [US]) [A] 1-20 * See page 4, lines 9-29, claims 1, 7, and figures 1-2. * | by applicant | US2016187523 |