blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3510759

EP3510759 - MEDIA RAMP WITH FILM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.01.2023
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  04.02.2022
FormerGrant of patent is intended
Status updated on  21.12.2021
FormerRequest for examination was made
Status updated on  03.12.2021
FormerGrant of patent is intended
Status updated on  14.06.2021
FormerRequest for examination was made
Status updated on  14.06.2019
FormerThe international publication has been made
Status updated on  23.03.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Hewlett-Packard Development Company, L.P.
10300 Energy Drive
Spring TX 77389 / US
[2019/29]
Inventor(s)01 / JANCZYK, Michael
16399 W Bernardo Dr.
San Diego, California 92127-1899 / US
02 / LAI, Shannon
16399 W Bernardo Dr.
San Diego, California 92127-1899 / US
03 / SMITH, Ryan M.
16399 W Bernardo Dr.
San Diego, California 92127-1899 / US
04 / CHOU, Mikah
No. 8. R&D Rd.
1 Science-Based Industrial Park
Hsinchu 315 / TW
 [2019/29]
Representative(s)Haseltine Lake Kempner LLP
One Portwall Square
Portwall Lane
Bristol BS1 6BH / GB
[N/P]
Former [2019/29]Haseltine Lake Kempner LLP
Redcliff Quay
120 Redcliff Street
Bristol BS1 6HU / GB
Application number, filing date16915909.212.09.2016
[2019/29]
WO2016US51397
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018048457
Date:15.03.2018
Language:EN
[2018/11]
Type: A1 Application with search report 
No.:EP3510759
Date:17.07.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 15.03.2018 takes the place of the publication of the European patent application.
[2019/29]
Type: B1 Patent specification 
No.:EP3510759
Date:09.03.2022
Language:EN
[2022/10]
Search report(s)International search report - published on:RU15.03.2018
(Supplementary) European search report - dispatched on:EP17.04.2020
ClassificationIPC:H04N1/193, H04N1/00, H04N1/12, H04N1/10
[2021/19]
CPC:
H04N1/00591 (EP); H04N1/123 (US); H04N1/00615 (EP);
H04N1/1017 (EP); H04N1/1235 (EP,US); H04N1/193 (EP)
Former IPC [2020/20]H04N1/00, H04N1/12, H04N1/10
Former IPC [2019/29]H04N1/10
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/29]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:MEDIENRAMPE MIT FOLIE[2019/29]
English:MEDIA RAMP WITH FILM[2019/29]
French:RAMPE DE SUPPORT AVEC FILM[2019/29]
Entry into regional phase11.03.2019National basic fee paid 
11.03.2019Search fee paid 
11.03.2019Designation fee(s) paid 
11.03.2019Examination fee paid 
Examination procedure11.03.2019Examination requested  [2019/29]
29.10.2020Amendment by applicant (claims and/or description)
30.08.2021Communication of intention to grant the patent
02.12.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
22.12.2021Communication of intention to grant the patent
27.01.2022Fee for grant paid
27.01.2022Fee for publishing/printing paid
27.01.2022Receipt of the translation of the claim(s)
Opposition(s)12.12.2022No opposition filed within time limit [2023/07]
Fees paidRenewal fee
11.03.2019Renewal fee patent year 03
19.09.2019Renewal fee patent year 04
17.09.2020Renewal fee patent year 05
21.09.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.09.2016
AL09.03.2022
AT09.03.2022
CY09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
MK09.03.2022
MT09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
IE12.09.2022
LU12.09.2022
BE30.09.2022
CH30.09.2022
LI30.09.2022
[2024/42]
Former [2024/27]HU12.09.2016
AL09.03.2022
AT09.03.2022
CY09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
MK09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
IE12.09.2022
LU12.09.2022
BE30.09.2022
CH30.09.2022
LI30.09.2022
Former [2024/21]HU12.09.2016
AL09.03.2022
AT09.03.2022
CY09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
IE12.09.2022
LU12.09.2022
BE30.09.2022
CH30.09.2022
LI30.09.2022
Former [2024/18]HU12.09.2016
AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
IE12.09.2022
LU12.09.2022
BE30.09.2022
CH30.09.2022
LI30.09.2022
Former [2023/42]AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
IE12.09.2022
LU12.09.2022
BE30.09.2022
CH30.09.2022
LI30.09.2022
Former [2023/35]AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
IT09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
IE12.09.2022
LU12.09.2022
CH30.09.2022
LI30.09.2022
Former [2023/33]AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
IE12.09.2022
LU12.09.2022
Former [2023/30]AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
LU12.09.2022
Former [2023/22]AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
MC09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2023/10]AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SI09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2023/07]AL09.03.2022
AT09.03.2022
CZ09.03.2022
DK09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2023/01]AL09.03.2022
AT09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2022/51]AT09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
IS09.07.2022
PT11.07.2022
Former [2022/50]AT09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
PL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/49]AT09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SK09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/48]AT09.03.2022
CZ09.03.2022
EE09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/47]AT09.03.2022
ES09.03.2022
FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
RO09.03.2022
RS09.03.2022
SE09.03.2022
SM09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
PT11.07.2022
Former [2022/44]FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
NL09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
Former [2022/39]FI09.03.2022
HR09.03.2022
LT09.03.2022
LV09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
Former [2022/36]HR09.03.2022
LT09.03.2022
LV09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
GR10.06.2022
Former [2022/35]HR09.03.2022
LT09.03.2022
RS09.03.2022
SE09.03.2022
BG09.06.2022
NO09.06.2022
Former [2022/33]LT09.03.2022
NO09.06.2022
Documents cited:Search[X]US2006044633  (IWAGO TOSHITAKA [JP], et al) [X] 1-15 * abstract *;
 [A]EP1335575  (CANON KK [JP]) [A] 1-15 * abstract * * paragraphs [0065] , [0046] , [0094] , [0069] , [0084] *;
 [A]US2006158701  (PARK SANG-CHEOL [KR], et al) [A] 1-15 * abstract *
International search[XA]US8072655  (PARK SANG-CHEOL [KR], et al) [X] 1-3, 6-7, 11 * , abstract, claim 1 * [A] 4-5, 8-10, 12-15;
 [A]US8395827  (SHENG THOMAS [TW], et al) [A] 1-15;
 [A]US2008278776  (SHENG THOMAS [TW], et al) [A] 1-15;
 [A]RU41220U  (KONSTANTINOV STANISLAV VYACHESLAVOVICH) [A] 1-15
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.