blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3516684

EP3516684 - METHOD AND APPARATUS FOR CLEANING SUBSTRATES [Right-click to bookmark this link]
Former [2019/31]METHODS AND APPARATUS FOR CLEANING SUBSTRATES
[2020/34]
StatusNo opposition filed within time limit
Status updated on  26.11.2021
Database last updated on 09.09.2024
FormerThe patent has been granted
Status updated on  18.12.2020
FormerGrant of patent is intended
Status updated on  18.08.2020
FormerRequest for examination was made
Status updated on  28.06.2019
FormerThe international publication has been made
Status updated on  30.03.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
ACM Research (Shanghai) Inc.
Bld. 4, No. 1690 Cailun Road Zhangjiang High-Tech Park
Shanghai 201203 / CN
[2019/31]
Inventor(s)01 / WANG, Hui
Bld. 4
No. 1690 Cailun Road
Zhangjiang High-Tech Park
Shanghai 201203 / CN
02 / WANG, Xi
Bld. 4
No. 1690 Cailun Road
Zhangjiang High-Tech Park
Shanghai 201203 / CN
03 / CHEN, Fuping
Bld. 4
No. 1690 Cailun Road
Zhangjiang High-Tech Park
Shanghai 201203 / CN
04 / CHEN, Fufa
Bld. 4
No. 1690 Cailun Road
Zhangjiang High-Tech Park
Shanghai 201203 / CN
05 / WANG, Jian
Bld. 4
No. 1690 Cailun Road
Zhangjiang High-Tech Park
Shanghai 201203 / CN
06 / ZHANG, Xiaoyan
Bld. 4
No. 1690 Cailun Road
Zhangjiang High-Tech Park
Shanghai 201203 / CN
07 / JIN, Yinuo
Bld. 4
No. 1690 Cailun Road
Zhangjiang High-Tech Park
Shanghai 201203 / CN
08 / JIA, Zhaowei
Bld. 4
No. 1690 Cailun Road
Zhangjiang High-Tech Park
Shanghai 201203 / CN
09 / WANG, Jun
Bld. 4
No. 1690 Cailun Road
Zhangjiang High-Tech Park
Shanghai 201203 / CN
10 / LI, Xuejun
Bld. 4
No. 1690 Cailun Road
Zhangjiang High-Tech Park
Shanghai 201203 / CN
 [2019/31]
Representative(s)Osha BWB
2, rue de la Paix
75002 Paris / FR
[N/P]
Former [2019/31]Osha Liang
2, rue de la Paix
75002 Paris / FR
Application number, filing date16916419.120.09.2016
[2019/31]
WO2016CN99428
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018053678
Date:29.03.2018
Language:EN
[2018/13]
Type: A1 Application with search report 
No.:EP3516684
Date:31.07.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 29.03.2018 takes the place of the publication of the European patent application.
[2019/31]
Type: B1 Patent specification 
No.:EP3516684
Date:20.01.2021
Language:EN
[2021/03]
Search report(s)International search report - published on:CN29.03.2018
(Supplementary) European search report - dispatched on:EP04.05.2020
ClassificationIPC:H01L21/67
[2019/31]
CPC:
H01L21/67253 (EP,KR,US); H01L21/02041 (KR); H01L21/67051 (EP,US);
H01L21/02068 (US); H01L21/02307 (KR); H01L21/67028 (KR);
H01L21/67057 (EP,US); H01L21/67098 (KR); H01L21/67248 (KR);
H01L21/68 (US); H01L21/687 (US); Y02P70/50 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/31]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUR REINIGUNG VON SUBSTRATEN[2019/31]
English:METHOD AND APPARATUS FOR CLEANING SUBSTRATES[2020/34]
French:PROCÉDÉ ET DISPOSITIF DE NETTOYAGE DE SUBSTRATS[2020/34]
Former [2019/31]METHODS AND APPARATUS FOR CLEANING SUBSTRATES
Former [2019/31]PROCÉDÉS ET DISPOSITIFS DE NETTOYAGE DE SUBSTRATS
Entry into regional phase19.04.2019National basic fee paid 
19.04.2019Search fee paid 
19.04.2019Designation fee(s) paid 
19.04.2019Examination fee paid 
Examination procedure17.04.2019Amendment by applicant (claims and/or description)
19.04.2019Examination requested  [2019/31]
19.08.2020Communication of intention to grant the patent
02.12.2020Receipt of the translation of the claim(s)
14.12.2020Fee for grant paid
14.12.2020Fee for publishing/printing paid
Opposition(s)21.10.2021No opposition filed within time limit [2021/52]
Fees paidRenewal fee
22.04.2019Renewal fee patent year 03
17.09.2019Renewal fee patent year 04
11.09.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.09.2016
AL20.01.2021
AT20.01.2021
CY20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
IT20.01.2021
LT20.01.2021
LV20.01.2021
MC20.01.2021
MK20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SI20.01.2021
SK20.01.2021
SM20.01.2021
TR20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
IE20.09.2021
LU20.09.2021
CH30.09.2021
LI30.09.2021
[2024/29]
Former [2024/22]HU20.09.2016
AL20.01.2021
AT20.01.2021
CY20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
IT20.01.2021
LT20.01.2021
LV20.01.2021
MC20.01.2021
MK20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SI20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
IE20.09.2021
LU20.09.2021
CH30.09.2021
LI30.09.2021
Former [2023/33]HU20.09.2016
AL20.01.2021
AT20.01.2021
CY20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
IT20.01.2021
LT20.01.2021
LV20.01.2021
MC20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SI20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
IE20.09.2021
LU20.09.2021
CH30.09.2021
LI30.09.2021
Former [2023/30]AL20.01.2021
AT20.01.2021
CY20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
IT20.01.2021
LT20.01.2021
LV20.01.2021
MC20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SI20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
IE20.09.2021
LU20.09.2021
CH30.09.2021
LI30.09.2021
Former [2022/37]AL20.01.2021
AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
IT20.01.2021
LT20.01.2021
LV20.01.2021
MC20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SI20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
IE20.09.2021
LU20.09.2021
CH30.09.2021
LI30.09.2021
Former [2022/35]AL20.01.2021
AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
IT20.01.2021
LT20.01.2021
LV20.01.2021
MC20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SI20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
IE20.09.2021
LU20.09.2021
Former [2022/34]AL20.01.2021
AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
IT20.01.2021
LT20.01.2021
LV20.01.2021
MC20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SI20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
LU20.09.2021
Former [2022/25]AL20.01.2021
AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
IT20.01.2021
LT20.01.2021
LV20.01.2021
MC20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SI20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
Former [2022/23]AL20.01.2021
AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
IT20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SI20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
Former [2022/13]AL20.01.2021
AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SI20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
PT20.05.2021
Former [2022/10]AL20.01.2021
AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
PT20.05.2021
Former [2022/08]AL20.01.2021
AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
ES20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
Former [2022/07]AL20.01.2021
AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
Former [2021/50]AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RO20.01.2021
RS20.01.2021
SE20.01.2021
SK20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
Former [2021/49]AT20.01.2021
CZ20.01.2021
DK20.01.2021
EE20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RS20.01.2021
SE20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
Former [2021/48]AT20.01.2021
CZ20.01.2021
EE20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RS20.01.2021
SE20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
Former [2021/46]AT20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RS20.01.2021
SE20.01.2021
SM20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
Former [2021/42]AT20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RS20.01.2021
SE20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
IS20.05.2021
PT20.05.2021
Former [2021/39]AT20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
PL20.01.2021
RS20.01.2021
SE20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
PT20.05.2021
Former [2021/38]AT20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
RS20.01.2021
SE20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
PT20.05.2021
Former [2021/37]AT20.01.2021
FI20.01.2021
HR20.01.2021
LT20.01.2021
LV20.01.2021
RS20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
PT20.05.2021
Former [2021/36]FI20.01.2021
HR20.01.2021
LT20.01.2021
BG20.04.2021
NO20.04.2021
GR21.04.2021
PT20.05.2021
Former [2021/35]FI20.01.2021
HR20.01.2021
LT20.01.2021
NO20.04.2021
PT20.05.2021
Former [2021/33]FI20.01.2021
LT20.01.2021
NO20.04.2021
PT20.05.2021
Documents cited:Search[A]JPH06292942  (METALLGESELLSCHAFT AG) [A] 1-17 * abstract * * claims 1-6 * * paragraphs [0036] , [0042] * * figures 1-5b *;
 [A]US2006260641  (WU YI [US], et al) [A] 1-17 * abstract * * claims 1-20 ** figures 1-4B *;
 [A]US2009025761  (MATSUMOTO YOUICHIROU [JP], et al) [A] 1-17 * abstract * * claims 1-17 * * paragraphs [0008] , [0009] , [0013] , [0015] , [0019] , [0036] , [0086] , [0088] , [0092] , [0103] , [0105] , [0106] * * figures 1-13 *
International search[A]JPH10235303  (SHIBAURA ENG WORKS LTD) [A] 1-64* the whole document *;
 [A]CN1712144  (TOKYO SHIBAURA ELECTRIC CO [JP]) [A] 1-64 * the whole document *;
 [A]US2012097195  (WANG JIAN [CN], et al) [A] 1-64 * description, paragraphs [0028], [0038]-[0055], claims 1, 15 and figure 1 *;
 [A]CN104576455  (WUXI DEXIN SOLAR POWER CO LTD) [A] 1-64 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.