blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3363539

EP3363539 - METHOD FOR PREPARING MOLECULAR SIEVE-MULTIELEMENT OXIDE COMPOSITE INTEGRALLY EXTRUDED DENITRATION CATALYST [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.10.2023
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  11.11.2022
FormerGrant of patent is intended
Status updated on  23.08.2022
FormerExamination is in progress
Status updated on  09.10.2020
FormerRequest for examination was made
Status updated on  20.07.2018
FormerThe international publication has been made
Status updated on  30.06.2018
Formerunknown
Status updated on  14.04.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Valiant Co., Ltd.
No.11 Wuzhishan Road
Yeda Yantai
Yantai, Shandong 264006 / CN
[2018/34]
Inventor(s)01 / SUN, Li
No.11 Wuzhishan Road
YEDA Yantai
Yantai Shandong 264006 / CN
02 / XU, Yongzhen
No.11 Wuzhishan Road
YEDA Yantai
Yantai Shandong 264006 / CN
03 / LI, Quansheng
No.11 Wuzhishan Road
YEDA Yantai
Yantai Shandong 264006 / CN
04 / LIU, Xiaoling
No.11 Wuzhishan Road
YEDA Yantai
Yantai Shandong 264006 / CN
05 / HU, Baohua
No.11 Wuzhishan Road
YEDA Yantai
Yantai Shandong 264006 / CN
06 / CUI, Ming
No.11 Wuzhishan Road
YEDA Yantai
Yantai Shandong 264006 / CN
07 / TANG, Yingjie
No.11 Wuzhishan Road
YEDA Yantai
Yantai Shandong 264006 / CN
08 / WANG, Yuchang
No.11 Wuzhishan Road
YEDA Yantai
Yantai Shandong 264006 / CN
09 / ZHOU, Zhenlei
No.11 Wuzhishan Road
YEDA Yantai
Yantai Shandong 264006 / CN
 [2018/34]
Representative(s)Rössler, Matthias, et al
Karo IP Patentanwälte PartG mbB
Steinstraße 16-18
40212 Düsseldorf / DE
[N/P]
Former [2022/50]Rössler, Matthias, et al
karo IP Patentanwälte
Kahlhöfer Rößler Kreuels PartG mbB
Postfach 32 01 02
40416 Düsseldorf / DE
Former [2018/34]Rössler, Matthias, et al
Kahlhöfer Rößler Kreuels
Patentanwälte PartG mbB
(Karo IP Professionals)
Postfach 32 01 02
40416 Düsseldorf / DE
Application number, filing date16918110.427.12.2016
[2018/34]
WO2016CN112491
Priority number, dateCN20161120942923.12.2016         Original published format: CN201611209429
[2018/34]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018113004
Date:28.06.2018
Language:ZH
[2018/26]
Type: A1 Application with search report 
No.:EP3363539
Date:22.08.2018
Language:EN
[2018/34]
Type: B1 Patent specification 
No.:EP3363539
Date:14.12.2022
Language:EN
[2022/50]
Search report(s)International search report - published on:CN28.06.2018
(Supplementary) European search report - dispatched on:EP15.07.2019
ClassificationIPC:B01J29/46, B01J29/24, B01J29/78, B01J29/85, B01J37/00, B01D53/86, B01D53/56, B01J23/00, B01J29/76, B01J29/80, B01J29/70, B01J29/16, B01J29/072, B01J29/076, B01J29/83, B01J35/04, B01J35/06, B01J37/08, B01J37/03, B01D53/94, // B01J35/02
[2019/33]
CPC:
B01J29/24 (EP,CN,US); B01J29/46 (EP,CN,US); B01D53/8628 (EP,CN,US);
B01J23/002 (EP,US); B01J29/072 (EP,US); B01J29/076 (EP,US);
B01J29/143 (US); B01J29/146 (US); B01J29/166 (EP,US);
B01J29/26 (US); B01J29/48 (EP,US); B01J29/7065 (EP,US);
B01J29/76 (EP,US); B01J29/7615 (EP,US); B01J29/763 (EP,US);
B01J29/78 (EP,CN,US); B01J29/7815 (EP,US); B01J29/783 (EP,US);
B01J29/80 (EP,US); B01J29/83 (EP,US); B01J29/85 (EP,CN,US);
B01J35/56 (EP,US); B01J35/58 (EP,US); B01J37/00 (CN);
B01J37/0009 (EP,US); B01J37/0018 (EP,US); B01J37/0036 (EP,US);
B01J37/0045 (EP,US); B01J37/009 (EP,US); B01J37/03 (EP,US);
B01J37/04 (US); B01J37/06 (EP,US); B01J37/088 (EP,US);
B01J37/30 (US); B01D2255/2065 (EP,US); B01D2255/20707 (EP,US);
B01D2255/2073 (EP,US); B01D2255/20738 (EP,US); B01D2255/20746 (EP,US);
B01D2255/20753 (EP,US); B01D2255/20761 (EP,US); B01D2255/50 (EP,US);
B01D2255/502 (US); B01D2255/504 (EP,US); B01D2258/0283 (EP,CN,US);
B01J2229/186 (EP,US); B01J2229/20 (EP,US); B01J2523/00 (EP,US);
B01J35/40 (EP,US); B01J35/50 (EP,US) (-)
C-Set:
B01J2523/00, B01J2523/17, B01J2523/22, B01J2523/23, B01J2523/31, B01J2523/41, B01J2523/72, B01J2523/842 (US,EP);
B01J2523/00, B01J2523/17, B01J2523/31, B01J2523/3712, B01J2523/41, B01J2523/47, B01J2523/69, B01J2523/842 (US,EP);
B01J2523/00, B01J2523/17, B01J2523/3712, B01J2523/41, B01J2523/47, B01J2523/68 (EP,US);
B01J2523/00, B01J2523/17, B01J2523/3712, B01J2523/41, B01J2523/47, B01J2523/68, B01J2523/842 (EP,US);
B01J2523/00, B01J2523/17, B01J2523/3712, B01J2523/47, B01J2523/48, B01J2523/69, B01J2523/72, B01J2523/842 (US,EP);
B01J2523/00, B01J2523/17, B01J2523/41, B01J2523/47, B01J2523/68 (US,EP);
B01J2523/00, B01J2523/17, B01J2523/41, B01J2523/47, B01J2523/68, B01J2523/72, B01J2523/842 (EP,US);
B01J2523/00, B01J2523/17, B01J2523/41, B01J2523/47, B01J2523/68, B01J2523/842 (US,EP);
B01J2523/00, B01J2523/17, B01J2523/47, B01J2523/48, B01J2523/842 (US,EP);
B01J2523/00, B01J2523/22, B01J2523/23, B01J2523/31, B01J2523/41, B01J2523/72 (US,EP);
B01J2523/00, B01J2523/31, B01J2523/3712, B01J2523/41, B01J2523/47, B01J2523/48, B01J2523/72 (US,EP);
B01J2523/00, B01J2523/31, B01J2523/3712, B01J2523/41, B01J2523/47, B01J2523/68 (EP,US);
B01J2523/00, B01J2523/31, B01J2523/3712, B01J2523/41, B01J2523/47, B01J2523/68, B01J2523/72 (US,EP);
B01J2523/00, B01J2523/31, B01J2523/3712, B01J2523/41, B01J2523/69 (EP,US);
B01J2523/00, B01J2523/31, B01J2523/3712, B01J2523/41, B01J2523/69, B01J2523/72 (EP,US);
B01J2523/00, B01J2523/31, B01J2523/41, B01J2523/47, B01J2523/69, B01J2523/842 (EP,US);
B01J2523/00, B01J2523/33, B01J2523/3706, B01J2523/3712, B01J2523/41, B01J2523/43, B01J2523/48, B01J2523/845, B01J2523/847 (US,EP);
B01J2523/00, B01J2523/33, B01J2523/3706, B01J2523/41, B01J2523/43, B01J2523/48, B01J2523/845, B01J2523/847 (US,EP);
B01J2523/00, B01J2523/41, B01J2523/47, B01J2523/48, B01J2523/842 (US,EP);
B01J2523/00, B01J2523/47, B01J2523/48, B01J2523/842 (US,EP)
(-)
Former IPC [2018/34]B01J29/46, B01J29/24, B01J29/78, B01J29/85, B01J37/00, B01D53/86, B01D53/56
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/34]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES EINSTÜCKIG EXTRUDIERTEN MOLEKULARSIEB-MULTIELEMENTOXIDVERBUNDDENITRIERUNGSKATALYSATORS[2022/37]
English:METHOD FOR PREPARING MOLECULAR SIEVE-MULTIELEMENT OXIDE COMPOSITE INTEGRALLY EXTRUDED DENITRATION CATALYST[2018/34]
French:PROCÉDÉ DE PRÉPARATION D'UN CATALYSEUR DE DÉNITRATION COMPRENANT UN COMPOSITE D'OXYDE MULTI-ÉLÉMENTS ET UN TAMIS MOLÉCULAIRE[2022/37]
Former [2018/34]VERFAHREN ZUR HERSTELLUNG EINES MEHRTEILIGEN, EINSTÜCKIG EXTRUDIERTEN MOLEKULARSIEB-OXIDVERBUNDDENITRIERUNGSKATALYSATORS
Former [2018/34]PROCÉDÉ DE PRÉPARATION D'UN CATALYSEUR DE DÉNITRATION COMPOSITE D'OXYDE MULTI-ÉLÉMENTS À TAMIS MOLÉCULAIRE
Entry into regional phase13.04.2018Translation filed 
13.04.2018National basic fee paid 
13.04.2018Search fee paid 
13.04.2018Designation fee(s) paid 
13.04.2018Examination fee paid 
Examination procedure13.04.2018Examination requested  [2018/34]
13.04.2018Date on which the examining division has become responsible
15.11.2019Amendment by applicant (claims and/or description)
13.10.2020Despatch of a communication from the examining division (Time limit: M04)
04.12.2020Reply to a communication from the examining division
24.08.2022Communication of intention to grant the patent
02.11.2022Fee for grant paid
02.11.2022Fee for publishing/printing paid
02.11.2022Receipt of the translation of the claim(s)
Opposition(s)15.09.2023No opposition filed within time limit [2023/47]
Fees paidRenewal fee
21.12.2018Renewal fee patent year 03
23.12.2019Renewal fee patent year 04
18.12.2020Renewal fee patent year 05
18.12.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.12.2016
AL14.12.2022
AT14.12.2022
BG14.12.2022
CY14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
IT14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
MK14.12.2022
MT14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
IE27.12.2022
LU27.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
[2024/42]
Former [2024/34]HU27.12.2016
AL14.12.2022
AT14.12.2022
BG14.12.2022
CY14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
IT14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
MK14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
IE27.12.2022
LU27.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2024/27]HU27.12.2016
AL14.12.2022
AT14.12.2022
CY14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
IT14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
MK14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
IE27.12.2022
LU27.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2024/26]HU27.12.2016
AL14.12.2022
AT14.12.2022
CY14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
IT14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
IE27.12.2022
LU27.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2024/21]HU27.12.2016
AL14.12.2022
AT14.12.2022
CY14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
IE27.12.2022
LU27.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2024/18]HU27.12.2016
AL14.12.2022
AT14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
IE27.12.2022
LU27.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/51]AL14.12.2022
AT14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SI14.12.2022
SK14.12.2022
SM14.12.2022
IE27.12.2022
LU27.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/49]AL14.12.2022
AT14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SK14.12.2022
SM14.12.2022
IE27.12.2022
LU27.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/48]AL14.12.2022
AT14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SK14.12.2022
SM14.12.2022
IE27.12.2022
LU27.12.2022
CH31.12.2022
LI31.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/47]AL14.12.2022
AT14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SK14.12.2022
SM14.12.2022
LU27.12.2022
CH31.12.2022
LI31.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/46]AL14.12.2022
AT14.12.2022
CZ14.12.2022
DK14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SK14.12.2022
SM14.12.2022
LU27.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/44]AL14.12.2022
AT14.12.2022
CZ14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
MC14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SK14.12.2022
SM14.12.2022
LU27.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/39]AL14.12.2022
AT14.12.2022
CZ14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SK14.12.2022
SM14.12.2022
LU27.12.2022
NO14.03.2023
GR15.03.2023
IS14.04.2023
PT14.04.2023
Former [2023/38]AL14.12.2022
AT14.12.2022
CZ14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
PL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SK14.12.2022
SM14.12.2022
LU27.12.2022
NO14.03.2023
GR15.03.2023
PT14.04.2023
Former [2023/37]AL14.12.2022
AT14.12.2022
CZ14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SM14.12.2022
NO14.03.2023
GR15.03.2023
PT14.04.2023
Former [2023/35]AT14.12.2022
CZ14.12.2022
EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
RO14.12.2022
RS14.12.2022
SE14.12.2022
SM14.12.2022
NO14.03.2023
GR15.03.2023
PT14.04.2023
Former [2023/34]EE14.12.2022
ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
RS14.12.2022
SE14.12.2022
SM14.12.2022
NO14.03.2023
GR15.03.2023
PT14.04.2023
Former [2023/33]ES14.12.2022
FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
RS14.12.2022
SE14.12.2022
SM14.12.2022
NO14.03.2023
GR15.03.2023
Former [2023/29]FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
NL14.12.2022
RS14.12.2022
SE14.12.2022
NO14.03.2023
GR15.03.2023
Former [2023/27]FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
RS14.12.2022
SE14.12.2022
NO14.03.2023
GR15.03.2023
Former [2023/24]FI14.12.2022
HR14.12.2022
LT14.12.2022
LV14.12.2022
SE14.12.2022
NO14.03.2023
GR15.03.2023
Former [2023/23]FI14.12.2022
LT14.12.2022
LV14.12.2022
SE14.12.2022
NO14.03.2023
GR15.03.2023
Former [2023/22]FI14.12.2022
LT14.12.2022
SE14.12.2022
NO14.03.2023
Former [2023/20]LT14.12.2022
NO14.03.2023
Documents cited:Search[A]GB2493449  (JOHNSON MATTHEY PLC [GB]);
 [A]CN105562077  (WUXI WEIFU ENV PROT CATALYST CO LTD)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.