EP3531554 - MOTOR CONTROL DEVICE AND ELECTRIC POWER STEERING CONTROL DEVICE EQUIPPED WITH SAID MOTOR CONTROL DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.03.2022 Database last updated on 12.06.2024 | |
Former | The patent has been granted Status updated on 03.04.2021 | ||
Former | Grant of patent is intended Status updated on 26.11.2020 | ||
Former | Request for examination was made Status updated on 26.07.2019 | ||
Former | The international publication has been made Status updated on 18.05.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Mitsubishi Electric Corporation 7-3, Marunouchi 2-chome Chiyoda-ku Tokyo 100-8310 / JP | [2019/35] | Inventor(s) | 01 /
MORI, Tatsuya c/o Mitsubishi Electric Corporation 7-3 Marunouchi 2-chome Chiyoda-ku Tokyo 100-8310 / JP | 02 /
FURUKAWA, Akira c/o Mitsubishi Electric Corporation 7-3 Marunouchi 2-chome Chiyoda-ku Tokyo 100-8310 / JP | 03 /
KEZOBO, Isao c/o Mitsubishi Electric Corporation 7-3 Marunouchi 2-chome Chiyoda-ku Tokyo 100-8310 / JP | [2019/35] | Representative(s) | Brevalex Tour Trinity 1 B Place de la Défense 92400 Courbevoie / FR | [N/P] |
Former [2019/35] | Brevalex 95, rue d'Amsterdam 75378 Paris Cedex 8 / FR | Application number, filing date | 16921423.6 | 14.11.2016 | [2019/35] | WO2016JP83683 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018087917 | Date: | 17.05.2018 | Language: | JA | [2018/20] | Type: | A1 Application with search report | No.: | EP3531554 | Date: | 28.08.2019 | Language: | EN | [2019/35] | Type: | B1 Patent specification | No.: | EP3531554 | Date: | 05.05.2021 | Language: | EN | [2021/18] | Search report(s) | International search report - published on: | JP | 17.05.2018 | (Supplementary) European search report - dispatched on: | EP | 19.09.2019 | Classification | IPC: | H02P25/22, H02P6/28 | [2019/43] | CPC: |
H02P6/28 (EP,US);
B62D5/0481 (US);
H02M1/4216 (US);
H02M7/64 (US);
H02P21/22 (US);
H02P27/08 (US);
H02M1/0016 (US)
(-)
|
Former IPC [2019/35] | H02P25/22 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/35] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | MOTORSTEUERUNGSVORRICHTUNG UND STEUERUNGSVORRICHTUNG EINER ELEKTRISCHEN SERVOLENKVORRICHTUNG MIT DIESER MOTORSTEUERUNGSVORRICHTUNG | [2019/35] | English: | MOTOR CONTROL DEVICE AND ELECTRIC POWER STEERING CONTROL DEVICE EQUIPPED WITH SAID MOTOR CONTROL DEVICE | [2019/35] | French: | DISPOSITIF DE COMMANDE DE MOTEUR ET DISPOSITIF DE COMMANDE DE DIRECTION ASSISTÉE ÉLECTRIQUE ÉQUIPÉ DUDIT DISPOSITIF DE COMMANDE DE MOTEUR | [2019/35] | Entry into regional phase | 09.05.2019 | Translation filed | 09.05.2019 | National basic fee paid | 09.05.2019 | Search fee paid | 09.05.2019 | Designation fee(s) paid | 09.05.2019 | Examination fee paid | Examination procedure | 09.05.2019 | Examination requested [2019/35] | 07.04.2020 | Amendment by applicant (claims and/or description) | 27.11.2020 | Communication of intention to grant the patent | 25.03.2021 | Fee for grant paid | 25.03.2021 | Fee for publishing/printing paid | 25.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.02.2022 | No opposition filed within time limit [2022/15] | Fees paid | Renewal fee | 20.05.2019 | Renewal fee patent year 03 | 25.10.2019 | Renewal fee patent year 04 | 13.11.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.11.2016 | AL | 05.05.2021 | AT | 05.05.2021 | CY | 05.05.2021 | CZ | 05.05.2021 | DK | 05.05.2021 | EE | 05.05.2021 | ES | 05.05.2021 | FI | 05.05.2021 | HR | 05.05.2021 | IT | 05.05.2021 | LT | 05.05.2021 | LV | 05.05.2021 | MC | 05.05.2021 | MK | 05.05.2021 | NL | 05.05.2021 | PL | 05.05.2021 | RO | 05.05.2021 | RS | 05.05.2021 | SE | 05.05.2021 | SI | 05.05.2021 | SK | 05.05.2021 | SM | 05.05.2021 | BG | 05.08.2021 | NO | 05.08.2021 | GR | 06.08.2021 | IS | 05.09.2021 | PT | 06.09.2021 | GB | 14.11.2021 | IE | 14.11.2021 | LU | 14.11.2021 | BE | 30.11.2021 | CH | 30.11.2021 | LI | 30.11.2021 | [2024/22] |
Former [2023/33] | HU | 14.11.2016 | |
AL | 05.05.2021 | ||
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 14.11.2021 | ||
IE | 14.11.2021 | ||
LU | 14.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2023/30] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 14.11.2021 | ||
IE | 14.11.2021 | ||
LU | 14.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/48] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 14.11.2021 | ||
IE | 14.11.2021 | ||
LU | 14.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/47] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
GB | 14.11.2021 | ||
LU | 14.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/37] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
LU | 14.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/36] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
IT | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
LU | 14.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/34] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
LU | 14.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/33] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
BE | 30.11.2021 | ||
Former [2022/29] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/26] | AL | 05.05.2021 | |
AT | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/23] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/10] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/08] | AT | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
ES | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/07] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/04] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
NL | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/52] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
PL | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/51] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/50] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
Former [2021/49] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
Former [2021/47] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | ||
BG | 05.08.2021 | ||
Former [2021/46] | AT | 05.05.2021 | |
FI | 05.05.2021 | ||
LT | 05.05.2021 | Documents cited: | Search | [Y]JP5760830B (DENSO CORP) [Y] 7* paragraph [0027]; figure 2 *; | [XY]WO2015166528 (MITSUBISHI ELECTRIC CORP [JP]) [X] 1-3,5,6 * the whole document * [Y] 7; | US2017019048 [ ] (FURUKAWA AKIRA [JP], et al) [ ] * paragraph [0049] - paragraph [0055]; figure 1 * * paragraphs [0073] , [0074] , [0076] , [0077] * * equation 3; paragraph [0074] * * claim 19 * | International search | [A]JPH04325893 (HITACHI LTD) [A] 1-7* , paragraph [0006]; fig. 1 (Family: none) *; | [A]JP2003153585 (MITSUBISHI ELECTRIC CORP) [A] 1-7 * , paragraph [0013] & US 2003/0085683 A1 paragraph [0017] & KR 10-2003-0038326 A & CN 1417936 A *; | [Y]WO2015166528 (MITSUBISHI ELECTRIC CORP [JP]) [Y] 1-7 * , paragraphs [0019] to [0132]; fig. 1 to 13 (Family: none) *; | [Y]WO2016009976 (NSK LTD [JP]) [Y] 1-7 * , paragraphs [0019] to [0066]; fig. 1 to 9 & JP 2016-21803 A * | by applicant | JP5954366B |