EP3190664 - ELECTRICAL APPARATUS WITH CONNECTION TERMINAL PROVIDED WITH A CLAMPING CAGE MADE OF NON-MAGNETIC MATERIAL [Right-click to bookmark this link] | |||
Former [2017/28] | CONNECTION TERMINAL FOR ELECTRICAL APPARATUS PROVIDED WITH A CLAMPING CAGE MADE OF NON-MAGNETIC MATERIAL | ||
[2020/19] | Status | No opposition filed within time limit Status updated on 09.07.2021 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 31.07.2020 | ||
Former | Grant of patent is intended Status updated on 12.05.2020 | ||
Former | Examination is in progress Status updated on 02.11.2018 | ||
Former | Request for examination was made Status updated on 19.01.2018 | ||
Former | The application has been published Status updated on 15.06.2017 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states TE Connectivity Services GmbH Mühlenstrasse 26 8200 Schaffhausen / CH | [2020/47] |
Former [2020/09] | For all designated states TE Connectivity Services GmbH Rheinstrasse 20 8200 Schaffhausen / CH | ||
Former [2019/10] | For all designated states Tyco Electronics Services GmbH Rheinstrasse 20 8200 Schaffhausen / CH | ||
Former [2017/28] | For all designated states ABB Schweiz AG Brown Boveri Strasse 6 5400 Baden / CH | Inventor(s) | 01 /
FONTAINE, Philippe 2 allée des Ifs 69960 Corbas / FR | 02 /
FAYARD, François 1B rue Fleury Salignat 69140 Rillieux La Pape / FR | [2017/28] | Representative(s) | Verriest, Philippe, et al Cabinet Germain & Maureau 12, rue Boileau BP 6153 69466 Lyon Cedex 06 / FR | [2017/28] | Application number, filing date | 17150057.2 | 02.01.2017 | [2017/28] | Priority number, date | FR20160050145 | 08.01.2016 Original published format: FR 1650145 | [2017/28] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3190664 | Date: | 12.07.2017 | Language: | FR | [2017/28] | Type: | B1 Patent specification | No.: | EP3190664 | Date: | 02.09.2020 | Language: | FR | [2020/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.05.2017 | Classification | IPC: | H01R4/36, H01R4/58, // H01R9/26 | [2017/28] | CPC: |
H01R4/363 (EP);
H01R4/36 (CN);
H01R4/58 (EP);
H01R9/26 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/08] |
Former [2017/28] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ELEKTROGERÄT MIT ANSCHLUSSKLEMME, DIE MIT EINEM KLEMMKÄFIG AUS NICHT-MAGNETISCHEM MATERIAL AUSGESTATTET IST | [2020/19] | English: | ELECTRICAL APPARATUS WITH CONNECTION TERMINAL PROVIDED WITH A CLAMPING CAGE MADE OF NON-MAGNETIC MATERIAL | [2020/19] | French: | APPAREIL ÉLECTRIQUE AVEC BORNE DE CONNEXION ÉQUIPÉE D'UNE CAGE DE SERRAGE EN MATÉRIAU AMAGNÉTIQUE | [2020/19] |
Former [2017/28] | ANSCHLUSSKLEMME FÜR ELEKTROGERÄT, DIE MIT EINEM KLEMMKÄFIG AUS NICHT-MAGNETISCHEM MATERIAL AUSGESTATTET IST | ||
Former [2017/28] | CONNECTION TERMINAL FOR ELECTRICAL APPARATUS PROVIDED WITH A CLAMPING CAGE MADE OF NON-MAGNETIC MATERIAL | ||
Former [2017/28] | BORNE DE CONNEXION POUR APPAREIL ÉLECTRIQUE ÉQUIPÉE D'UNE CAGE DE SERRAGE EN MATÉRIAU AMAGNÉTIQUE | Examination procedure | 02.01.2017 | Date on which the examining division has become responsible | 11.01.2018 | Amendment by applicant (claims and/or description) | 11.01.2018 | Examination requested [2018/08] | 24.10.2018 | Despatch of a communication from the examining division (Time limit: M06) | 23.04.2019 | Reply to a communication from the examining division | 13.05.2020 | Communication of intention to grant the patent | 21.07.2020 | Fee for grant paid | 21.07.2020 | Fee for publishing/printing paid | 21.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2021 | No opposition filed within time limit [2021/32] | Fees paid | Renewal fee | 15.01.2019 | Renewal fee patent year 03 | 14.01.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.01.2017 | AL | 02.09.2020 | AT | 02.09.2020 | CY | 02.09.2020 | CZ | 02.09.2020 | DK | 02.09.2020 | EE | 02.09.2020 | ES | 02.09.2020 | FI | 02.09.2020 | HR | 02.09.2020 | IT | 02.09.2020 | LT | 02.09.2020 | LV | 02.09.2020 | MC | 02.09.2020 | MK | 02.09.2020 | PL | 02.09.2020 | RO | 02.09.2020 | RS | 02.09.2020 | SE | 02.09.2020 | SI | 02.09.2020 | SK | 02.09.2020 | SM | 02.09.2020 | NL | 23.09.2020 | BG | 02.12.2020 | NO | 02.12.2020 | GR | 03.12.2020 | IE | 02.01.2021 | IS | 02.01.2021 | LU | 02.01.2021 | PT | 04.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | LI | 31.01.2021 | [2024/22] |
Former [2023/30] | HU | 02.01.2017 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
NL | 23.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IE | 02.01.2021 | ||
IS | 02.01.2021 | ||
LU | 02.01.2021 | ||
PT | 04.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2023/29] | HU | 02.01.2017 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
NL | 23.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IE | 02.01.2021 | ||
IS | 02.01.2021 | ||
LU | 02.01.2021 | ||
PT | 04.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2023/27] | HU | 02.01.2017 | |
AL | 02.09.2020 | ||
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IE | 02.01.2021 | ||
IS | 02.01.2021 | ||
LU | 02.01.2021 | ||
PT | 04.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/34] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IE | 02.01.2021 | ||
IS | 02.01.2021 | ||
LU | 02.01.2021 | ||
PT | 04.01.2021 | ||
BE | 31.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2022/07] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IE | 02.01.2021 | ||
IS | 02.01.2021 | ||
LU | 02.01.2021 | ||
PT | 04.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2021/52] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
LU | 02.01.2021 | ||
PT | 04.01.2021 | ||
CH | 31.01.2021 | ||
LI | 31.01.2021 | ||
Former [2021/48] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
LU | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/43] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
LU | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/40] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/37] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/36] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/28] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SK | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/25] | AL | 02.09.2020 | |
AT | 02.09.2020 | ||
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/24] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/22] | CZ | 02.09.2020 | |
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
SM | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/21] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/10] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
RS | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/09] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/08] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
Former [2021/07] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
NO | 02.12.2020 | Documents cited: | Search | [I]US2938191 (KOBRYNER HERMAN H, et al) [I] 1-10 * column 2, lines 5-17,42-56 * * column 3, lines 13-15 * * figures 1,2 *; | [XI]EP0687032 (SCHNEIDER ELECTRIC SA [FR]) [X] 1-5,7-9 * column 2, lines 9-39; figures 1-4 * [I] 6,10; | [Y]EP0848452 (ENTRELEC SA [FR]) [Y] 7-10 * column 3, line 55 - column 4, line 32 * * column 5, lines 29-39 * * column 7, lines 4-12 * * figures 1-5 *; | [XYI]EP0951096 (SCHNEIDER ELECTRIC IND SA [FR]) [X] 1-5 * paragraphs [0024] , [0030]; figures 1,2 * [Y] 7-10 [I] 6; | [Y]FR2786611 (LEFEBVRE JEAN JACQUES [FR]) [Y] 7,10* page 4, lines 24-26; figures 1-5 *; | [XYI]DE10056940 (WECO ELECTRICAL CONNECTORS INC [CA]) [X] 1-5,7 * paragraphs [0022] , [0023]; figures 1-5 * [Y] 8-10 [I] 6 | by applicant | EP0687032 | FR2786611 |