EP3196705 - DEVELOPING UNITWITH IMPROVED CONVEYING ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.06.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 14.07.2023 | ||
Former | Grant of patent is intended Status updated on 16.04.2023 | ||
Former | Examination is in progress Status updated on 30.04.2021 | ||
Former | Request for examination was made Status updated on 02.02.2018 | ||
Former | The application has been published Status updated on 23.06.2017 | Most recent event Tooltip | 18.10.2024 | Lapse of the patent in a contracting state New state(s): BE | published on 20.11.2024 [2024/47] | Applicant(s) | For all designated states Xeikon Manufacturing N.V. Duwijckstraat 17 2500 Lier / BE | [2017/30] | Inventor(s) | 01 /
Van Dessel, Bart Jozef Bethaniënlei 143 2980 Zoersel / BE | 02 /
Van de Straete, Herman Jan Godelieve Eduard Van Steenbergenlaan 38 2100 Deurne / BE | [2017/30] | Representative(s) | D'Halleweyn, Nele Veerle Trees Gertrudis, et al Arnold & Siedsma Bezuidenhoutseweg 57 2594 AC The Hague / NL | [2017/30] | Application number, filing date | 17152838.3 | 24.01.2017 | [2017/30] | Priority number, date | NL20162016148 | 25.01.2016 Original published format: NL 2016148 | [2017/30] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3196705 | Date: | 26.07.2017 | Language: | EN | [2017/30] | Type: | B1 Patent specification | No.: | EP3196705 | Date: | 16.08.2023 | Language: | EN | [2023/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.05.2017 | Classification | IPC: | G03G15/08 | [2017/30] | CPC: |
G03G15/0891 (EP,US);
G03G2215/0819 (EP,US);
G03G2215/0827 (EP,US);
G03G2215/0833 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/10] |
Former [2017/30] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ENTWICKLUNGSEINHEIT MIT VERBESSERTER FÖRDERANORDNUNG | [2017/30] | English: | DEVELOPING UNITWITH IMPROVED CONVEYING ASSEMBLY | [2017/30] | French: | ÉLABORATION D'UNE UNITÉ AYANT UN ENSEMBLE DE TRANSPORT AMÉLIORÉ | [2017/30] | Examination procedure | 24.01.2017 | Date on which the examining division has become responsible | 26.01.2018 | Amendment by applicant (claims and/or description) | 26.01.2018 | Examination requested [2018/10] | 03.05.2021 | Despatch of a communication from the examining division (Time limit: M04) | 19.08.2021 | Reply to a communication from the examining division | 17.04.2023 | Communication of intention to grant the patent | 11.07.2023 | Fee for grant paid | 11.07.2023 | Fee for publishing/printing paid | 11.07.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 17.05.2024 | No opposition filed within time limit [2024/30] | Fees paid | Renewal fee | 22.01.2019 | Renewal fee patent year 03 | 23.01.2020 | Renewal fee patent year 04 | 25.01.2021 | Renewal fee patent year 05 | 25.01.2022 | Renewal fee patent year 06 | 25.01.2023 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 16.08.2023 | CZ | 16.08.2023 | DK | 16.08.2023 | EE | 16.08.2023 | ES | 16.08.2023 | FI | 16.08.2023 | HR | 16.08.2023 | IT | 16.08.2023 | LT | 16.08.2023 | LV | 16.08.2023 | MC | 16.08.2023 | NL | 16.08.2023 | PL | 16.08.2023 | RO | 16.08.2023 | RS | 16.08.2023 | SE | 16.08.2023 | SI | 16.08.2023 | SK | 16.08.2023 | SM | 16.08.2023 | NO | 16.11.2023 | GR | 17.11.2023 | IS | 16.12.2023 | PT | 18.12.2023 | LU | 24.01.2024 | BE | 31.01.2024 | [2024/47] |
Former [2024/43] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
MC | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
LU | 24.01.2024 | ||
Former [2024/40] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
MC | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/36] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
IT | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SI | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/23] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
EE | 16.08.2023 | ||
ES | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SK | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/22] | AT | 16.08.2023 | |
CZ | 16.08.2023 | ||
DK | 16.08.2023 | ||
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RO | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/20] | AT | 16.08.2023 | |
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
SM | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/10] | AT | 16.08.2023 | |
FI | 16.08.2023 | ||
HR | 16.08.2023 | ||
LT | 16.08.2023 | ||
LV | 16.08.2023 | ||
NL | 16.08.2023 | ||
PL | 16.08.2023 | ||
RS | 16.08.2023 | ||
SE | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
PT | 18.12.2023 | ||
Former [2024/09] | AT | 16.08.2023 | |
FI | 16.08.2023 | ||
LT | 16.08.2023 | ||
NL | 16.08.2023 | ||
SE | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | ||
IS | 16.12.2023 | ||
Former [2024/08] | LT | 16.08.2023 | |
NL | 16.08.2023 | ||
NO | 16.11.2023 | ||
GR | 17.11.2023 | Documents cited: | Search | [XY]JPS59136758 (FUJI XEROX CO LTD) [X] 1-3 * the whole document * [Y] 4; | [Y]JPH0850406 (RICOH KK) [Y] 1-3,5-8 * the whole document *; | [Y]EP1857886 (RICOH KK [JP]) [Y] 1-3,5-8 * the whole document *; | [X]EP1942379 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1-3 * the whole document *; | [Y]CN204150604U (LIANYUNGANG BOSUN FLOW TRANSP EQUIPMENT CO LTD) [Y] 4* the whole document * | Examination | EP0671669 | US6259876 | US2004213603 | US2006188273 | US2007098450 | JP2008250290 | EP1988430 | US2009257781 | WO2015080444 |