blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3179122

EP3179122 - TWO-PIECE BALL BEARING RETAINER, DEEP GROOVE BALL BEARING, AND BALL BEARING WITH RETAINER AND SEAL [Right-click to bookmark this link]
Former [2017/24]TWO-PIECE BALL BEARING CAGE, DEEP GROOVE BALL BEARING, AND BALL BEARING WITH CAGE AND SEAL
[2020/04]
StatusNo opposition filed within time limit
Status updated on  18.12.2020
Database last updated on 07.06.2024
FormerThe patent has been granted
Status updated on  10.01.2020
FormerGrant of patent is intended
Status updated on  17.09.2019
FormerRequest for examination was made
Status updated on  28.12.2017
FormerThe application has been published
Status updated on  12.05.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
NTN Corporation
3-17, Kyomachibori 1-chome Nishi-ku
Osaka-shi, Osaka 550-0003 / JP
[2017/24]
Inventor(s)01 / WAKUDA, Takahiro
3066, Aza-Oyumida
Oaza-Higashikata
Kuwana-shi, Mie 511-8678 / JP
02 / SASAKI, Katsuaki
1578, Higashikaizuka
Iwata-shi, Shizuoka 438-8510 / JP
03 / FUKAMA, Shohei
1578, Higashikaizuka
Iwata-shi, Shizuoka 438-8510 / JP
 [2017/24]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2017/24]
Application number, filing date17153050.426.05.2009
[2017/24]
Priority number, dateJP2008015590913.06.2008         Original published format: JP 2008155909
JP2008017862009.07.2008         Original published format: JP 2008178620
[2017/24]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3179122
Date:14.06.2017
Language:EN
[2017/24]
Type: B1 Patent specification 
No.:EP3179122
Date:12.02.2020
Language:EN
[2020/07]
Search report(s)(Supplementary) European search report - dispatched on:EP28.03.2017
ClassificationIPC:F16C33/42, F16C33/78, // F16C33/66
[2017/24]
CPC:
F16C33/7853 (EP,US); F16C33/3887 (EP,US); F16C33/427 (EP,US);
F16C33/6681 (EP,US); F16C33/7823 (EP,US); F16C19/06 (EP,US);
F16C2361/61 (EP,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2018/04]
Former [2017/24]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:ZWEITEILIGER KUGELLAGERKÄFIG, RILLENKUGELLAGER UND KUGELLAGER MIT KÄFIG UND DICHTUNG[2017/24]
English:TWO-PIECE BALL BEARING RETAINER, DEEP GROOVE BALL BEARING, AND BALL BEARING WITH RETAINER AND SEAL[2020/04]
French:CAGE EN DEUX PIÈCES DE ROULEMENT À BILLES, ROULEMENT À BILLES À GORGES PROFONDES, ET ROULEMENT À BILLES AVEC CAGE ET JOINT D'ÉTANCHÉITÉ[2017/24]
Former [2017/24]TWO-PIECE BALL BEARING CAGE, DEEP GROOVE BALL BEARING, AND BALL BEARING WITH CAGE AND SEAL
Examination procedure25.01.2017Date on which the examining division has become responsible
13.12.2017Amendment by applicant (claims and/or description)
13.12.2017Examination requested  [2018/04]
18.09.2019Communication of intention to grant the patent
02.01.2020Fee for grant paid
02.01.2020Fee for publishing/printing paid
02.01.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP09762365.6  / EP2287481
Opposition(s)13.11.2020No opposition filed within time limit [2021/03]
Fees paidRenewal fee
25.01.2017Renewal fee patent year 03
25.01.2017Renewal fee patent year 04
25.01.2017Renewal fee patent year 05
25.01.2017Renewal fee patent year 06
25.01.2017Renewal fee patent year 07
25.01.2017Renewal fee patent year 08
29.05.2017Renewal fee patent year 09
28.05.2018Renewal fee patent year 10
28.05.2019Renewal fee patent year 11
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.05.2009
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MK12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
TR12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
GB26.05.2020
IE26.05.2020
LU26.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
IS12.06.2020
PT05.07.2020
[2022/32]
Former [2022/27]HU26.05.2009
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
TR12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
GB26.05.2020
IE26.05.2020
LU26.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/24]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
GB26.05.2020
IE26.05.2020
LU26.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/22]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
GB26.05.2020
IE26.05.2020
LU26.05.2020
CH31.05.2020
LI31.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/20]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IE26.05.2020
LU26.05.2020
CH31.05.2020
LI31.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/15]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
LU26.05.2020
CH31.05.2020
LI31.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/10]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
CH31.05.2020
LI31.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/07]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
SE12.02.2020
SK12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
CH31.05.2020
LI31.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/50]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
SE12.02.2020
SK12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/49]CZ12.02.2020
DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
SE12.02.2020
SK12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/48]DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/47]DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/45]FI12.02.2020
HR12.02.2020
LV12.02.2020
NL12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/40]FI12.02.2020
HR12.02.2020
LV12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/39]FI12.02.2020
HR12.02.2020
LV12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
Former [2020/38]FI12.02.2020
HR12.02.2020
LV12.02.2020
SE12.02.2020
NO12.05.2020
GR13.05.2020
Former [2020/37]FI12.02.2020
HR12.02.2020
LV12.02.2020
SE12.02.2020
NO12.05.2020
Former [2020/35]FI12.02.2020
NO12.05.2020
Documents cited:Search[X]DE296238  (DEUTSCHE WAFFEN- UND MUNITIONSFABRIKEN IN BERLIN) [X] 1,2,4,8 * the whole document *;
 [A]US1241669  (SCHNEIDER STEFAN [US]) [A] 1,3,4,8 * the whole document *;
 [YA]US1494012  (PARSONS HARRY N) [Y] 5 * page 1, line 35 - line 71; figures 1-7 * [A] 1,4,8;
 [XY]US1712222  (LINDE ANDREW H) [X] 1,3,4,8 * page 1, line 39 - line 94; figures 1-5 * [Y] 5,7,9-14;
 [Y]US3572857  (HASEGAWA HISAO) [Y] 9,10,13,14 * the whole document *;
 [X]JPS4634244Y  (N.N) [X] 1,3,4,8 * figures 2-4 *;
 [X]SU461254  (N.N.) [X] 1,3,4,8 * figures 1-3 *;
 [Y]DE2803093  (STEYR DAIMLER PUCH AG) [Y] 9,10,14* the whole document *;
 [Y]US4428629  (COLANZI FRANCO [IT], et al) [Y] 9-12,14 * the whole document *;
 [YA]JP2006226448  (NTN TOYO BEARING CO LTD) [Y] 7 * abstract * [A] 1,8
by applicantJP2003013962
 JP2006342901
 JP2007107588
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.