blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3220220

EP3220220 - EVALUATION SYSTEM, EVALUATION METHOD, AND EVALUATION PROGRAM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.10.2021
Database last updated on 02.07.2024
FormerThe patent has been granted
Status updated on  23.10.2020
FormerGrant of patent is intended
Status updated on  29.07.2020
FormerExamination is in progress
Status updated on  04.05.2019
FormerRequest for examination was made
Status updated on  18.08.2017
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Omron Corporation
801, Minamifudodo-cho
Horikawahigashiiru
Shiokoji-dori
Shimogyo-ku, Kyoto-shi
Kyoto 600-8530 / JP
[2017/38]
Inventor(s)01 / FUJIMURA, Ryosuke
c/o OMRON Corporation
801, Minamifudodo-cho
Horikawahigashiiru
Shiokoji-dori, Shimogyo-ku
Kyoto-shi, Kyoto 600-8530 / JP
02 / TAKUMA, Nobuyuki
c/o OMRON Corporation
801, Minamifudodo-cho
Horikawahigashiiru
Shiokoji-dori, Shimogyo-ku
Kyoto-shi, Kyoto 600-8530 / JP
03 / SUGANUMA, Hiromu
c/o OMRON Corporation
801, Minamifudodo-cho
Horikawahigashiiru
Shiokoji-dori, Shimogyo-ku
Kyoto-shi, Kyoto 600-8530 / JP
04 / MATSUI, Asahi
c/o OMRON Corporation
801, Minamifudodo-cho
Horikawahigashiiru
Shiokoji-dori, Shimogyo-ku
Kyoto-shi, Kyoto 600-8530 / JP
05 / INOUE, Masaya
c/o OMRON Corporation
801, Minamifudodo-cho
Horikawahigashiiru
Shiokoji-dori, Shimogyo-ku
Kyoto-shi, Kyoto 600-8530 / JP
 [2017/38]
Representative(s)Mewburn Ellis LLP
Aurora Building
Counterslip
Bristol BS1 6BX / GB
[2020/48]
Former [2017/38]Addiss, John William, et al
Mewburn Ellis LLP
City Tower
40 Basinghall Street
London EC2V 5DE / GB
Application number, filing date17153126.225.01.2017
[2017/38]
Priority number, dateJP2016004993314.03.2016         Original published format: JP 2016049933
[2017/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3220220
Date:20.09.2017
Language:EN
[2017/38]
Type: B1 Patent specification 
No.:EP3220220
Date:25.11.2020
Language:EN
[2020/48]
Search report(s)(Supplementary) European search report - dispatched on:EP19.07.2017
ClassificationIPC:G05B19/042, G05B19/048, G06F11/277
[2017/38]
CPC:
G05B19/0428 (EP,US); G05B19/054 (CN); G06F11/3612 (US);
G05B19/048 (EP,US); G06F11/277 (US); G06F11/3692 (US);
G05B2219/1105 (CN) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/38]
TitleGerman:BEURTEILUNGSSYSTEM, BEURTEILUNGSVERFAHREN UND BEURTEILUNGSPROGRAMM[2017/38]
English:EVALUATION SYSTEM, EVALUATION METHOD, AND EVALUATION PROGRAM[2017/38]
French:SYSTÈME D'ÉVALUATION, PROCÉDÉ D'ÉVALUATION ET PROGRAMME D'ÉVALUATION[2017/38]
Examination procedure25.01.2017Date on which the examining division has become responsible
27.01.2017Examination requested  [2017/38]
03.01.2018Amendment by applicant (claims and/or description)
08.05.2019Despatch of a communication from the examining division (Time limit: M04)
22.08.2019Reply to a communication from the examining division
30.07.2020Communication of intention to grant the patent
19.10.2020Fee for grant paid
19.10.2020Fee for publishing/printing paid
19.10.2020Receipt of the translation of the claim(s)
Opposition(s)26.08.2021No opposition filed within time limit [2021/44]
Fees paidRenewal fee
16.01.2019Renewal fee patent year 03
13.01.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.01.2017
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
MK25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
TR25.11.2020
FR25.01.2021
IE25.01.2021
LU25.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
BG25.02.2021
GB25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
[2024/29]
Former [2024/22]HU25.01.2017
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
MK25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
IE25.01.2021
LU25.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
BG25.02.2021
GB25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2023/30]HU25.01.2017
AL25.11.2020
AT25.11.2020
CY25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
IE25.01.2021
LU25.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
BG25.02.2021
GB25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2023/27]HU25.01.2017
AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
IE25.01.2021
LU25.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
BG25.02.2021
GB25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/34]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
IE25.01.2021
LU25.01.2021
BE31.01.2021
CH31.01.2021
LI31.01.2021
BG25.02.2021
GB25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/23]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
IE25.01.2021
LU25.01.2021
CH31.01.2021
LI31.01.2021
BG25.02.2021
GB25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/10]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
IE25.01.2021
LU25.01.2021
CH31.01.2021
LI31.01.2021
BG25.02.2021
GB25.02.2021
NO25.02.2021
GR26.02.2021
PT25.03.2021
Former [2022/08]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
ES25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
IE25.01.2021
LU25.01.2021
CH31.01.2021
LI31.01.2021
BG25.02.2021
GB25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2022/07]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
IE25.01.2021
LU25.01.2021
CH31.01.2021
LI31.01.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/52]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
LU25.01.2021
CH31.01.2021
LI31.01.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/50]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SI25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
LU25.01.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/48]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
IT25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
FR25.01.2021
LU25.01.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/46]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
NL25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
LU25.01.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/45]AL25.11.2020
AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
LU25.01.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/43]AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
LU25.01.2021
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/40]AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
MC25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/37]AT25.11.2020
CZ25.11.2020
DK25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/36]AT25.11.2020
CZ25.11.2020
EE25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/35]AT25.11.2020
CZ25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RO25.11.2020
RS25.11.2020
SE25.11.2020
SK25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/34]AT25.11.2020
CZ25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/33]AT25.11.2020
FI25.11.2020
HR25.11.2020
LT25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/32]AT25.11.2020
FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
SM25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/28]AT25.11.2020
FI25.11.2020
HR25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/25]AT25.11.2020
FI25.11.2020
LV25.11.2020
PL25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
IS25.03.2021
PT25.03.2021
Former [2021/23]AT25.11.2020
FI25.11.2020
LV25.11.2020
RS25.11.2020
SE25.11.2020
BG25.02.2021
NO25.02.2021
GR26.02.2021
PT25.03.2021
Former [2021/22]FI25.11.2020
RS25.11.2020
NO25.02.2021
PT25.03.2021
Former [2021/21]FI25.11.2020
PT25.03.2021
Former [2021/20]FI25.11.2020
Documents cited:Search[Y]US5182755  (SEKIGUCHI AKIRA [JP], et al) [Y] 6-9 * column 4, line 41 - column 5, line 43; figures 2-4 * * column 9, line 13 - column 10, line 32; figure 8 * * column 10, line 60 - column 11, line 20; figure 11 * * claim 11 *;
 [XYI]EP0610711  (BOSCH GMBH ROBERT [DE]) [X] 1,4,5,10,11 * column 3, line 15 - column 4, line 23; figure 1 * [Y] 6-9 [I] 2,3;
 [A]US6879891  (BEDERNA FRANK [IT]) [A] 1-11* column 5, line 23 - column 6, line 46; figure 2 *;
 [XY]WO2009105889  (WURLDTECH SECURITY TECHNOLOGIE [CA], et al) [X] 1,10,11 * paragraph [0013] - paragraph [0014] * * paragraph [0019] - paragraph [0021]; figures 1A-B * * paragraph [0027] - paragraph [0031]; figure 2 and 3 * [Y] 6-9
by applicantJP2014137621
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.